In recent years, not only the occurrences but the magnitude of earthquakes in Korea are on an increasing trend and other sources of dynamic events including large-scale construction, operation of hi띤-speed railway and explosives blasting have been increasing. Besides, the probability of exposure fir rock joints to free faces gets higher as the scale of rock mass structures becomes larger. For that reason, the frictional behavior of rock joints under dynamic conditions needs to be investigated. In this study, a shaking table test system was set up and a series of dynamic test was carried out to examine the dynamic frictional behavior of rock joints. In addition, a computer program was developed, which calculated the acceleration and deformation of the sliding block theoretically based on Newmark sliding block procedure. The static friction angle was back-calculated by measuring yield acceleration at the onset of slide. The dynamic friction angle was estimated by closely approximating the experimental results to the program-simulated responses. As a result of dynamic testing, the static friction angle at the onset of slide as well as the dynamic friction angle during sliding were estimated to be significantly lower than tilt angle. The difference between the tilt angle and the static friction angle was $4.5\~8.2^{\circ}$ and the difference between the tilt angle and the dynamic friction angle was $2.0\~7.5^{\circ}$. The decreasing trend was influenced by the magnitude of the base acceleration and inclination angle. A DEM program was used to simulate the shaking table test and the result well simulated the experimental behavior. Friction angles obtained by shaking table test were significantly lower than basic friction angle by direct shear test.
Oil contamination soil has been one of the most environmental social issues for decades in the inside and outside of country. The law of soil environmental preservation was carried out in the 1990s and the government controlled not only soil environment management and the remediation of contaminated soil but also promoted the development of remedial technology and cleanup business of contaminated soil by national policy. In addition to agriculture areas, the main oil contaminated sites are a gas station, oil reservoir, petro-chemical complex, site of railway carriage base and military camp. The contamination-frequency of agriculture area and effect sites are low but it has significantly important area on account of producing food for human beings. Therefore, we should be concerned about oil contamination damage of agriculture area. The oil contamination damage of agriculture area influenced drop of birth and breeding since the oil directly adheres to seeds and farm products even diffusion of contaminated soil to cultivation area. The studies of the crops and the food vegetation has not enough detailed data caused by the incident of oil contamination. This study investigated the effect of oil in germination and growth of selected plant seeds. In this study, we try to verify whether the oil contamination by accidents on farmland influenced the damage of farm produce and the mutual relation both oil contaminated soil or the vegetation of crops. The impact of oil on plant development was followed by phytotoxicity assessments. The plants exhibited visual symptoms of stress, growth reduction and perturbations in developmental parameters. The increase of the degree of pollution induced more marked effects in plants, likely because of the physical effects of oil. The relationships between the phytotoxicity contents of plants and growth reduction suggest a chemical toxicity of fuel oil. In addition, while cleaned up the contaminated soil under the standard of contaminated soil we examined it was suitable for region standard and it may have practical possibility for fill material of construction of afforestation and molding soil of landfill.
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.1
/
pp.105-114
/
2016
With approximately 20 million transportation card data entries of the metropolitan districts being generated per day, application of the data to management and policy interventions is becoming an issue of interest. The research herein attempts a model of the possibility of dynamic demand change predictions and its purpose is thereby to construct a Dynamic Passengers Trip Assignment Model. The model and algorithm created are targeted at city rail lines operated by seven different transport facilities with the exclusion of travel by bus, as passenger movements by this mode can be minutely disaggregated through card tagging. The model created has been constructed in continuous time as is fitting to the big data characteristic of transport card data, while passenger path choice behavior is effectively represented using a perception parameter as a function of increasing number of transfers. Running the model on 800 pairs of metropolitan city rail data has proven its capability in determining dynamic demand at any moment in time, in line with the typical advantages expected of a continuous time-based model. Comparison against data measured by the eye of existing rail operating facilities to assess changes in congestion intensity shows that the model closely approximates the values and trends of the existing data with high levels of confidence. Future research efforts should be directed toward continued examination into construction of an integrated bus-city rail system model.
Journal of Korean Tunnelling and Underground Space Association
/
v.4
no.4
/
pp.277-286
/
2002
Most of the problems in dealing with the tunnel construction are the uncertainties and complexities of the stress conditions and rock strengths in ahead of the tunnel excavation. The limitations on the investigation technology, inaccessibility of borehole test in mountain area and public hatred also restrict our knowledge on the geologic conditions on the mountainous tunneling area. Nevertheless an extensive and superior geophysical exploration data is possibly acquired deep within the mountain area, with up to the tunnel locations in the case of alternative design or turn-key base projects. An appealing claim in the use of artificial neural networks (ANN) is that they give a more trustworthy results on our data based on identifying relevant input variables such as a little geotechnical information and biological learning principles. In this study, error back-propagation algorithm that is one of the teaching techniques of ANN is applied to presupposition on Rock Mass Ratings (RMR) for unknown tunnel area. In order to verify the applicability of this model, a 4km railway tunnel's field data are verified and used as input parameters for the prediction of RMR, with the learned pattern by error back propagation logics. ANN is one of basic methods in solving the geotechnical uncertainties and helpful in solving the problems with data consistency, but needs some modification on the technical problems and we hope our study to be developed in the future design work.
Journal of Korean Tunnelling and Underground Space Association
/
v.17
no.3
/
pp.249-256
/
2015
Quantitative Mokpo-Jeju undersea tunnel is currently on the basis plan for reviewing validation. As for the cross section shape for express boat of 105 km line, sing track two tube is being reviewed as the Euro tunnel equipped with service tunnel. Also, 10 carriage trains have been planned to operate 76 times for one way a day. So, in this study, quantitative risk assessment method is settled, which is intended to review the optimal space between evacuation connection hall of tunnel by quantitative risk analysis method. In addition to this, optimal evacuation connection hall space is calculated by the types of cross section, which are Type 3 (double track single tube), Type 1 (sing track two tube), and Type 2 (separating double track on tube with partition). As a result, cross section of Type 2 is most efficient for securing evacuation safety, and the evacuation connection space is required for 350 m in Type 1, 400 m in Type 2, and 1,500 m in Type3 to satisfy current domestic social risk assessment standard.
Kim, Ick-Hee;Yun, Dong-Hee;Kum, Ki-Jung;Lee, Sang-Myoung
Journal of Korean Society of Transportation
/
v.30
no.3
/
pp.95-106
/
2012
The railway service in the Seoul metropolitan area is facing variety of l changes such as extension of service coverage, new construction, and introduction of express service which in turn causes changes on demands. The demand affects train operation characteristics (frequency of service, train formation) as well as on the congestion rate which is one of the major evaluation index in metropolitan area user service. For the efficient operation of the train, the relationship among the minimization of fleet number, operating cost, and service level has been analyzed. Using the Powersim, which is a system dynamics (System Dynamics) simulation program for realizing optimized simulation for train-formation, this paper identified that some stations of Gyeong-bu line exceeded limit congestion rate(150%) of a fleet already that means it is best to maintain current condition of the line; however, the Gyeong-in line and the Gwa-chon line showed no excess of the limit congestion rate so that it is possible to reduce 2-4 fleets of train for efficient operation. In addition, in case of Jang-hang line between Cheon-an and Sin-chang, a train consisting of 10 fleets provides services which is same formation of train for Gyeong-bu line. This study proved that the congestion rate will not rise greatly with only 4 fleets of a train for the service in Jang-hang line, and it is considered that a study for shuttle service between Cheon-an and Sin-chang is necessary.
The objective of this study is to analyze the project performance and development process of the phase 1 project of GFEZ from 2004 to 2010. The phase 1 project from 2004 to 2010 is consist of eleven project zones. Among these zones, eight zones are currently underway and three zones have been completed. The performance of the phase 1 projects is no so much because it were stated later than planning with the difficulty of business developers selection. The major performances are development and supply of industrial & residential land, construction of road and railway, investment promotion of 102 companies, and creation of 20,971 new jobs. Most of the direct invested companies were located at Gwangyang and Yulchon Districts, and were mainly logistics and related service, iron and steel, machinery, shipbuilding, and fine chemicals. The main problems, however, are the limit of promotion of high-tech industries and large firms, low FDI reported rate, difficulty of superior business developers, delayed business progress of Hadong district. Therefore, efforts to solve these problems are required for the success of GFEZ.
The purpose of this paper is "A Study on the Establishment of Distribution and Logistics System in the unified Korea". The main conclusion of this paper are as follows : North and South Korea shall conjunctionally foster the exchange and cooperation area and operate the joint pilot project to combine distribution and logistics system. To solve the problems of the maritime affairs, Fisheries, and international logistics, the cooperative agreement between North and South Korea will be needed to protect and develop of shipping, aviation and shipbuilding industry. Unification of two Koreas must be prepared as stage by stage ; ${\cdot}$Stage1(preparation period) : initiation of peace area. ${\cdot}$Stage2(development period) : forming the exchange and cooperation area ${\cdot}$Stage3(settlement period) : establishing peace belt on border area. After the unification, two Koreas must plan and undertake the construction of the distribution and logistics infrastructures, establishment of SCM system through Network and the connection to China through railway and road Network.
With the hubbing strategy, construction of "Incheon Airport Railroad(AREX)" was proceeded to expand the accessibility at the level of airports in rivalry like Kansai and Chek Lap Kok. At the present 1st phase which routes from Incheon Airport to Kimpo Airport is opened March 2007. 2nd phase which is planned from Kimpo Airport to Seoul station will be opened at the end of October 2010. But the accessibilty to AREX is delinquent because it is connected only in Seoul station and the maximum operation speed is 110km/h which downgrade the time competitiveness with airport limousine. In addition, transfering of user is necessary to access to AREX from Kyungbu KTX. With these reasons, travel demand in 1st phase section is low(7%). According to reestimation of travel demand, demand analysis result compared with convention condition is insufficient, so required annual average government grant-in-aid amounts to 200 billions won, and it is right time to develop the method for revitalization of Incheon airport railroad. In this paper, facilities plan and operating plan to make new travel demand by speed-up which is able through substitution train now running with high speed train(EMU, 180km/h) and direct connection of KTX, will be suggested. This will contribute to offering high speed railroad service to customers and the reduction of government grant-in-aid by way of demand expansion.
Journal of Korean Society of Archives and Records Management
/
v.16
no.2
/
pp.143-172
/
2016
This study analyzes the process of growth of Busan from a fishing village to the capital city of South Gyeongsang Province and the central city of transportation and commerce, and an industry with records. The results of the analysis are as follows: after the port opened in 1876, there has been a decline in settlement spaces in Dongnae; on the other hand, there has been an increase in migration spaces around the port of Busan. Waegwan (倭館) nearby Yongdusan Mountain (龍頭山) was changed to the Japanese concession; thus, the number of Japanese moving into Busan had rapidly increased. As a result, the Japanese government carried out reclamation work for securing available lands for the construction of port facilities and other facilities. The Japanese government built public offices and houses, as well as production facilities for daily necessities around the port of Busan. The opening of the Seoul Busan railway (京釜線) and the cross-channel liner between Busan and Shimonoseki (釜關連絡船) led to the growth of Busan and the development of its status. At this time, as the main industry of Busan was trade, Busan had grown as a commercial city. As Busan had grown as a central city of transportation and commerce, the provincial government building of Gyeongsangnam-do (慶尙南道) moved to Busan. Thus, Busan became the central city of local politics and administration. After the Land Survey Project, a large scale of farmers were recruited for low-wage work in the new port. Because of the abolition of the corporation law, Japanese capitalists moved into their colony in Busan. There, large-scale factories, such as the Joseon cotton textile factory, were established. Through this process, the locality of Busan was changed from a fishing village to a commercial city and, finally, to a city of commerce and industry.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.