• Title/Summary/Keyword: railroad system

Search Result 2,235, Processing Time 0.03 seconds

Preliminary Hazard Analysis of the ATC System for Electrical Hazards (전기적 위험요인에 대한 열차제어시스템의 예비위험요인분석)

  • Joung E. J.;Kim J. K.;Shin D. H.;Kim B. H.;Lee J. W.;Kim Y. M.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.1415-1417
    • /
    • 2004
  • The system safety must be ensured before customization. There was no specific requirement representing system safety in Korea until now. So we should draw safety requirements to guarantee system safety for the first time. In this paper. the hazard identification and analysis to derive the safety requirements on the train control system are carried out. To analyze hazard, we have to deduce system functions. identify related hazards, derive the effects of the hazards, analyze current risks. define the target risks of the system, and deduce the alternative plans to reduce the effects of the hazards. For the case study, Preliminary Hazard Analysis(PHA) of the Automatic Train Control (ATC) System for Electrical Hazards are carried out.

  • PDF

A Study on the Physical Examination for Railroad Workers (철도 안전업무종사자의 신체검사에 대한 연구)

  • Kook, Kwang-Ho;Shin, Tack-Hyun;Kim, Jun-Gyu
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.600-604
    • /
    • 2007
  • Techniques related to railroad industry have progressed rapidly and the automation of work is prevailing. Since the railroad accidents due to the human error occupy considerable proportion among the railroad accidents, it is necessary to study the propriety of the physical examination system for the railroad workers. In this paper, we perform a comparative analysis of domestic and foreign physical examination systems for railroad workers. Through the comparative analysis, we suggest that test of the sleep-disorder be included in the physical examination.

  • PDF

Study of Automatic Train Control using RTOS (RTOS를 이용한 전동차 자동열차운전장치 연구)

  • Lee, Su-Gil;Han, Seong-Ho;You, Won-Hee;Mun, Hyeong-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2002.11d
    • /
    • pp.356-358
    • /
    • 2002
  • The automatic/driverless operation which are great important techniques in metro railway are required to increase higher safety, greater reliability, and transport capacity. This paper describes the method to develop the ATO software system. The software design is based on VxWorks, a Real Time Operating System.

  • PDF

Construction of Integrated Signalling System for Next-generation High-Speed Train (한국형 고속전철용 신호시스템 시제품의 시험을 위한 통합신호시스템 구축)

  • Hwang, Jong-Gyu;Shin, Duck-Ho;Joung, Eui-Jin;Lee, Jong-Woo
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1220-1222
    • /
    • 2002
  • The railway signaling system consists of several vital computerized equipments. Now the project for development of signaling system for the next-generation high-speed train is progressed according to the consortium. The developing signaling system by this project, kTCS(Korean Train Control System), is composed of kTCS-CTC, kTCS-IXL, kTCS-ATC and etc. The KTCS signaling has to be operated as a integrated system by interface between each signaling. To achieve these, communication protocols between each signaling have to be designed and message codes are defined. In this paper the configuration of integrated kTCS system and designed communication protocol is presented.

  • PDF

Analysis on Installation Condition According to Dynamic Characteristics for Overhead Catenary System (전차선로 동적특성에 따른 설치상태 분석)

  • Park, Young;Lee, Kiwon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.9
    • /
    • pp.1605-1609
    • /
    • 2016
  • The measurement of current collection performance between pantograph and contact wire of overhead catenary system is intended to prove the safety of operation and the quality of the current collection system. The results of interaction performance of current collection system are required for approving with commercial operation on railway lines. The methods of interaction performance of current collection system are defined on interactional standards such as IEC 62486 and EN 50317. In this paper, the interaction performance is evaluated by the percentage of arcing on Honam high-speed line and the results are used for adjustment of the overhead catenary line structure. The experimental results in Honam high-speed line confirm that the duration of an arc lasting longer 25 ms between pantograph and contact wire was depended on the conditions of overhead contact line after installation.

Development of EMTDC Model for Electrified Railroad Supply System (전철 급전계통의 EMTDC 모델개발)

  • 윤재영;최흥관;김종율
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.12
    • /
    • pp.624-629
    • /
    • 2002
  • This paper presents the first Simulation model using EMTDC program to analyze the electrified train voltage distribution characteristics in ac auto-transformer 1110 railroads. In general, all of the electrified train supply system has the characteristics that the train supply line is a naturally non-symmetrical and unbalanced system. Also, it is needed to model the Scott transformer which invert the balanced 3-phase quantity into 2-phase. Therefore, the general simulation methodology using previous simplified equivalent circuit or RMS based program can't obtain the accurate results to reflect the real-time operation because these methodology is basically assumed on completely 3-phase balanced system. To overcome these defects, in this paper, the EMTDC simulation model to analysis the completely electrified railroad system with Scott transformer and AC auto-transformer is presented. Also, the correctness of EMTDC modeling is confirmed by the old basic concepts and we think that this EMTDC model has the future powerful capability for application of railroad system analysis.

Model development of electrified railroad supply system for Electromagnetic Transient Analysis (순시치 해석용 전철급전계통 모델개발)

  • 윤재영;최흥관;김종율;위상봉
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.4
    • /
    • pp.253-259
    • /
    • 2002
  • This paper presents the first simulation model using EMTDC program to analyze the electrified train voltage distribution characteristics in ac auto-transformer fed railroads. In general, all of the electrified train supply system has the characteristics that the train supply line is a naturally non-symmetrical and unbalanced system. Also, it is needed to model the Scott transformer which invert the balanced 3-phase quantity into 2-phase. Therefore, the general simulation methodology using previous simplified equivalent circuit or RMS based program can't obtain the accurate results to reflect the real-time operation because these methodology is basically assumed on completely 3-phase balanced system. To overcome these defects, in this paper, the EMTDC simulation model to analysis the completely electrified railroad system with Scott transformer and AC auto-transformer is presented. Also, the correctness of EMTDC modeling is confirmed by the old basic concepts and we think that this EMTDC model has the future powerful capability for application of railroad system analysis.

Driving System of Korea Bimodal Tram (Korea Bimodal Tram의 운행시스템)

  • Byun, Yeun-Sub;Yoon, Hee-Taek;Mok, Jei-Kyun;Kim, Young-Chol
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1695-1696
    • /
    • 2008
  • KRRI (Korea Railroad Research Institute) is developing a bimodal tram since the 2003s. The vehicle will be used in the public transportation system. The bimodal tram has the advantages of both bus and train. Bus system has the advantages of flexibility of the routes delivering passengers to the destination and easy accessibility. Train is to meet the scheduled arrival and massive public transportations. The vehicle is the rubber tired tram and is all wheel steered single articulation. The propulsion system is configured by CNG hybrid system. The length of the vehicle is 18m. The vehicle lanes will be marked with permanent magnets that are buried in the road. The vehicle can be automatically operated by navigation control system (NCS). In this paper, we introduce the driving system of the bimodal tram which is developed by KRRI.

  • PDF

Failure Analysis of Train Control System for Hign Speed Line by CAMS (CAMS에 의한 고속선 열차제어시스템의 장애 분석)

  • Kim, Yong-Kyu;Baek, Jong-Hyun;Kim, Jong-Ki;Shin, Duck-Ho
    • Proceedings of the IEEK Conference
    • /
    • 2006.06a
    • /
    • pp.973-974
    • /
    • 2006
  • In this paper, Computer-aided Maintenance Equipments, which are being used in maintenance, are applied to analyze failures in train control systems, resulting in long time delays of trains. It can be expected to extend and apply CAMS (Computer Aided Maintenance System) in the hereafter efficient operation and maintenance of high-speed railway train control systems, by comparison between the analysis result of fundamental causes, from high-speed railway train control system failures occurred during the operational process, and predictive result of failure causes, based on the recording data of CAMS when failures were occurred.

  • PDF