• Title/Summary/Keyword: rail traffic

Search Result 219, Processing Time 0.029 seconds

Localization Effort of Rail Grade Crossing Impact Analysis with GradeDec2000 (건널목 개선사업 효과의 계략적 평가 방법의 적용)

  • 조성훈;서선덕;권경숙
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.88-96
    • /
    • 2001
  • Rail crossings are major accident-prone areas. Higher traffic volume, frequent rail operation, increased train speed all contribute to increased accident rate and severity In Korea efforts are being made to upgrade currently at-grade rail crossings to grade crossings. There is, however, no quantified analysis measures to analyse the impact of rail grade crossing, thus make it difficult to prioritize different projects under the budget constraints. Projects are selected based on the negotiation between Korea National Railway(KNR) and local governments. To shed light on the development effort for Korean procedure, GradeDec 2000 program of Federal Railroad Adminstration(FRA) was applied for Korean context. Case study involving three rail crossing was ca]lied out, and results are analyzed. Research efforts which need further attention are identified, research direction is analyzed considering local procedure, and issues in the application of the procedures are discussed in detail.

  • PDF

A Primary Study on High Speed Intermodal Rail Freight Transportation (고속철도시대의 철도화물 수송정책-고속철도 복합운송을 중심으로)

  • Kim Hyun-Woog;Moon Dae-Seop
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.185-189
    • /
    • 2003
  • According to opening Seoul-Busan high speed rail line in 2004, we are studying to offer speedily for the parcel service of high speed rail-combined transport as it does, tender the quality freight services within a one and the same high speed train formation. Therefore, we reviewed for various types of HSR-combined transport and suggested to application methods in Korean high speed rail line. Through these kinds of approaches, we are able to expect the fulfillment of customer needs for high speed rail market segments, the profit maximization of future railway operating companies, and enhancement for cost-effective rail network operation of the mixed traffic on infrastructure cost-reduction in national logistics.

  • PDF

The Preliminary Analysis of Introducing 500 km/h High-Speed Rail in Korea

  • Lee, Kwang-Sub;Eom, Jin Ki;Lee, Jun;Moon, Dae Seop
    • International Journal of Railway
    • /
    • v.6 no.1
    • /
    • pp.26-31
    • /
    • 2013
  • Following the success of the KTX (Korea's first high-speed rail system) with a maximum operating speed of 300 km/h opened in 2004, experts in Korea started a research on the development of key technologies for high-speed rail (HSR) with a top speed of 500 km/h. This paper is a preliminary analysis of the research. It first reviews HSR experiences around the world, in terms of traffic and economic impacts of HSR, and presents a preliminary analysis of 500 km/h HSR in Korea. It is estimated that introduction of 500 km/h HSR with a 54% of travel time reduction will increase HSR passengers to about 9.8 million (about 78% of market share) between Seoul and Busan. It is a 23% of growth compared to the base scenario. Along with conventional rail passengers, air passengers are expected to be significantly impacted by the 500 km/h HSR. As a function of HSR travel time, the estimated market shares of both KTX and 500 km/h HSR compared to air are very comparable with previous international experiences. Based on the forecasted traffic, estimated total benefits are $758 million per year.

Gantry Robot with Extended Workspace for Pavement Sign Painting Operations

  • Hong Daehie;Lee Woo-Chang;Chu Baeksuk;Kim Tae-Hyung;Choi Woo Chun
    • Journal of Mechanical Science and Technology
    • /
    • v.19 no.6
    • /
    • pp.1268-1279
    • /
    • 2005
  • The current method for pavement sign marking operations is labor-intensive and very dangerous due to the exposure of workers to passing traffic. It also requires blocking traffic for a long period of time resulting serious traffic jam. This paper deals with the development of a robotic system for automating the pavement sign painting operations. The robotic system consists of gantry frame equipped with transverse drive rail and automatic paint spray system. The workspace of the gantry robot is extended to one-lane width with the transverse rail system. This research also includes the development of font data structures that contain the shape information of pavement signs, such as Korean letters, English letters and symbols. The robot path is generated with this font data through the procedures of scaling up/down and partitioning the signs to be painted depending on the workspace size.

An effect of rail accumulated passing tonnage measurement device which uses a optical fiber sensor rail pad (광섬유센서 레일패드를 이용한 레일누적통과톤수 실측장치의 효용성 분석)

  • Shin, Hyo-Jeong;Park, Eun-Yong;Kong, Sun-Yong;Kim, Bag-Jin
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.91-98
    • /
    • 2009
  • For maintaining railroad, accumulated passing tonnage is a determinant factor of appropriate rail replacement time. Recently, Seoul Metro's rail maintaining system and technology is being improved from previous years, which increasing a standard of rail replacement. Thus, this brings importance of estimating and managing for accumulated passing tonnage. In case of light weighted train such as subway, current method of calculating accumulated passing tonnage has defaults of misrepresenting accumulated passing tonnage data. Because current method is based on the weight of passengers and train., and operation data. In addition, currently there is no mechanical and electronic system that could represent and support the accurate data between heavy and non-heavy traffic area, and accumulated passing tonnage is calculated inaccurately by estimating average value each line. The current method of calculating accumulated passing tonnage misleads to unpredictable data that represent inappropriate rail replacement period, which leads to under or over analyzed replacement period. If accumulated passing tonnage is over estimated, rail replacement leads to waste of budget. Hence, it is necessary to construct reliable actual measurement system to manage rail's life safely and efficiently, and in this study the accumulated passing tonnage measurement device is installed with using rail pad of optical fiber sensors and its effect is analyzed.

  • PDF

Design of Highway Accident Detection and Alarm System Based on Internet of Things Guard Rail (IoT 가드레일 기반의 고속도로 사고감지 및 경보 시스템 설계)

  • Oh, Am-Suk
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.23 no.12
    • /
    • pp.1500-1505
    • /
    • 2019
  • Currently, as part of the ICT Smart City, the company is building C-ITS(Cooperative-Intelligent Transport Systems) for solving urban traffic problems. In order to realize autonomous driving service with C-ITS, the role of advanced road infrastructure is important. In addition to the study of mid- to long-term C-ITS and autonomous driving services, it is necessary to present more realistic solutions for road traffic safety in the short term. Therefore, in this paper, we propose a highway accident detection alarm system that can detect and analyze traffic flow and risk information, which are essential information of C-ITS, based on IoT guard rail and provide immediate alarm and remote control. Intelligent IoT guard rail is expected to be used as an intelligent advanced road infrastructure that provides data at actual road sites that are required by C-ITS and self-driving services in the long term.

Comparative Analysis of the Use of a Pedestrian Facility for Non-Mobility Handicapped and Mobility Handicapped in Urban Rail Station (일반인과 교통약자의 도시철도 역사의 보행시설 이용에 관한 비교분석)

  • HwangBo, Hyun;Jung, Hun-Young;Kim, Hyun-Woong
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.757-762
    • /
    • 2011
  • As our society is becoming an aging society, there is an increasing number of the elderly. Recently, mobility handicapped like the elderly and the disable take part in many social activities. It is required public transportation systems for them. Already, the traffic policy for mobility handicapped including pregnant woman and child, has been established in many cities. Particularly, the convenience of mobility for the handicapped in the urban rail stations is depend on a pedestrian facilities like escalators and elevators. The pedestrian facilities have been built in urban rail stations without rules for mobility handicapped. To make the more convenient and more safe stations, the more study about mobility handicapped and non-mobility handicapped is needed. This paper preferentially discusses the pedestrian facilities with other convenience facilities in urban rail stations. This paper explains also their preference, relative satisfaction and importance for the convenience facilities including the a pedestrian facilities in urban rail stations and makes clear the difference between both groups.

  • PDF

High Speed Rail Measurement System of HSR-350x (한국형고속열차 고속 궤도검측시스템)

  • Kim, Sang-Soo;Park, Choon-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.2
    • /
    • pp.115-119
    • /
    • 2008
  • Korean Train Express (KTX) has opened to commercial traffic since 2004 at maximum speed 300km/h. As the speed of the train becomes higher, the conditions of the rail affect the behavior of the running train. To secure the safety and reliability of high speed railway, it is necessary to inspect rail irregularities and to maintain the rail regularly. The authors designed the high speed rain measurement system over 300km/h. And we installed the system to Korea High-speed Railway (HSR 350x). In this paper, we introduce the high speed rail measurement system for HSR 350x and show verification of the performance of the system through test runs.

A Study on Standardization and Functional Analysis for Urban Rail Transit Public Addressing System (도시철도 방송시스템의 표준화를 위한 기능분석 및 표준사양 도출 연구)

  • Shin, Kyung-Ho;Jo, Hyun-Jeong;Kim, Baek-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1207_1208
    • /
    • 2009
  • It is expected that standardized framework for urban rail transit system will contribute to more convenient and safe traffic service and ensure higher reliability and availability of urban rail transit rolling stock and infrastructure. Information and telecommunication system in urban rail transit consists of various subsystems, such as radio communication system, digital transmission system, integrated monitoring system and public addressing system and its standardization will be implemented based on these subsystem. Public addressing system is to provide information related to operation and emergency for passengers and operators. In this paper we suggest draft criterion of public addressing system for urban rail transit through functional analysis and comparison on the present state of the system.

  • PDF

Estimation of the Rail pad Stiffness Characteristic and the Sustainable period in Service (운행선에서 레일패드의 탄성변화율과 내구년수 예측)

  • Park, Dae-Geun;Kim, Jung-Hun;Choi, Hyun-Su;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.432-441
    • /
    • 2007
  • Any track system needs major changes of its components during its life. The most economical solution is, if possible, to make all components reach their life limit during the major track rehabilitation operation. Usually, the rail does a role as the driving component for the objective: its life-time is equivalent to around 500 million tons of traffic on high speed lines. On the KTX line with 110 trains per day, this would correspond to around 16 years, which is probably too long for the elastic pads of a concrete slab track. The most economical solution should be to change them at an intermediate step of 8 years, without changing the rail, and then to change both the rail and elastic pad at 16 years intervals (some rail changes on the South East TGV line in France began 15 years after service opening at 260 km/h, but recent rails have better characteristics).

  • PDF