• 제목/요약/키워드: public road construction projects

검색결과 34건 처리시간 0.02초

공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구 (A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects)

  • 옥현;김성진;김태학;주기범
    • 한국도로학회논문집
    • /
    • 제20권2호
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구 (A Study on Development of Remote Site Monitoring System in Public Road Construction Projects)

  • 옥현
    • 한국도로학회논문집
    • /
    • 제14권6호
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

Government's Roles in Public Private Partnership Toll Road Projects

  • Rohman, Mohammad Arif;Doloi, Hemanta;Heywood, Christopher
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.381-385
    • /
    • 2015
  • This research aims to investigate critical factors of the government's role in achieving success in Public Private Partnership (PPP) toll road projects in Indonesia according to government and private sectors' perceptions. A preliminary interview Subsequently a questionnaire survey was also conducted involving 143 respondents across the two sectors from eight operating toll were five critical factors of the government's roles in achieving success in PPP toll road projects, namely; "Active involvement in overall project stage activities", "Establishment of good bureaucracy", "Provision of conducive environment", "Appropriate project planning and competitive tendering" and "Provision of appropriate government support and supervision". This research finding is expected to assist the government in defining clear roles and underlying responsibilities in development of PPP toll roads in Indonesia.

  • PDF

FACTORS AFFECTING THE SUCCESS/FAILURE OF ROAD INFRASTRUCTURE PROJECTS UNDER PPP IN INDIA

  • Nallathiga, Ramakrishna;Shaikh, Haris D;Shaikh, Tauseef F;Sheik, Farhan A
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권4호
    • /
    • pp.1-12
    • /
    • 2017
  • India has accorded a high priority to road infrastructure development through Public-Private Partnership (PPP) and it has set a high target for investment inflows. Yet, it is widely held that road/highway infrastructure has not been developing at required pace and that the road infrastructure projects under PPP have been suffering from several hurdles and delays, thereby affecting project success/failure. This paper is an attempt to analyze the critical success/failure factors of road infrastructure projects under PPP in India. A questionnaire survey was conducted among a sample of the stakeholders of road infrastructure projects to identify the critical success/failure factors during all four major project stages using different approaches. Initially, the critical factors were identified through ranking based on the average/mean score. Later, the conventional RII score was used to identify the critical success/failure factors. Finally, the critical success/failure factors were also identified based on the stakeholder-wise ranking of the factors and their convergence. The assessment revealed that there was a greater convergence across the different methods and also that there was greater consensus among project stakeholder on the critical success/failure factors of road PPP projects.

주요개발사업의 환경영향평가서 분석을 통한 사회경제항목평가의 문제점과 개선방안 (Analysis of Problems and Improvement of Environmental Impact Assessment in Social-Economic Items Based on 19 Major Large Scale Development Projects)

  • 이상돈
    • 환경영향평가
    • /
    • 제13권4호
    • /
    • pp.165-185
    • /
    • 2004
  • Assessment in Socio-economic items should be used to estimate social influence when policies and projects were introduced. To estimate current situation of socio-economic items 19 Environmental Impact Statement (EIS) of large scale projects were analyzed. The projects were selected based on magnitude of social impact when the projects were implemented. Environmental Impact Statement was categorized into line projects(road construction, railroad construction, stream development, etc), and surface projects(energy development, wetland reclamation, recreation and sport development, and housing and residential development, etc) thus being chosen for 19 projects in each categories. This report was based on the analysis of 7 items in socio-economic environmental items(i.e., population, residents, industry, public facilities, education, transport and historical monument). Most EIS did not follow the regulation suggested by Ministry of Environment, and only current circumstances were briefly described. Indifference of in-depth analysis of socioeconomic environmental items would influence the process of social and environment impact negatively in the midst of construction of National Projects such as Outer Circle Seoul Highways, Saemankeum Reclamation Projects, etc. This abrupt halt of construction was mostly based on a lack of public hearing or public participation. Socio-economic items are also very much lacking in quantitative method and strengthening socio-economic environmental items is needed via checklist or matrix that brings decision-makers better ideas objectively.

ESTIMATING COSTS DURING THE INITIAL STAGE OF CONCEPTUAL PLANNING FOR PUBLIC ROAD PROJECTS: CASE-BASED REASONING APPROACH

  • Seokjin Choi;Donghoon Yeo;Seung H. Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1183-1188
    • /
    • 2009
  • Estimating project costs during the early stage of conceptual planning is very important when deciding whether to approve the project and allocate an appropriate budget. However, due to greater uncertainties involved in a project, it is challenging to estimate costs during this initial stage within a reasonable tolerance. This paper attempts to develop a cost-estimate model for public road projects under these circumstances and limitations. In the conceptual planning stage of a road project, there is only limited information for cost estimation, for example, such input data as total length of the route, origin and destination, number of lanes, general geographic characteristics of the route, and other basic attributes. This implies that the model should individuate suitable but restricted information without considering detailed features such as quantity of earthwork and a detailed route of a given condition. With these limited facts, this paper applies a case-based reasoning (CBR) method to solve a new problem by deriving similar past problems, which in turn is used to estimate the cost of a given project based on best-fitted previous cases. To develop a CBR cost-estimate model, the authors classified 8 representative variables, including project type, the number of lanes, total length, road design grades, etc. Then, we developed the CBR model, primarily by using 180 actual cases of public road projects, procured over the last decade. With the CBR model, it was found that the degree of error in estimation can be reasonably reduced, to below approximately 30% compared to the final costs estimated upon the completion of detailed design.

  • PDF

EVALUATION OF MINIMUM REVENUE GUARANTEE(MRG) IN BOT PROJECT FINANCE WITH OPTION PRICING THEORY

  • Jae Bum Jun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.800-807
    • /
    • 2009
  • The limited public funds available for infrastructure projects have led governments to consider private entities' participation in long-term contracts for finance, construction, and operation of these projects to share risks and rewards between the public and the private. Because these projects have complicated risk evolutions, diverse contractual forms for each project member to hedge risks involved in a project are necessary. In light of this, Build-Operate-Transfer(BOT) model is considered as effective to accomplish Public Private Partnerships(PPPs) with a characteristic of an ownership-reversion. In BOT projects, the government has used such an incentive system as minimum revenue guarantee(MRG) agreement to attract the private's participation. Although this agreement turns out critical in success of BOT project, there still exist problematic issues in a financial feasibility analysis since the traditional capital budgeting theory, Net Present Value(NPV) analysis, has failed to evaluate the contingent characteristic of MRG agreement. The purpose of this research is to develop real option model based on option pricing theory so as to provide a theoretical framework in valuing MRG agreement in BOT projects. To understand the applicability of the model, the model is applied to the example of the BOT toll road project and the results are compared with that by NPV analysis. Finally, we found that the impact of the MRG agreement is significant on the project value. Hence, the real option model can help the government establish better BOT policies and the developer make appropriate bidding strategies.

  • PDF

공적개발원조사업(Official Development Assistance)의 방향과 환경평가 (Official Development Assistance and Environmental Assessment)

  • 이종호
    • 환경영향평가
    • /
    • 제23권1호
    • /
    • pp.51-65
    • /
    • 2014
  • ODA projects such as multi-purpose dam, industrial complex, road construction etc. have resulted in environmental damage and resident relocation including destruction of site of living. Even the grandiose developments as ODA projects have made clear the value clashes between development and environmental conservation, and have brought about conflicts between public interests and public environmental right, and the discordance between public interests and private property rights in the recipient country. This study summarizes and analyses the Korea's ODA projects and will suggest the public participation and governance system based on Saemaul Movement, Strategic Environmental Assessment and Environmental Impact Assessment based on the guideline of OECD DAC, and emphasize Strategic Environmental Assessment and Social Impact Assessment in the procedure of ODA projects. In the future the ODA project should be implemented for the overcome of poverty and response to climate change based on the experience and trial and errors of Korea's compact growth and past ODA projects.

민간투자사업 성과평가 모델 개발 및 적용 - 도로 부문 사업을 중심으로 - (Performance Evaluation Model for Public-Private Partnership Projects - with Reference to BTO (Build-Transfer-Operate) Road Projects -)

  • 박현;박인석;이신
    • 한국건설관리학회논문집
    • /
    • 제19권2호
    • /
    • pp.83-95
    • /
    • 2018
  • 본 논문은 민간투자사업의 특수성을 반영한 성과평가 모델 개발을 목적으로 한다. 성과평가 모델 개발을 위해 첫째, 문헌연구를 통하여 민간투자사업 주요 관점과 관점별 성공항목을 정의하고, AHP 설문조사를 통하여 가중치를 산정하였다. 둘째, 민간투자사업 성과에 영향을 미치는 핵심 성과요인을 도출하고, 이를 평가할 수 있는 평가항목을 제안하였다. 셋째, 관점별 성공항목과 평가항목을 매칭함으로써 민간투자사업 성과평가 모델을 구축하였다. 성과평가 모델 개발과 적용을 통해 민간투자사업 이해관계자 사이의 첨예한 관점의 차이가 존재함을 파악할 수 있었다. 이는 다양한 이해관계자의 관점을 균형있게 반영한 민간투자사업의 종합적인 평가의 필요성을 보여준다. 본 연구에서 제시한 성과평가 모델의 평가 결과와 기존의 건설공사 사후평가 결과를 비교해보면, 본 연구의 평가 점수가 이용자 만족도 조사 결과와 유사하다. 건설공사 사후평가에 비해 본 연구의 평가모델은 다양한 이해관계자의 만족도 및 관점을 반영하였기 때문으로 판단된다. 본 연구에서 개발한 성과지표의 결과를 통해 다양한 관점을 고려한 민간투자사업의 성과를 측정할 수 있으며, 어떠한 성공요인 및 평가항목이 프로젝트 성공에 영향을 미치는지 파악할 수 있다. 또한, 본 모델의 프로세스를 기반으로 주요관점 및 성공항목의 가중치 변화와 평가항목의 가감을 통해 도로 시설물을 제외한 민간투자사업 프로젝트에도 적용이 가능할 것으로 기대된다.

다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구 (Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects)

  • 구본상
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.134-145
    • /
    • 2013
  • 국내에서 시행되는 대형 도로건설사업은 공구별로 분리 발주되고 개별 시공사는 단절된 형태로 시공을 하게 된다. 공구별 공종 및 활용 장비는 유사하나, 공구 간 장비의 공유는 비공식적이고 부분적으로만 일어난다. 이로 인해 도로 현장에서 사용되는 고가의 장비들은 낮은 가동률을 보이며 임대비용이 공사비의 높은 비중을 차지한다. 본 연구에서는 린 건설과 프로그램 매니지먼트의 이론에 근거하여 개별 공구에서 발생하는 유휴 및 부족 장비를 전체 사업 차원에서 공유함으로서 장비 생산성을 향상 시킬 수 있는 방안을 모색하였다. 개발된 장비공유시스템은 정의된 기준(최단거리, 연속성, 빈도 및 일대일) 및 일련의 절차에 따라 공구들의 장비 수급현황을 바탕으로 비용을 최소화하면서 가동률을 높여주는 조건하에 두 공구 간 장비의 매칭(matching)을 자동화해준다. 본 시스템을 실제 도로공사 현장 4개 공구에 3개월 간, 3개 장비를 대상으로 시뮬레이션을 실시한 결과, 다공구에서의 생산성을 측정하는 지표인 nDPR이 향상되었으며, 장비 비용 또한 4.45% 개선되었다. 더불어, 공유횟수가 많은 장비일수록 nDPR 및 비용이 비례적으로 개선되는 것을 관찰할 수 있어 장비의 공유를 통한 긍정적 효과를 입증하였다. 본 연구의 결과는 개별 사업이 아닌 전체사업 차원의 관리를 통해 증대되는 사업 가치를 정량적으로 제시함으로서 프로그램 차원의 사업관리모델을 조기 도입하는데 일조할 수 있을 것으로 사료된다.