THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS

  • Kyu-Man Cho;Kyo-Jin Koo;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1094-1099
    • /
    • 2005
  • Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.

  • PDF

Patterns of Cancer-Related Risk Behaviors Among Construction Workers in Hong Kong: A Latent Class Analysis Approach

  • Xia, Nan;Lam, Wendy;Tin, Pamela;Yoon, Sungwon;Zhang, Na;Zhang, Weiwei;Ma, Ke;Fielding, Richard
    • Safety and Health at Work
    • /
    • v.11 no.1
    • /
    • pp.26-32
    • /
    • 2020
  • Background: Hong Kong's construction industry currently faces a manpower crisis. Blue-collar workers are a disadvantaged group and suffer higher levels of chronic diseases, for example, cancer, than the wider population. Cancer risk factors are likely to cluster together. We documented prevalence of cancer-associated lifestyle risk behaviors and their correlates among Hong Kong construction workers. Methods: Data were collected from workers at 37 railway-related construction worksites throughout Hong Kong during May 2014. Tobacco use, alcohol consumption, unbalanced nutrition intake, and physical inactivity were included in the analysis. Latent class analysis and multivariable logistic regression were performed to identify the patterns of risk behaviors related to cancer, as well as their impact factors among construction workers in Hong Kong. Results: Overall, 1,443 workers participated. Latent class analysis identified four different behavioral classes in the sample. Fully adjusted multiple logistic regression identified age, gender, years of Hong Kong residency, ethnicity, educational level, and living status differentiated behavioral classes. Conclusion: High levels of lifestyle-related cancer-risk behaviors were found in most of the Hong Kong construction workers studied. The present study contributes to understanding how cancer-related lifestyle risk behaviors cluster among construction workers and relative impact factors of risk behaviors. It is essential to tailor health behavior interventions focused on multiple risk behaviors among different groups for further enlarging the effects on cancer prevention.

A Study on the Maintenance Expenses of the Public Rental Rousing (공공임대주택 수선비 지출 실태에 관한 연구)

  • Kang, Hyun-Kyu;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.171-180
    • /
    • 2005
  • Public rental housing is constructed, owned, and managed by the public sector. The public institution for the public rental housing controls the whole building life cycle from the construction to the demolition. The construction company for the house built for sale is strongly interested in the cost for the initial investment, while the public institution is more focused on the maintenance cost for the preservation of the buildings Nevertheless, the maintenance cost of the public rental housing has been only managed as the accounting factor without the systemic research and analysis on the actual condition. This paper shows how expenses are related to the degree of obsolescence and presents the differences of the maintenance costs by the housing area and expenditure trends (vs time) of the maintenance costs, through analyzing time series data of public rental housing maintenance cost. Further, this paper helps understanding the causes of the differences of the maintenance costs by housing areas and characteristics of the expenditure trends. After all, this paper contributes to the improvement of the reliability and the practicality for the Life Cycle Cost modeling and the maintenance cost estimating.

Effect of Public Library-Mediated Information Sharing on the Construction of Social Capital (공공도서관 이용을 통한 정보공유가 사회자본 형성에 미치는 영향)

  • Lee, Seungmin
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.52 no.4
    • /
    • pp.27-49
    • /
    • 2018
  • This research empirically analyzed the effect of information sharing through the use of public libraries on the construction and consolidation of social capital of individuals. Through the survey targeting public library users, it was identified that the frequency of public library use and the participation of public library programs have positive effect on the recognition of information sharing and the reliability of information shared. In addition, information sharing among people became more active when public libraries mediate their information activities. This public library-mediated information sharing positively affects the construction of structural and relational social capital. In contrast, it does not have significant meaning on the construction of cognitive social capital, which means that information sharing and the use of public library relatively concentrate on satisfying personal information needs.

The Roles of Public Libraries as a Construction Mechanism of Social and Cultural Capital (사회자본과 문화자본 형성 기제로서의 공공도서관의 역할)

  • Lee, Seungmin
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.29 no.4
    • /
    • pp.139-160
    • /
    • 2018
  • The purpose of this research is to empirically analyze the effect of public library use on the construction of social and cultural capital and the close of social classes reproduction through the survey targeting public library users. As a result, the use of public libraries positively affects the construction of both social and cultural capital. In contrast, it partially addresses the problems in social classes reproduction because the social classes with higher levels of education and income tend to use public libraries more often. In order to take a role of and contribute to equal construction of social and cultural capital, public libraries need to be public places for open and social interaction. In addition, it is necessary for public libraries to improve their roles to allow community members to access and utilize various cultural resources.

Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings (공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법)

  • Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.415-422
    • /
    • 2014
  • There is growing difference between a planned value and an actual cost for increasing as an risk of construction cost. A construction cost index is an alternative to redeem a problem, but it is still very difficult to reduce an actual differential as a price fluctuation. Furthermore an existing theory of a construction cost index is overly complex, and is unsuitable for using in working-level. This study suggests an optimum correction rate in respect of a total construction cost. It is analyzing the actual cost of 53 public buildings that the Public Procurement Service ordered. The objects are main processes that include architectural works, mechanical works, electrical works, telecommunication works, and service facilities. It is compared a total construction cost based on absolute error rate using the median from frequentist principle. For this, it is selected the suitable regression model and set a correction rate.

Suggestions on Efficient Cost Management for Public Construction Projects - Focused on Total Project Cost Management System- (공공건설사업 사업비 관리의 문제점 및 개선방안 - 총사업비관리제도를 중심으로-)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.12-21
    • /
    • 2013
  • Total Project Cost Management System(TPCMS) was introduced with the purpose of increasing the efficiency of cost control for public construction project in 1994. In this paper, general perception of participants of the public construction project on the TPCMS was examined, and the problems in implementing the TPCMS was figured out through expert interviews and survey. Then better ways to implement the system were drawn based on the problems. To effectively manage the cost of public construction project, basically project cost should be estimated accurately in planning stage and managed based on it to have a project complete within the budget. In addition, the cost need to be managed in more systematic ways in terms of data collection and analysis, and the autonomy in managing the project cost given to the project owner needs to be expanded. Most of all, proper budget should be provided to prevent a project from delay through setting the priority of projects and proper budget allocation based on the priority.

An Empirical Analysis on the Presumption of Public Apartment's Construction Cost in Housing Land Development Project (택지개발사업의 공공주택건설공사비 추정의 실증적 분석)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.81-88
    • /
    • 2011
  • Providers haven't recently had a flexible construction cost estimation system to meet various needs of consumers about public housing. So the subject of this study is to estimate construction cost reasonably in early project stage of public housing and then develop reliable means which is able to support construction cost management and establish a adequate funding investment plan as a provider. In this study, Regression analysis was performed by the case on 20 public apartment complex which were designed from the first half of 2007 to the first half of 2008. A total construction cost of construction, civil engineering, machinery, elevator, land scape, electricity and communication work was used as one sample for increasing explanation and representativeness of the case. In addition, The total construction cost which is devided into design, contract and completion cost was variously analysed for increasing relevance of model and actual utilization. The result of estimation model based on a total construction cost set up completion and design cost showed that error rate is within 2%, which is a excellent result. The estimation model of the construction cost developed by this study is expected to estimate approximate construction cost which is adjacent real construction cost in early stage of the project by using some data.

The Regional Construction & Management Office Construction Management System Based On The Web (웹을 기반으로 한 지방청 공사현황 정보시스템 구축)

  • 서명배;강의석;김남곤
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.84-89
    • /
    • 2003
  • For running various construction processing information and technological information, it is supplied by Construction CALS/EC systems properly during whole facilities life cycle. So it is urgently necessary to change Regional Construction 8t Management Office (RCMO) equipment construction administration business to electron processing system (CALS/EC). From construction work plan to completion, a present storage documents system is unsystematic. Therefore, it needs management system to store documents and to read in turn documents properly. This research suggest that it is to connect with various information systems and Construction CALS/EC for RCMO which is running public construction field. So it can be driven systematic and effective administration system about public construction business by Web-based present construction situation information system.

  • PDF

Analysis of Causes of Increase in Construction Cost and Minimize Increase of Cost through Performance Evaluation of Public Construction Projects (공공건설사업의 성과평가를 통한 공사비 증가 원인 분석 및 증가 최소화 방안)

  • Moon, Hyunseok;Ryoo, Geunho;Hong, Hyunki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.4
    • /
    • pp.567-575
    • /
    • 2024
  • The government and local governments are utilizing regulations, policies, and various project management techniques at each project stage to effectively and systematically manage public construction projects. However, the increase in construction costs continues to occur. In order to solve these problems, this study attempted to collect cases of existing public construction projects and analyze historical data. And it would like to derive the impact factor of increased construction costs. Based on the results, a plan was proposed to prevent the causes of increase and minimize in construction costs. The main reasons for the increase in costs were the occurrence of civil petition, differences between design documents and site conditions, and changes due to requests from the owner and changes in the business plan. And to solve these problems, this study proposed improvement for each cause from an institutional perspective, along with interview with experts and project owners. The results of this study are significant in improving the process of existing public construction process and presenting key inspection and review items for each major inspection stage in order to solve problem resulting from the analysis of the performance of public construction projects.