• 제목/요약/키워드: public construction

검색결과 2,531건 처리시간 0.028초

공공청사의 효율적 조성을 위한 건축디자인 기준 설정 연구 (Design Criteria for Effective Public Building Construction Process)

  • 김창신;동재욱;이화룡
    • 한국디지털건축인테리어학회논문집
    • /
    • 제13권1호
    • /
    • pp.43-53
    • /
    • 2013
  • The purpose of this study is to propose the reasonable method for effective public building construction process. Public building service administration is necessary to make efficient public building supply and demand program. As a result, current public building precess need four steps(organize public assets, various process, establish public building service administration, design criteria). 1. Planning phase : Participation of Private Experts is guaranteed to enhance public building's function such as welfare, entertainment. 2. Design Phase : Detailed design review makes efficient and user oriented public building. 3. Construction Phase : Public Architect solve various problems among the participator especially in case of government local building construction. In conclusion, well formulated design criteria and Public building service administration make public building efficient in various field.

건설산업 공공데이터 개방의 현황과 과제 (The Current Status and Problems of Open Government Data on the Construction Sector and Its Improvement Plan)

  • 김성환;최석인;유위성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.219-220
    • /
    • 2022
  • In order to meet the trend, construction public data are already disclosing not only data generated at the construction site but also various data ranging from inspection reports and public construction contracts through multiple portals. However, unlike the excellence of the open performance evaluated by the number of data, it is difficult to evaluate the specific level of disclosure because there is no case of analyzing the quality, ease of use, and possibility of further opening of the public construction data set. On the other hand, performance measurement is already performed using an internationally agreed evaluation method in different fields such as real estate, population, and environment. So it is essential to analyze the current status of public data openings in the construction field and to derive improvement tasks. Therefore, this study conducted a survey of researchers with the highest system utilization targeting representative public data open systems in the construction field, such as E-AIS(세움터) and KISCON. To ensure fairness and increase comparability, the questionnaire was composed using evaluation items on implementing public data conducted annually by the World Wide Web Foundation, an international non-profit organization. With these responses, we investigated the status of public data disclosure and opinions on data quality and derived tasks to improve public data disclosure in construction through the analysis of the results.

  • PDF

신축 공공도서관의 지위적 역할에 따른 규모와 지역 특성에 따른 건립공사비 기준에 관한 연구 (A Study on the Guideline of construction cost according to Size of position and Regional characteristics of New Public Libraries)

  • 이철재;윤지원;이민
    • 한국실내디자인학회논문집
    • /
    • 제26권3호
    • /
    • pp.113-120
    • /
    • 2017
  • As the functions and roles of public libraries expand, it is time for qualitative growth. In order to improve the quality of public libraries, it is important to plan actual construction costs through systematic feasibility study. Therefore, the purpose of this study is to present the guideline of construction costs considering the size and regional characteristics according to the status role of the new public libraries. The construction costs are based on actual data. The results of the study are as follows. First, we derived the analysis framework according to the size and regional characteristics. The status role of the public libraries was considered theoretically. The size was classified according to status role of the public libraries. Regional characteristics were classified through literature review. Through this, an analysis framework was derived according to size and region. Second, the actual data on construction costs of the new public libraries were examined and analyzed. Basic factors, size, area, and construction costs were analyzed for 285 libraries nationwide that opened from 2010 to 2016. The data of 129 newly opened public libraries were classified. To present construction costs depending on price fluctuation, construction cost index was analyzed as of September 2016. Third, a guideline of construction costs for new public libraries was suggested. The construction cost per $1m^2$ of building area was analyzed. By multiplying 116.70(p), the construction cost index, the construction cost per $1m^2$ of total building area was calculated to be 2,472,350 won. When applying the research result, construction costs can be gained by adding construction cost index of the month.

Suggestions for Detection System of Bid-rigging in Public Construction Projects

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak;Cho, Gun-Hee
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.712-713
    • /
    • 2015
  • In recent years, the bid-rigging in public construction markets has been treated as a critical issue in Fair Trade Commission. The investigation revealed that the collusion was implemented extensively in every area from the material supply to the construction service of general contractors. This study reviewed the causes of the bid-rigging in public construction projects, and proposed the improvement plan to eradicate bad practices. Firstly, the causes and purposes of bid-rigging were categorized into two types of internal factors from construction companies and external environment factors influencing business activities. Secondly, the system development method was explained to detect the signs of bid-rigging based on the technical proposal documents in open tender. The detection systems of repetitive public owner also provide the function of sharing data on the companies and cases to violate the fair trade regulation. In addition, the problems and improvement direction of public procurement policies were discussed.

  • PDF

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

건설공사 민원 최소화를 위한 민원분류체계 기반 설계성능향상 (Improvement of Design Performance for the Minimization of Public Grievances Based on a Construction Public Grievance Breakdown Structure)

  • 문성우;조화니
    • 한국건설관리학회논문집
    • /
    • 제19권1호
    • /
    • pp.12-20
    • /
    • 2018
  • 건설사업은 사회적 그리고 경제적으로 파급효과가 크기 때문에 프로젝트 추진과정 중 다수의 민원이 발생된다. 이와 같은 현실에서 건설사업을 성공적으로 완료하기 위해서는 계획 및 설계과정에서 민원요인을 분석하고, 민원을 최소화하기 위해서 노력해야 한다. 본 논문은 건설사업의 민원을 평가하기 위한 민원분류체계를 제시하고, 민원분류체계를 바탕으로 설계기능을 개선하여 민원을 최소화하는 것을 목적으로 한다. 논문목적 달성을 위해 연구과정에서는 1) 건설사업 유형별 특성에 따른 민원요인을 분석하고; 2) 민원요인을 기반으로 민원분류체계를 개발했으며; 3) 민원분류체계를 체크리스트로 사용하여 설계대안 창출을 위한 절차를 제시했다. 사례분석에서는 실제 건설사업 설계를 대상으로 민원사전예방을 위한 설계대안을 창출하여 민원대응수준을 향상시켰다.

A CBR-BASED COST PREDICTION MODEL FOR THE DESIGN PHASE OF PUBLIC MULTI-FAMILY HOUSING CONSTRUCTION PROJECTS

  • TaeHoon Hong;ChangTaek Hyun;HyunSeok Moon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.203-211
    • /
    • 2009
  • Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.

  • PDF

A Descriptive Analysis of Project Participants' Perception about Complaint in Public Construction Projects

  • Lee, Changjun;Lee, Ju-Hui;Yun, Sungmin;Han, Seung Heon
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.111-118
    • /
    • 2022
  • Conflicts in public construction projects become more serious and complex so that they have a negative effect on performance of projecets. Conflicts in public construction projects are defined as expanding in complaints. This study analyzes the relationship structure and effect on performance between complaints and conflicts. First of all, 219 survey data collected from industry experts were used to derive complaints arising from the project and to understand the characteristics of each complaint. In the case of environmental damages, rather than environmental damage during construction, harmful substances or effects that can occur in completed facilities cause complaints from local residents, and opposition from environmental groups has a great effect on time and cost increase. As for safety damage, civil complaints related to prevention and countermeasures for safety accidents occur frequently, and additional construction affects cost increases. Through this study, it is possible to understand the serious complaints that are prone to conflict in public construction projects, their frequency, and the performance of the project.

  • PDF

신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 - (Improvement method of process management on new han-ok style public building project)

  • 서정승;김영훈;곽동엽
    • KIEAE Journal
    • /
    • 제17권3호
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

온라인 뉴스 기반 공공건설사업 갈등지수 산정에 관한 기초연구 (A Study for Conflict in Public Construction Projects Based on Online News)

  • 백승원;한승헌;윤성민;임종록;남지현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.277-278
    • /
    • 2021
  • Conflict in public construction projects has increased for the last decades. It not only entails enormous social and economic costs but also makes stakeholders suffer from unnecessary expense and time waste. This study defines the the conflict index for public construction projects based on news data, and calculates conflict index for representative past and current public construction projects that has been deepened conflicts at the national level. The result indicates that the major conflict issue of the 2nd Jeju Airport Project are the environment and location whereas that of the Gaduk New Airport Project are the safety, location and necessity. This approach is expected to enable construction project managers to manage conflicts quantitatively based on comparing with past cases.

  • PDF