• Title/Summary/Keyword: public IT project contract law

Search Result 12, Processing Time 0.024 seconds

A Study on the Regulation Improvement of the Public IT Project Contract Law (공공IT 프로젝트 계약법의 제도개선에 관한 연구)

  • O, Jong-U;No, Gyu-Seong;Son, Dong-Gwon;Kim, Sin-Pyo;Lee, Geun-Bae;Park, Yeong-Min
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.231-242
    • /
    • 2005
  • The purpose of this study is to generate a proper regulation improvement direction of the public IT project contract law through the current four contract methods and three methods of the awarding party of a contract method. The research method for this paper is derived from the written materials of the present public IT project contract law. Two problems have been processed in order to produce the results: the current contract methods and the awarding party of a contract method. The current contract methods consist of a competition contract, a private contract, and a supply methodology contract. The methods of the awarding party of a contract display a qualified evaluation regulation, the 2nd step competition bid, a standard cost separation tender, and a contract by a negotiation. The results exhibit that the general competition contract consists of four improvement items. The contract by a negotiation contains five improvement items. The group private contract has one improvement item. And the private contract includes one improvement item. These results implicate that the current public IT project contract law demands better improvement work for the ubiquitous Korea.

  • PDF

A Study on the Legislation Scheme of the Public IT Project Ordering and Receiving Systems (공공IT 프로젝트 수발주 제도의 법제화 방안 연구)

  • O, Jong-U;No, Gyu-Seong;Son, Dong-Gwon;Kim, Sin-Pyo;Lee, Geun-Bae;Park, Yeong-Min
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.319-353
    • /
    • 2006
  • The purpose of this study is to generate a proper regulation improvement direction of the public IT project contract law through the current four contract methods and three methods of the awarding party of a contract method. The research method for this paper is derived from the written materials of the present public IT project contract law. Two problems have been processed in order to produce the results: the current contract methods and the awarding party of a contract method. The current contract methods consist of a competition contract, a private contract, and a supply methodology contract. The methods of the awarding party of a contract display a qualified evaluation regulation, the 2nd step competition bid, a standard cost separation tender, and a contract by a negotiation. The results exhibit that the general competition contract consists of four improvement items. The contract by a negotiation contains five improvement items. The group private contract has one improvement item. And the private contract includes one improvement item. These results implicate that the current public IT project contract law demands better improvement work for the ubiquitous Korea.

  • PDF

A Study on the Innovative Scheme of the Public IT Project Ordering and Receiving Systems (공공 IT 프로젝트 수발주 제도의 개선방안 연구)

  • Oh, Jong-Woo;No, Gyu-Seong;Kim, Sin-Pyo
    • Journal of Digital Convergence
    • /
    • v.4 no.2
    • /
    • pp.97-108
    • /
    • 2006
  • The purpose of this study is to generate a proper regulation improvement direction of the public If project contract law through the current four contract methods and three methods of the awarding party of a contract method. The research method for this paper is derived from the written materials of the present public IT project contract law. Two problems have been processed in order to produce the results: the current contract methods and the awarding party of a contract method. The current contract methods consist of a competition contract, a private contract, and a supply methodology contract, The methods of the awarding party of a contract display a qualified evaluation regulation, the 2nd step competition bid, a standard cost separation tender, and a contract by a negotiation. The results exhibit that the general competition contract consists of four improvement items. The contract by a negotiation contains five improvement items. The group private contract has one improvement item. And the private contract includes one improvement item. These results implicate that the current public IT project contract law demands better improvement work for the ubiquitous Korea.

  • PDF

A International Comparative Study on the Bidding System & Policy for the Public IT Project (공공 IT 프로젝트 수발주 제도와 정책의 국제간 비고)

  • Noh, Kyoo-Sung
    • Journal of Digital Convergence
    • /
    • v.6 no.1
    • /
    • pp.11-19
    • /
    • 2008
  • The Bidding System of the public IT project in Korea is fallen behind, because of the ordering habitual practice based old system, overcompetition based sealed bid and subcontract practice. To innovate this old-fashioned practice for public IT project bidding, this paper wants to generate a proper improvement direction of the public IT project contract law and the related policy through the literature review about the ordering and receiving system in Korea, the practical survey about bidding marketplace in Korea, and competition between bidding system and/or policy of major countries: USA, UK, France and Japan. As a result of practical survey, many problems of the current public IT project bidding system came out and improvement ideas toward future situation turned up. These outputs implicate that the current law and system related public IT project demands better improvement work for the future ubiquitous Korea. Therefore, this paper, to solve these problems about bidding systems and practice, propose the new public IT project contract law and the related policy, reflecting these improvement ideas by the practical survey and the literature review, and benchmarking points from bidding system of other countries.

  • PDF

A Study on Reform Scheme of Software Industrial Promotion Law (소프트웨어산업진흥법의 개선방향에 관한 연구)

  • Choi, Chang-Ryeol
    • Journal of Information Technology Services
    • /
    • v.5 no.1
    • /
    • pp.61-81
    • /
    • 2006
  • It is necessary to systematically explore the reform plans of the Software Industrial Promotion Law to systematically a representative high-added value future knowledge-based industry, software industry. The current Software Industrial Promotion Law provides only one provision on software business contract procedures, and the Civil Code, the National Contract law or Subcontract Fairness Law regulate other things, so the features of software industry are not properly reflected. To the contrary, the Information Communication Construction Law or the Construction Basic Law effectively prevent disputes by providing material and detailed provisions. Therefore the current software industry needs to be shifted from promotion to fundamental one. That is, as the software industry takes up a large portion at present, so the law should have basic procedural provisions. Also the National Contract Law governs only the contract procedures of public sector, so there should be business performance procedural provisions to regulate the software business formalities of civil sector. And the National Contract Law controls the sale, construction and service of articles at separate contract procedures, but software business contains construction and service characters simultaneously, so there should be business performance procedures fit for software business. Thus this study presented the legislative need and bill on the performance procedures of software business.

A Study on the Reformation of the Contract Time Extension Process in the Public Construction projects (공공건설사업에서 계약기간 연장처리방법 개선에 관한 연구)

  • Cho Young-Jun;Lee Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.81-89
    • /
    • 2005
  • Delay schedule coming about duration extension is happening essentially because public construction project consist of many sub contractor. The method which can calculate delay day is suggested by many studies in case of happing delay schedule, but It is difficult to apply to real construction project because there is no mention about the control of The law of contract according to delay schedule. The law of Contract which is cost of account has more uncertain problem than FIDIC condition of contract. This study suggests method which can make extension of duration procedure clear in case of happing the reason of design change related with activity duration during carrying on construction, and a submission process of the reason of duration extension and modify schedule making way about section which is basis of calculating contract amount clear.

A Study on the Contractor's Liability for Defect in Public Construction Project - through comparing Civil Law with Government Contract Law - (공공건설사업 하자에 대한 수급인의 책임에 대한 연구- 민법과 국가계약법령의 비교를 통하여 -)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.69-79
    • /
    • 2001
  • Characteristics of Contactor's Defect Liability was too many discussed. But it's not clearly defined yet. Because recent Government Construction Projects are very complex and executed through long time, too many conflicts were appeared related to Contactor's Defect Liability. Therefore to analyse and to resolve the conflicts legal aspects of Contactor's Defect Liability stated in Civil Law and Government Contract Act was systematically compared. The result of this research is as follows : (1) Characteristic of Contactor's Defect must be regarded as a breach of Contract and be an incomplete contract implementation. (2) To decide the range of Damage, Characteristic of Defect must be regarded. (3) Contactor's Defect Liability must be effectual from the day of delivery. (4) Retainage must be added to secure the completion during the Contract Period and Defect Repairing Liability must be omitted in the Contract performance Security.

  • PDF

A Study on the Escalation Method for Contract Adjustment Public Construction Project (물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구)

  • Bae Kyoung-Tae;Choi Dong-Soo;Hwang Chi Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

A Study on the FIDIC Conditions of Contract for Design, Build and Operate Projects (FIDIC의 DBO 프로젝트용 표준계약조건에 관한 연구)

  • Choi, Myung-Kook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.46
    • /
    • pp.29-60
    • /
    • 2010
  • The incentive and reasons to publish FIDIC Conditions of Contract for Design, Build and Operate Projects(DBO Form) are manifold. It is partly a response to the increasing need for sophisticated project delivery methods in both the public and private sectors and the already widespread use of the FIDIC Yellow Book with operation and maintenance obligations and partly a response to the challenge to decrease maintenance cost to a minimum by means of a new procurement route. As a result, FIDIC has developed a new model form to meet this market place requirement. On the other hand, FIDIC did not simply adapt the Yellow Book but has developed a new form from it, whilst preserving the style of the already known FIDIC Forms and maintaining the wording where it was not necessary to change it for the purposes of a DBO Form. Moreover DBO Form fills up supposed gaps in other FIDIC Forms and ameliorates the claim management and dispute management framework. FIDIC DBO approach may be shortly summarized as follows. First, DBO Form provides for single project responsibility. Second, DBO Form has the clear objective of ensuring the use of a most reliable and efficient technology at the lowest life-cycle cost. Third, DBO Form is intended to operate as an effective quality increase in the design and construction of projects. Fourth, DBO Form is intended to provide significant benefits with regard to system integration and reduction of risks. Fifth, DBO Form accelerates and enhances completion schedule compliance. Sixth, DBO takes care of all three supporting pillars of sustainability(including economical, environmental and social elements). DBO Form is obviously a good starting point for negotiations and the preparation of calls for tenders, thus saving the parties time and money. However, existing cultural and legal differences, particular local conditions and the particular needs of some branches of the industry may require the form to be adapted according to the particular needs of a project. And Civil law practitioners are strongly recommended to verify carefully the underlying legal concepts and background of each clause of the General Conditions in order to avoid unnecessary and sometimes unnatural changes and amendments being made. Note that when preparing the Particular Conditions ensure that terminology is consistent and that existing inherent concepts should not be ignored.

  • PDF

A Study on the Regulation Improvement of the Public IT Project Contract Law (가상화 스토리지 시스템 도입 절차방법 연구)

  • Choe, Seong
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.243-249
    • /
    • 2005
  • 정보화가 발달할수록 데이터량은 증가한다. 21세기 정보화 시대가 말그대로 정보의 홍수속에 살게 될 것이다. 지금은 영상미디어 시대이다. 초고속인터넷시대는 향후 처리해야 할 정보가 단순 텍스트 데이터가 아니라 정보의 관리에 어려움을 가져왔다. 또한 인터넷이란 새로운 실시간 데이터 관리가 필요한 상황에서 고객의 어려움도 커져가고 있다. SAN(Storage Area Network)과 NAS(Network Attached Storage)는 가상화스토리지 전문기업 뿐만 아니라 이종 업체에서의 제안이다. 즉 NAS를 정의하는 방향도 다르다. 우선 서버 어플라이언스로 보는 업체로는 컴팩, IBM의 x시리즈, 마이크로테스트, 액시스 등이 있으며, IBM, 씬, EMC, 네트워크 어플리이언스, 히타치데이터시스템 등 전통적인 가상화스토리지 업체는 이를 가상화스토리지 네트워크의 한 아키텍처로 보고 있다. 이외에 맥스터, 퀸텀 등의 HDD업체들은 이를 네트워크에 연결할 수 있는 하드디스크로 보고 있다. 또한 네트워크 장비 업체인 3Com, 넷기어 등의 NAS제품을 보이는데 국내업체는 전무한 편이다. 예전에 우리가 포기한 고부가가 가치제품인 서버 스토리지 분야를 놓치면, 결코 국민소득 $2{\sim}3$만불 타령을 해야 아무런 소용도 없고 선진국에 기술 종속만 될 뿐이다. 그러므로 우리가 IT강국이라고 하는 데는 반성을 하여야 한다.

  • PDF