This paper seeks to measure the monetary value of technical development in the deep seabed manganese nodule mining by applying the compound option model (COM). The COM is appropriate for the project in terms of its decision-making structure and embedded uncertainty. The estimation results show that the deep seabed mining project has more economic potential than shown by the previously obtained results from the discounted cash flow (DCF) analysis. In addition, it is reasonable to invest in the project taking the various uncertainty factors into consideration, because the ratio of the value to the cost of the project is far higher than one. This information can be utilized in national ocean policy decision-making.
Otemachi(大手町) is the region where it plays a pivotal role in Japanese economy as representative head offices of companies including financial insurance, general trading, information and communication newspaper media are concentrated. However, regenerating the entire region from worn-out infrastructures of buildings and city into the fresh and vibrant foothold in international business was the problem to be solved. In this situation, was examined on the basis of administrative agencies and relevant enterprises to reconstruct office buildings in phases without ceasing business functions and activities by utilizing the large-scale vacant land occurred from the relocation of the national public institutions. The independent administrative institution 'Urban Renaissance Agency(UR)' has completed the examination of industrialization and participation request for the commencement of the project. In this article, The overview of , the new form of project promoted and cooperated by officials and people, is introduced by UR (Urban Renaissance Agency) reorganizing the land exchange and infrastructure through the land readjustment project, and at the same time, procuring capital and building office buildings in solidarity with private development enterprises and financial institutions.
Korean Journal of Construction Engineering and Management
/
v.7
no.5
/
pp.177-190
/
2006
Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.
Korean Journal of Construction Engineering and Management
/
v.19
no.2
/
pp.61-72
/
2018
Conflicts in public construction projects lead to increase social costs as well as construction costs and schedule delay. Therefore, it is important to evaluate the conflict in construction project and find appropriate solutions based on previous cases. In this research, the conflict factors and criteria for evaluating conflict are derived and 30 cases are evaluated by 11 conflict experts. Using k-means clustering, the cases are clustered by three clusters. The cases were analyzed according to the characteristics of each cluster and labeled as 'NIMBY and harmful facility conflict cluster', 'environmental and pollution conflict cluster', and 'PIMFY and small conflicts'. In the future, when conflict occurs in the public construction projects, the conflict can be evaluated using this clustering and the characteristics of the conflicts can be found. As a result, it will be helpful to mitigate the conflict quickly and effectively by looking for previous cases that are suitable for resolving the conflict through appropriate clusters.
Journal of the Korean Institute of Landscape Architecture International Edition
/
no.1
/
pp.176-182
/
2001
The case for study in this paper is the Main Plan and Management for the Fukutoshin; the restructure of Nishi Shinjuku, This plan was first outlines in 1960, and includes a vast area of 96 ha for redevelopment. It aims to create a totally new center in the city. This was the first case in Japan, and in the world of a plan of these magnitudes. involving urban landscape restructuring from three points: Landscape (open spaces for public use: the Shinjuku Central Park and the surrounding area of the buildings), transport and commercial building developments. The Landscape plan for the green areas was decided in a way to compensate the population of the area and the visitors. As a rule, high-rise building constructions are placed each one in single lots and are surrounded by open spaces and greenery. Pedestrain areas are widened and also connected by bridges in a way to allow free circulation, and interconnection between the constructions and the green areas. Another important factor is the role that Private Corporation, and public interest plays. Joining these two forces has allowed the concretization of this project. This interpolation between public and private roles was an innovation in Japan, and it also the key for the concretion of the project. The historical review of the process and management of this project help us to put into perspective the introduction of new concepts and ideas, which were not related at that time to traditional Japanese Landscaping. Furthermore we are better able to understand the substantial increase in the percentage of land dedicated to green areas in contrast to the typical standards of Japanese cities.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.289-290
/
2023
According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.
The interest in economics and efficiency of IT investment is growing as the amount of overall governmental IT investment steadily increase. Accordingly, there is a strong need to determine whether the expenditure incurs effectively for IT investment and to accurately analyze the economics of IT investment, In this perspective, this study discusses the prior researches on concepts regarding the analysis of IT investment management framework as proposed from academic and professional perspectives in advanced countries' government sectors. Thereafter, an adoption of IT investment management (ITIM) framework has been considered so as to enhance the performance of ICT initiative projects in the public sector. In the suggested IT investment management framework, we suggest economics and efficiency of public IT investment should be improved by integrating ICT project selection and control as well as evaluation stage into single governance framework.
Korean Journal of Construction Engineering and Management
/
v.13
no.4
/
pp.152-163
/
2012
At the conceptual phase of a construction project, estimated construction cost is very important as it significantly influences the owner's decision-making. Accurate cost estimating, in the early stage of a public construction project, serves as a critical factor because initial decision-making effects the final cost of a construction project. However in the cases of Korean public apartment projects, excluding a few of the public owners, there is a problem in properly estimating construction cost due to the lack of construction cost estimating system. Thus, this research developed a public apartment cost estimating system using case-based reasoning that was suggested by a previous research with 66 cases of Korean public apartment projects. Based on the system experiments involving 19 public officers and 10 cases of Korean public apartment projects, the effectiveness of the system in terms of estimation accuracy and user-friendly was confirmed. As a result, the developed system has an error range of 1.47% to 13.74% and mean of 6.15%. In addition, the system was evaluated that it could greatly improve the current estimation task of public officers. Consequently, the results of this research can be used as a foundation for a technological advance in estimating construction cost and improving the accuracy and consistency of construction cost estimation.
While Korea has actively discussed the fields of comics and animation, with an aim toward public art and publicity for cultural welfare, research on public cultural content for the underprivileged and their regions is in fact lacking. The Korean government has also tried to improve Korea's cultural welfare, but its benefits have failed to be evenly given to the underprivileged. Therefore, we need to take greater interest in the underprivileged and their regions. Korea should work to correct the unbalance among regions in the field of cultural welfare (cultural differences between the capital area and other regions, and between new towns and old), as well as improve the living environments of isolated areas. For this reason, such a public art project should be conducted from two directions. First, the underprivileged living in poor conditions should be allowed to live in clean and cultural environments. And second, public art, comics, and storytelling through animation should be formed with an eye on urban culture. This project aims to focus on improving "the quality of citizens' lives" through creating the unique characteristics and landscape of the city. It will be presented through the use of public art, which presents the elements of the city with charm and vitality. The two directions stated above are our urgent tasks. Public art, comics, and animation storytelling regarding the history, culture, and natural resources of the region will develop with the affection and pride of the citizens, and public art will help create an environment that allows people to discuss their issues. In addition, it will be cultural environments that will allow all citizens to enjoy beautiful streets and events. This project will be an opportunity to realize cultural democracy by pursuing social values such as publicity, communication, equality, and participation.
The meaning and role of science culture based on such values as rational thinking, creativity, critical validation has been growing in the process of discussing various social problems. In order to diffuse science culture, it is important to sustain citizen's activeness by providing contents which can induce interest on the base of two-way communication between public and experts and to support citizen activities performed voluntarily. To that end, various people such as scientist, government policymaker, communicator, those in charge of culture and art, exhibition curator should make up collaboration system and such requirement as motivation, leadership, agreement between the participants, communication, trust relationship is also to be met properly in order to proceed collaboration efficiently. This study reviews how these factors are coming true in governmental project for science culture and develops proposal for improvement on the base of opinions collected through expert meetings, interviews, workshop and data research. In addition, it explains that government must strengthen scientific cultural project personnel and lay infra such as communications hub, regional center, platform and improve the business selection method to promote competition and collaboration among project participants with reformation of reward and regulatory systems. It is performed to suggest comprehensive ways to increase efficiency of project for science culture out of not the deficit model which regard public as passive acceptant but context model or PES(public engagement in science) that take public who focus his attention and participate actively into account.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.