• Title/Summary/Keyword: public IT project

Search Result 1,181, Processing Time 0.021 seconds

The Structural Characteristics of Work Processes in Public Design Projects (공공디자인사업 수행 프로세스의 구조적 특성에 관한 연구)

  • Park, Su-Kyoung;Moon, Jeong-Min
    • Korean Institute of Interior Design Journal
    • /
    • v.22 no.3
    • /
    • pp.145-153
    • /
    • 2013
  • Since a government design department office was set up in 2007, active design projects have been implemented. With this opportunity, each local self-governing organization has improved its administration and institutions, and are planning intensive research on public design for efficient execution of public design projects. However, recent public design projects have caused many problems due to unspecialized design processes, a lack of cooperation with relevant organizations, and unsatisfactory management systems after projects. Therefore, to overcome such problems in the execution of public design projects, a procedure-centered model should be developed. This study aims to analyse the process structures for the strategic execution of public design projects, and the methods and content of the execution process. For this purpose, this study looked into the process structures of public design projects based on design management strategies in order to draw suggestions needed for the execution process through advanced cases. The study is summed up as follows: First, when the process of public design projects was examined in terms of management strategies and design management strategies, it included two dimensions: the management structure of general projects and the design of development projects. Secondly, through the analysis of public design cases, this study discovered useful methodologies and the main programs used and drew suggestions needed for each step in public design projects. It is expected that the results of this study will be helpful for the development of a process model appropriate for national public design projects based on the current status of the project execution and to make a contribution to systematic development in national public design.

Investigation on the directions of practical use in public purpose of the proto-type Korean High Speed Train(HSR 350 x) (한국형 고속열차의 공익적 목적 활용방안 대안 연구)

  • Mok, Jin-Yong;Park, Chan-Kyoung;Kim, Ki-Hwan;Kim, Sang-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.613-618
    • /
    • 2008
  • Proto-type Korean High Speed Train(HSR 350x) had developed in 2002 through G7 High Speed Train R&D project from 1996, had carried successful trial running test up to 350km/h and has been executing running test more than 0.2 Mil. kilometers of accumulated running distance to insure reliability on service line till July 2008. Even though the R&D project has finished by Oct. 2007, the proto-type train HSR 350x has maintaining various measuring functions and test facilities till now. So it may be needed a suggestion on the direction of practical use in public purpose of the HSR 350x. This study has suggested several directions of practical use in public purpose of the HSR 350x, and feasibilities for each alternatives of practical use in order to contribute making reasonable decision for practical use of the train in public purpose for the future.

  • PDF

A Study on the Itinerant Librarian at Small Libraries (작은도서관 순회사서 운영에 관한 연구)

  • Kim, Su-Jin;Kim, You-Seung
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.25 no.4
    • /
    • pp.59-78
    • /
    • 2014
  • Since 2010, the itinerant librarian project has aimed to support small libraries and to establish cooperative systems between public libraries and small libraries. However, the project has been criticized for several issues, although there are some positive evaluations. In this context this study aims to analyze various issues of the project and to provide alternative strategies. Based on analyzing previous studies the study discusses the concept and social background of itinerant librarians. Furthermore, it explores the issues of the project, including low awareness and employment instability of itinerant librarians through the interviews with participants of the project. As a result, the study provides six alternative strategies to improve the project.

Performances of Farm Management Consulting Project (농가경영컨설팅 추진현황과 성과)

  • Kang, Kyeong-Ha;Jung, Ho-Gun;Park, Heung-Gyu;Lee, Min-Soo
    • Journal of Agricultural Extension & Community Development
    • /
    • v.8 no.2
    • /
    • pp.245-261
    • /
    • 2001
  • The consulting industry had enjoyed growth rates over the past 20 years which show no signs of slowing in their momentum. Since 1995, it began to discuss institutionalization of consulting in the agricultural sector in Korea. Rural Development Adminstration has launched farm management consulting project by means of benchmarking for farming innovation in 1988, which consists of establishing consulting team, developing standard diagnosis form of sixty crops and materials, training consultants, having various public relations, and making information systems. Until October, 2001, sixty seven thousands of farmers have benefited on this project. It is now appreciated as a alternative for new agricultural extension approach. Analyzing the changes of farm management practice level through consulting shows improvement, which data have been stored in web database. It is expected that farm management consulting project be main stream of agricultural extension in this country.

  • PDF

Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector (공공부문 시공책임형 CM 사업의 시공이전단계 성과분석)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.97-105
    • /
    • 2021
  • The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related laws and regulations to move to the formal ordering system, and the performance analysis of the project is still insufficient. In this paper, the effectiveness and reliability of the project were verified through the performance analysis of the Pre-Construction Service of the four pilot projects currently being implemented. The results of the study were analyzed in five areas including Team Building, Design Book, Construction Period, VE, and BIM. Through the interview survey, the problems were confirmed and improvement plans were presented. The results of this study are expected to be used as basic data for the legalization of ordering system to be implemented in the future.

The Impact of If Project Types and Ownerships on IT Value Evaluation (IT 프로젝트 유형과 오너쉽이 IT 가치평가에 미치는 영향)

  • 이국희;구본재
    • Journal of Information Technology Applications and Management
    • /
    • v.9 no.3
    • /
    • pp.79-95
    • /
    • 2002
  • As the budget size and complexity of 1T investment are growing, IT value measurement becomes more critical to the success of IT management In public organizations and private firms. It has been known that there are many factors such as IT costs, risks, qualify, and usage that should be taken Into consideration during the process of measuring IT value and making IT Investment decisions. However, little research has been done so far In order to analysis factors affecting the IT value and effectiveness. The purpose of this study Is to Investigate the impact of IT Project types and ownerships on IT value evaluation. The three research questions are as follows : (1) Does IT project type such as transactional, Informational, and infrastructure have any impact on 1T value measurement\ulcorner (2) Does the IT development ownership has any Impact on IT value\ulcorner (3) Does the IT operation ownership has any impact\ulcorner The empirical research was done at S-Electronics, world-wide known and the biggest manufacturing company in Korea, based on the method of structured interview. About 200 individual Information systems have been evaluated to calculate ROI measures, the dependent variable In this study. The results of statistical analysis show that two of three Independent variables, IT project types and IT development ownership, have statistically significant effects on IT value in terms of ROI measures.

  • PDF

The Improvement Plan of Project Management for Highway Construction Supervisor using Construction Management Benchmarking of Developed Countries (선진국의 공사관리 벤치마킹을 통한 도로건설공사 감독자의 공사관리 향상방안)

  • Lee, Min-Woo;Shin, Eun-Young;Lee, Kyo-Sun;Park, Hwan-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.138-148
    • /
    • 2006
  • The construction supervisors of the public companies are usually responsible for process management, quality management, safety management, and many other various tasks that occur during construction project. Public companies such as Korea Highway Corporation have developed a framework and manual for management and supervision of construction projects. But, there has been the change of business environment such as increase of private investment project and the introduce of construction management system recently. It has been necessary for construction supervisor to streamline the current project management system in the owner's aspect in order to cope with the expected new challenges. Accordingly, this research has been investigated and analyzed the operation system between Korean supervisor and foreign supervisor in their public corporation. This research has suggested the advanced project management in their public corporation. Especially, this study has proposed the construction management manual for supervisors such as inspectors training, supervisors construction manual, and supervisors training road map.

Public-Private Collaboration Process for Planning Phase of Urban Renewal Projects (도시환경정비사업 계획단계 민.관 협의 프로세스 도입 방안)

  • Lee, Jong-Kweon;Park, Hyeon-Soo;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.22-30
    • /
    • 2011
  • In the planning phase of domestic urban environment maintenance and improvement projects, a particular problem is the increase in service expenses and project cost with the establishment of plans under circumstances that exclude the residents or have incomplete consent from them and the public organization. This delays the promotion of the project. This study aims to resolve such problems by proposing a measure to introduce a privatepublic consultative body for residents and the relevant departments of the public sector, to encourage them to participate and establish plans together from the beginning. This is expected to contribute to the smooth promotion of the project, as it would remove the conflicting factors that are expected to be generated in the project implementation phase before they could emerge.

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

Public Building Value Evaluation Using Contingent Valuation Method Based on Market Value Estimation

  • PARK, Jieun;YU, Jungho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.367-370
    • /
    • 2015
  • Building deterioration reflects the degradation of basic building performance including structural performance, energy performance, durability, and safety, and it also includes perceived deterioration, which considers a user-based perspective. More than 50% of the existing buildings in Korea are over 15 years old and public buildings compose 2.5% of all buildings domestically. Therefore, there are several different problems, such as poor energy efficiency, structural performance, and safety. To address the challenges of increasing stock in deteriorated buildings, it is necessary to make decisions about reconstruction or renovation. In this study, we propose a new method to evaluate public building value with a contingent valuation method (CVM). By estimating willing-to-pay (WTP) from users of private buildings in similar situation with the public building, it is possible to compare market prices and calculate a correction factor to adjust the WTP data. Finally, we apply the correction factor to the WTP of a public building and estimate market price, willingness to pay (WTP). Finally, we apply the correction factor to willing to pay (WTP) of public building and estimate market price.

  • PDF