Risk analysis using PROMETHEE method In Building Construction MANAGEMENT

  • Jang-Young Lee;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1364-1369
    • /
    • 2009
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopt the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE method makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to prove the possibility of the PROMETHEE analysis process by being compared with AHP.

  • PDF

Analysis of Schedule Risk using PROMETHEE (PROMETHEE 기법을 활용한 공정리스크 중요도 분석)

  • Lee, Jang-Young;Yoon, Yoo-Sang;Jang, Myung-Hoon;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.353-357
    • /
    • 2008
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management processes identification, analysis and response. Especially, the analysis process is important to objectively identify importance and priority among risk factors. The purpose of this study is to develop the effective analysis process by studying and supplement the problem of the AHP analysis method. The study provides a analysis process to use the PROMETHEE analysis method proposed.

  • PDF

Analysis of the Schedule Risk using PROMETHEE in Building Construction Management (건설관리에서의 PROMETHEE기반 공정 리스크 분석)

  • Lee, Jang-Young;Yoon, You-Sang;Jang, Myung-Houn;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.25-34
    • /
    • 2010
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopts the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to provide process of risk analysis to use the PROMETHEE.

Evaluation of Risk Factors in Water Supply Networks using PROMETHEE and ANP (PROMETHEE와 ANP 기법을 활용한 상수도관망의 위험요소 평가)

  • Hong, Sung-Jun;Lee, Yong-Dae;Kim, Sheung-Kown;Kim, Joong-Hoon
    • IE interfaces
    • /
    • v.19 no.2
    • /
    • pp.106-116
    • /
    • 2006
  • In this study, the priority of risk factors in supplying water through water supply pipeline network was evaluated by PROMETHEE and ANP multi-criteria decision analysis. We chose 'corrosion', 'burst' and 'water pollution' in pipe as major reference criteria and selected eight risk factors to evaluate the priority, and then we compared the results of PROMETHEE with those of ANP. We also analyzed the results of the sensitivity analysis by changing the weights and parameters of preference functions in PROMETHEE. We investigated the possibility of integrating two methods by using the results of ANP as the weights of preference function in PROMETHEE. The priority of risk factors for supplying municipal water which is evaluated by this study may provide basic data to establish a contingency plan for accidents, or to establish the specific emergency response procedures.

Decision Making Model for Agricultural Reservoir using PROMETHEE-AHP (PROMETHEE-AHP를 이용한 농업용 저수지의 의사결정모형)

  • Choi, Eun-Hyuk;Bae, Sang-Soo;Jee, Hong-Kee
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.5
    • /
    • pp.57-67
    • /
    • 2012
  • This paper presents the Multi Criteria Decision Making (MCDM) to evaluate water resources plan for agricultural reservoir. Preference Ranking Organization METHod for Enrichment Evaluations (PROMETHEE) and Analytic Hierarchy Process (AHP) were used to estimate weight and priority of alternatives to find out the most reasonable and efficient way of water resources assessment. The 6 criteria that both decision maker and beneficiary are satisfied have been identified to secure agricultural water resources and then the priority of 10 subcriteria was set. An enhanced PROMETHEE-AHP model was used to perform pairwise comparison and find out the priority of each alternative because the existing decision making model have uncertainty and ambiguity. Comparison analysis of decision making models was carried out to find a way of suitable decision making and validity of PROMETHEE-AHP model was suggested.

Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project (초고층 건설공사 시공단계 리스크 요인 도출 및 분석)

  • Kim, Sooyong;Kim, Sunghyun;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.90-98
    • /
    • 2016
  • High-rise buildings construction project have various risk factors. Major risk factors are negative results such as time delay and increase of costs. Therefore, this study was analyzed risk factors in construction stages of high-rise buildings using by PROMETHEE technique. For this, this research were identified risk factors through experts Focus Group Interview(FGI). And, PROMETHEE was used to setup evaluation standard for analysis of high-rise building construction risks. Next, the standard of evaluation index calculation was composed by using the definition level in PDRI. Preference function and evaluation index were identified through questionnaires. Through these processes, this study has calculated the importance of high-rise building construction risks using by PROMETHEE technique. As a result, high degree risk factors were as following. These are 'Operation plan of material lifting', 'Outrigger & Belt Truss Construction', 'Foundation work plan of high-rise building' and 'Considering a Structure concept of high-rise building'.

A Study on Reconstruction and Remodeling's Selection Factors of Old Apartment Houses Using PROMETHEE-AHP (PROMETHEE-AHP 기법을 이용한 노후 공동주택의 재건축과 리모델링 사업선택요소 선정에 관한 연구)

  • Yoo, Seung-Min;Kwon, Oh-kyung;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.77-85
    • /
    • 2019
  • Reconstruction and remodeling have been introduced as a part of renewal (redevelopment) projects for old apartments built after the mid-1970's and government policies for revitalizing each project has been changed continually. However, the frequent changes of the policies have caused conflicts among business entities in selecting business methods. The conflicts from their early stages have made serious problems in the entire business process. Therefore, this study deduced factors of business selection by applying comparison analysis between the two business projects on how certain factors have an influence on selecting reconstruction and remodeling business projects. Based on the analysis, four categories and 26 factors were finally selected. After then, the priority of each selection factor was deduced through the AHP method and PROMETHEE method used for analysis of relative importance and impact values regarding to the business selection.

Evaluation of Risk Factors to Detect Anomaly in Water Supply Networks Based on the PROMETHEE and ANP (상수도관망의 이상징후 판정을 위한 위험요소 평가 - PROMETHEE와 ANP 기법 중심으로)

  • Hong, Sung-Jun;Lee, Yong-Dae;Kim, Sheung-Kown;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.1 s.162
    • /
    • pp.35-46
    • /
    • 2006
  • In this study, we proposed a layout of the integrated decision support system in order to prevent the contamination and to manage risk in water supply networks for safe and smooth water supply. We evaluated the priority of risk factors to detect anomaly in water supply networks using PROMETHEE and ANP techniques, which are applied to various Multi-Criteria Decision Making area in Europe and America. To develop the model, we selected pH, residual chlorine concentration, discharge, hydraulic pressure, electrical conductivity, turbidity, block leakage and water temperature as the key data item. We also chose pipe corrosion, pipe burst and water pollution in pipe as the criteria and then we present the results of PROMETHEE and ANP analysis. The evaluation results of the priority of risk factors in water supply networks will provide basic data to establish a contingency plan for accidents so that we can establish the specific emergency response procedures.

Study on the Inundation Risk Evaluation by the Relationship Analysis (다양한 침수인자간의 상관관계 분석을 통한 침수위험지역 예측)

  • Choi, Sung-Wook;Jun, Hwan-Don;Park, Moo-Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.115-118
    • /
    • 2008
  • In this study, PROMETHEE(Preference Ranking Organization METHod for Enrichment Evaluations) which is one of the multi criteria decision making methods is applied to estimate the relative inundation risk of the urban subcatchment. For this purpose, five factors which have an effect on the inundation risk are selected and used to perform PROMETHEE. Those are elevation average, slope average, density of conduit, population and sediment yields per unit area of each subcatchment. Based on them, PROMETHEE is performed and the relative inundation risk for each subcatchment is estimated. Sensitivity anlysis is conducted to evaluate each factor's effect on subcatchment and it is found that suggested method can be used to establish a practical guide to mitigate the inundation.

  • PDF

Application of AHP-PROMETHEE to determine areal and linear priorities for sewer rehabilitation projects (하수관로의 면단위 및 선단위 정비 우선순위 결정을 위한 AHP-PROMETHEE기법의 적용)

  • Ahn, Hosung;Yoo, Soonyu;Lee, Taehoon;Park, Kyoohong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.34 no.4
    • /
    • pp.289-301
    • /
    • 2020
  • Since sewer rehabilitation program requires long construction period and enormous capital investment, determination of rehabilitation priorities is important with systematic planning considering appropriate evaluation parameters. In this research, we applied PROMETHEE(Preference Ranking Organization METHod for Evaluations) known as very objective and scientific multi-criteria decision-making analysis, using the weights determined by AHP(Analytic Hierarchy Process) for the selected sewer evaluation items to calculate the rehabilitation priorities for each sewer sub-catchment in basin Gusan 1 of Seoul. Preference functions and preference thresholds were estimated for each criterion of ratio of lack of hydraulic capacity of sewers, defect ratio, ratio of sewers with velocity less than its minimum criteria, and density of sewers in the sub-catchment. As a result, it was found that region d had the first priority among four sub-catchments. For each and every sewer located in region d, we could also rank sewers to be rehabilitated urgently.