• 제목/요약/키워드: project-based work

검색결과 838건 처리시간 0.027초

로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석 (An Analysis on Relations between Design Errors Detected during BIM-based Design Validation and the Impacts Using Logistic Regression)

  • 원종성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.264-265
    • /
    • 2017
  • This paper aims to analyze relations between design errors prevented by building information modeling (BIM)-based design validation and their impacts in order to identify critical consideration factors for successfully implementing BIM-based design validation in the architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to its causes and work types. The relations between causes and work types of design errors and project delay, cost overrun, low quality, and rework generation that can be caused by the errors are analyzed through conducting logistic regression. Characteristics of each design error are analyzed by conducting face-to-face interviews with practitioners in the two BIM-based projects. As the results, the impacts of design error causes on predicting project delay, cost overrun, low quality, and rework generation were the highest.

  • PDF

소프트웨어 산업체 요구사항을 반영한 자동화된 프로젝트 계획 생성 지원 기법 및 도구 (Automatic Project Planning Technique and Tool Based on Software Industry Requirements)

  • 박지훈;신동환;홍광의;서동원;화지민;배기곤;서영석;배두환
    • 소프트웨어공학소사이어티 논문지
    • /
    • 제26권4호
    • /
    • pp.77-92
    • /
    • 2013
  • 소프트웨어 프로젝트 계획 생성 과정은 (1)프로젝트를 수행하기 위한 작업 구조(WBS)를 작성하고, (2)각 작업에 필요한 공수를 예측한 뒤, (3)작업에 인력을 할당하여, (4)전체 일정을 예측하는 과정으로 이루어진다. 프로젝트의 규모가 커질수록 가능한 작업 구조, 공수, 인력 할당의 조합의 수가 급격히 많아지며 이에 따라 프로젝트 계획 생성 과정의 복잡도가 매우 높아지게 된다. 따라서 이를 지원하기 위한 프로젝트 계획 생성 지원 기법이 필요하다. 본 연구에서는 실무 전문가 그룹과의 논의를 통해 소프트웨어 프로젝트 계획 생성 지원 기법에서 고려해야 할 여러 실무 요구사항들을 도출했다. 도출된 실무 요구사항을 고려하여 개발된 프로젝트 계획 생성 지원 도구 APP(Automatic Project Planner)는 개발 조직의 과거 지식 데이터를 활용한 공수 예측을 지원하며, 실무 이슈가 고려된 자동 인력 할당을 제공한다. 본 도구를 통해 합리적이고 현실적인 프로젝트 계획의 기반을 마련할 수 있다.

  • PDF

재택근무 가정의 실태 및 개념적 모델에 관한 연구 (A Study on Home-Based Work: The Chracteristics and Practices of Home-Based Work in the United States and The Conceptual Model for Studying on At-Home Income Generation)

  • 문숙재
    • 대한가정학회지
    • /
    • 제36권3호
    • /
    • pp.207-224
    • /
    • 1998
  • This study is approach to the Home-Based Work. More specifically, to examine about the families who try to combined home life and income-generation work under the same roof. Families were looking at Home-Based Work as one solution to the work-family crunch. Many research papers have suggested that Home-Based Work provides an effective way to balance the demands of paid employment and family responsibilities. Therefore, this proposed research reviewed the Home-Based Work as they contributed to individual and family satisfactions. The Prupose of this paper is to address issues related to Home-Based Work from the perspective of theory and application in family resource management, also to suggest a conceptual model for family work activities is advanced. This paper is examined concepts related to Home-Based Work employment that could be used to frame and describe the empirical study are specified. This paper was informed by analyses of data from project NE-167. "At-Home Income Generation: Impact on Management, Productivity, and Stability in Rural/Urban Families". The results from this paper will be helpful in enhancing the stability and satisfaction of families who worked in Home-Based Work.ased Work.

  • PDF

Managing Mega-Project Complexity in Five Dimensions

  • Gransberg, Douglas D.;Jeong, H. David
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.6-9
    • /
    • 2015
  • Traditional project management theory is based on a three-dimensional life cycle approach where the project managerseeks to optimize the dimensions of cost-schedule-technical (quality or design). This paper reports the findings of a case study analysis of two complex mega-projects in Michigan which confirm the findings of previous research and illustrates the use of a framework for five-dimensional project management (5DPM) that is for conceptualizing a complex project's scope of work. The framework elevates the recognition that the project's social/political context and the financial arrangements create complexity adding two new dimensions. This paper also demonstrates a methodology to graphically display a project's complexity to better understand and prioritize the available resources. The result is a "complexity footprint" that may help a complex project manager identify the boundary between controllable and uncontrollable projects impacts. The paper finds that applying 5DPM to the two case study projects has given the project delivery team a tool which is actually adding value to the complex project management process.

  • PDF

대규모 정보시스템 개발 프로젝트를 위한 개념적 작업분담구조도의 모형화에 관한 연구 (Conceptual WBS Model for a Large-Scale Information System Acquisition Project)

  • Nam Yong Lee
    • 한국전자거래학회지
    • /
    • 제6권1호
    • /
    • pp.55-67
    • /
    • 2001
  • Over the past decade, the topic of work breakdown structure (WBS) has gained an increasing amount of attention from information technology Professionals as an effective tool for managing the complexity of a large-scale information system development project. It is a method for planning and controlling a large-scale information system development. A WBS provides the basis for project organization, cost estimation, task scheduling, and contract management. Based on the authors' practical experience, this paper discusses how to establish a specific WBS and some considerations for developing a well-defined WBS. The model of WBS suggested in this study will provide useful insight and guidelines for establishing the spec-ific WBS for a large-scale information systems development.

  • PDF

Construction Delay Risk and its Prevention Measures

  • Acharya, Nirmal Kumar;Lee, Young-Dai;Im, Hae-Man
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.268-270
    • /
    • 2006
  • The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.

  • PDF

작업일보 데이터를 활용한 조적공사 작업간섭 요소 도출 (Masonry work interference factor deduction based on daily report data analysis)

  • 박민하;이혜린;고용호;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.172-173
    • /
    • 2015
  • Construction project involves numerous repetitive operations. Especially in high-rise and apartment houses projects, the amount of repetitive operations increase and a preceding operations delay causes serious damage to the total duration of the project. This study deducts work delay factors by site engineer interview and survey. The study analyzes daily report data to deduct crucial processes affecting masonry work which has been investigated to be one of preliminary processes conducted at the beginning of finish work.

  • PDF

파이로 프로젝트에 프로젝트 관리 적용 방안 (Application of Project Management on Pyro Project)

  • 김정국;김혁종;고원일;구정회;남효온
    • 시스템엔지니어링학술지
    • /
    • 제13권2호
    • /
    • pp.26-33
    • /
    • 2017
  • Pyro project, one of complex project, is now under research and development. To manage this kind project successfully, it is essential to apply the processes of technical management (TM) based on systems engineering (SE) and project management (PM). In this paper, the project management processes from ISO-21500 standard, PMBOK guide, and PRINCE2 guide were reviewed, and then some common PM for the large national R&D project were selected. An integrated technical management and project management frame work was finally established and suggested for Pyro project.

ERP 프로젝트의 외생위험이 실물옵션 선택에 미치는 영향에 대한 실증 연구: 국내 ERP 프로젝트를 중심으로 (The Effect of Exogenous Risks Upon the Choice of Real Options in ERP Projects in Korea: An Empirical Approach)

  • 남승현;김태하;양희동
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제22권3호
    • /
    • pp.43-58
    • /
    • 2013
  • This work investigates factors that may affect the choice of real options by ERP project managers. Financial theory suggest that these factors include risk-free interest rate, time to maturity, volatility of net present value, and options exercise price. Other than these factors, we are interested in the exogenous risks related to external uncertainties about technological cost, user learning and consulting, and so forth and we argue these risks should have a significant impact upon the volatility of net present value. To validate these factors empirically, we collected survey questionnaires from ERP project managers in Korea. We find that perceived exogenous risks with regard to ERP projects influence volatility and additionally find that ERP project managers prefer contract options of the project when the volatility of the project is expected to be high. We expect that this work will not only validate theoretical propositions but help project managers consider ERP options strategically based on these factors.

INFLUENCE FACTOR-BASED RISK ASSESSMENT METHODOLOGY FOR CONSTRUCITON

  • Hyunsoo Kim;Hyunsoo Lee;Moonseo Park;Kwang-pyo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1231-1236
    • /
    • 2009
  • Many work-related risk factors can cause construction site hazards. Therefore, safety management begins with measuring the magnitude of risk involved in a project. This study proposes a methodology for risk assessment of major trades at a particular construction site. To assess risk, this methodology integrates hazard severity and frequency, and their magnitude is calculated based on actual work-site hazards. This methodology also considers the influence factors that affect the frequency of work-related hazards. To select the appropriate influence factors, a two step approach is deployed. First, the predominant factors are identified through a literature review. Second, a selective process filters out the influence factors that are difficult to analyze quantitatively, and these extracted factors are weighted using expert surveys. Finally, the factors are combined and a quantitative risk assessment methodology is proposed.

  • PDF