A Study on the Development of a BIM-based Spatial Planning Simulation System for Architectural Planning Stage Support (건축기획단계 지원을 위한 BIM 기반 공간계획 시뮬레이션 시스템 개발에 관한 연구)

  • Choi, Sun-Young;Choi, Ju-Won;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.19-23
    • /
    • 2011
  • The planning stage of an architectural project has much more significant effects on the cost or outcome of the project than other stages of the project. In addition, the importance of architectural planning has been further increasing according to the recent trend of construction projects becoming larger in scale and more complex. In spite of this, the current situation is that the planning stage work is not being systematically managed. Accordingly, the purpose of this study was to develop a BIM-based simulation system for providing support during architectural planning stage such as spatial planning & review, cost review, project owner requirements management, etc. It is easy to review various alternatives using this system that allows not only the modeling of space object modeling but also the instantaneous review of spatial area & layout, cost, etc. based on object information. In addition, it can be used as a communication tool with the project owner as it provides the visualized information and quantitative data of the building model, and the information created through this system can be delivered to the following stage for usage. It is thought that using this system, the entire project work including the architectural planning stage can be supported and even contributing to the advancement of architectural process.

Countable-grid Scheduling Method (CSM) and CSM-based Soft-logic Algorithm Development for Automated Construction Scheduling and Visualization (건설 공정계획 자동화와 시각화를 위한 가산 그리드 공정계획 기법(CSM)과 CSM기반 소프트로직 알고리즘 개발 연구)

  • Choi, Heungsoon;Moon, Seonghyeon;Chi, Seokho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.65-77
    • /
    • 2022
  • Schedule management is one of pivotal project success factors during construction projects. However, there are many difficulties in rapid scheduling and controlling since the existing planning techniques require considerable amount of manual work and manager's judgment in a construction project. This research aims to propose a new scheduling method and algorithm for automating and visualizing the planning process, which is called Countable-grid scheduling method. In this method, if the scope of work is defined via a visualized tool, the schedule plan is created automatically according to the productivity and workable conditions of each activity. The location of the work for each date can be visualized in grid-based approach. Moreover, the work schedule can be updated automatically according to the progress. The industrial applicability of the proposed method was verified in construction projects via case study with sample data. This research can contribute to the construction industry by automating the construction schedule management process.

BIM Based Intelligent Excavation System (BIM 기반 지능형 굴삭시스템)

  • Kim, Jeong-Hwan;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.1-5
    • /
    • 2011
  • Earthwork is important in terms of construction time and duration, and highly related to the construction productivity. However, current earthwork system has stick to labor intensive process depending on skilled operator's heuristic decision making, so it is hard to improve overall productivity. To overcome this drawback, this paper presents a BIM based Intelligent Excavation System(IES). The BIM technology is applied in the excavation task planning system, Human-Machine Interface for remote-control/autonomous work environment, and web-based Project Management Information System(PMIS) in the IES integration process, and the results are addressed.

Development of Automation Technology for Modeling of Railway Infrastructure using BIM Library (BIM 라이브러리를 활용한 철도 인프라의 모델링 자동화 기술 개발)

  • Kim, Yun-Ok;Moon, So-Yeong;Yoon, Hee-Taek;Park, Young-Kon;Kim, Ji-Young
    • Journal of KIBIM
    • /
    • v.12 no.3
    • /
    • pp.18-29
    • /
    • 2022
  • Recently, research on the application of BIM has continuously been active not only in architecture but also in civil engineering in order to improve work efficiency across the project's planning, design, construction and maintenance phases. However, the empirical applications of BIM targeting to civil engineering scope of construction sites still lags compared to architectural sized projects. This is because BIM tools are mainly based upon vertical structures of architecture, thereby most of them have difficulties and limitations to get utilized on horizontal structures of civil engineering. Therefore, this study intends to propose automation technology of design using BIM library and to indicate its field availability through case application on a railway project representing linear infrastructure. In addition, it put forward the utilization plan of the automation technology upto 4D and 5D by continue making use of the BIM model created in the project's design stage up through the maintenance stage. The novel method of the technology proposed in this paper incorporates the automatic creation of the BIM library based on two-dimensional tunnel cross-sections and sweeping of it over three-dimensional alignment to create a BIM model of linear infrastructure. The proposed technology is anticipated to improve the efficiecny of modeling process of railway projects based on linear structures.

Intelligent Document Management System based on Multi Agents (다중 에이전트 기반의 문서 관리 지원 시스템의 설계 및 구현)

  • 조홍진;이은석
    • Proceedings of the IEEK Conference
    • /
    • 1999.11a
    • /
    • pp.997-1000
    • /
    • 1999
  • It is becoming increasing1y the norm for project teams to be composed of individuals who are geographically distributed but connected by high speed network. In such environments a lot of work related documents are created, so there is real needs for the system that facilitate the effective sharing, maintaining. managing of them. This paper present the system that satisfy this needs, which is known as IDOMA(Intelligent Documents management system based on Multi Agent). IDOMA is the cooperative multi agent based documents management system which has not centralized database.

  • PDF

A Study on Construction of Management System for Efficient Management and Application of Regional Development Project (지역개발사업의 효율적 관리 및 활용을 위한 관리체계 구축에 관한 연구)

  • Kim, Nam-Jung
    • Land and Housing Review
    • /
    • v.7 no.1
    • /
    • pp.1-8
    • /
    • 2016
  • This research has its objective in searching for a management plan that is stronger than existing plan for the regional development project in time for the execution of "Regulations on Regional Development and Support". Accordingly, the following plans for improvement are suggested to make improvements in lack of regional development projects management awareness; absence of integrated management system; and lack of reliability in project management information. Firstly, the management of regional development project needs to be operated as a system for project evaluation management based on related legislations. Secondly, various information of regional development project should construct a database, which becomes an information system that can be utilized by the central government and regional governing organizations. Third, to promote efficiency in regional development project management and expertise, it is necessary to prepare a project management system utilizing professional outsourcing organizations and such. Lastly, it is necessary to improve the work environment to enhance the expertise and the responsibilities of those government officials in charge of the project.

Analysis of alternative project for demonstration route construction of Urban Transit Magnetic Levitation System (도시형 자기부상철도 시범노선건설 대안설계의 분석)

  • Kim, Byoung-Seop;Lee, In-Yong;Kim, Si-Gon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.581-591
    • /
    • 2010
  • Korea Rail Network Authority ordered Urban Transit Magrev System on the alternative tender lines. The project was contained order with GS Construction and Yooshin Corporation as a result of competition as 5 consortium. Urban Transit Magrev System route was constructed in the whole Yeongjong-dong and Yongyu-dong, Jung-gu, Inchen. The main project is via transportation center in Inchen Int'l airport ~ Work complex ~ Water park ~ Yongyu-station and has Total continuation of 6.1kilometers, Station of 6 spot, Car base of a spot, go out line(a single line) of 380meters. Scale of construction is Major of Roadbed, Railroad, Building, Inspection and Repair facilities. The first Urban Transit Magrev System in Korea is a new symbol of Korea and has polished beauty and creative artistry based on functional perfection. It was designed in harmony with Inchen Int'l Airport improving the dignity of SOC design.

  • PDF

The Solution Of Software Contract (기획특집 - 공공 소프트웨어 발주관행 개선방안(IT 프로젝트관리 실무))

  • Shim, Ki-Bo
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.5
    • /
    • pp.29-31
    • /
    • 2009
  • A general practice in software ordering behavior in public sector has been an enormous obstacle standing in development path of Korea's software industry. Standard on software development cost estimation is supposedly based on Function Point, but in general, it is on headcounting (a number of people involved in a project). Moreover, it is difficult to change a contract in an on-going project, since statement of work is not precisely and carefully described. But it has a simple solution. Design and Implementation should be a separate project, as in construction industry, and both power and responsibility for design should be given to an expert with a national-level qualification. Here, there is a simple way for Korea to reborn as one of the strongest software country.

  • PDF

ICT-BIM based Quality Nonconformity Control Method for Construction Project (ICT-BIM 기반 건설프로젝트 품질부적합 관리 시스템)

  • Son, Sang-Hyuk;Lee, Hyung-Guk;Bae, Sang-Hee;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.76-77
    • /
    • 2016
  • This paper presents an automated construction quality nonconformity control method. Existing quality control process are confined attributed to the dependence on human quality personnels. They are inefficiency for continuos quality improvements and may cause project schedule delays when any nonconformity is handled timely fashion. For sure, It is important to identify the add hoc quality nonconformity control processes and to implement them into an automated system that controls its' work-flow. It would be desirable to develop the construction project quality nonconformity control system using Building information modeling(BIM) and Information and Communications Technologies(ICT). It may provide an effective platform to prevent quality issues that exist in the existing quality management practice.

  • PDF

An Overview of Time Estimation in the Appraisal of Completeness for Software

  • Kim, Yukyong
    • Journal of Software Assessment and Valuation
    • /
    • v.16 no.1
    • /
    • pp.21-26
    • /
    • 2020
  • The completeness appraisal of software is performed in various forms, such as assessing the completion level in the development process, calculating the defect rate, estimating the development cost, and calculating the redevelopment cost. Along with this, the problem that is often dealt with is estimation of the development time. Even in a dispute over completeness due to delays in software development, issues of calculating an appropriate development time required to develop a delivery software or a development time required for change requests are often included in the appraisal request. In this paper, we introduce the procedure and method for estimating the appropriate project time of software development so that the appraiser can be applied to the appraisal work for determining the completeness. The method is based on the manual for calculating the appropriate project period of software development project.