ANALYSIS AND IMPROVEMENT OF FINISHING WORK PROCESS FOR COST MANAGEMENT (FOCUSED ON INDOOR FINISHING WORK OF APARTMENT)

  • Hoon-Ku Lee;Yoon-sun Lee;Ja-Young Yoon;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.711-720
    • /
    • 2007
  • Apartment housing in the Korean domestic construction industry has had various and high-quality finishing work since the enforcement of price deregulation in 1998. Before the enforcement of price deregulation, feasibility studies of housing projects have not had particular difficulties as uniform description of finishing work items were reflected and finishing work cost also was equalized. However, the recent distinction of finishing work based on the same floor plan brings about project cost variation, along with many effects on construction management due to project cost increment. Accordingly, this paper suggests the improved plan of cost management to control the feasibility study result consistently during the life cycle of a project through an analysis based on cost management phase due to cost blackout, appearing at the commencement of a project, cost gradation caused by high-quality finishing work item, and cost reduction due to the degradation of finishing work after analysis of current apartment construction process focused on finishing work using the IDEF process analysis technique.

  • PDF

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

원자력발전소 Work Breakdown Structure 개발 (Development of Work Breakdown Structure for Nuclear Power Plant)

  • 조영혁;양명덕
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

팀프로젝트 기반 학습법에 대해 지각된 유용성의 선행요인과 결과요인에 대한 연구 (Antecedents and consequences of perceived usefulness of team project-based learning)

  • 이성미
    • 문화기술의 융합
    • /
    • 제6권4호
    • /
    • pp.411-417
    • /
    • 2020
  • 본 연구는 대학생이 지각하는 팀 프로젝트 기반 학습법에 대한 유용성과 학습만족도 간의 관계를 규명하고 지각된 자율성, 협력적 효능감, 인지된 상호작용성이 지각된 유용성에 미치는 효과를 탐색하였다. 이를 위해 경기도 소재 대학생 55명이 한 학기 동안 팀 프로젝트 기반 학습을 완료 후 설문조사에 참여하였다. 본 연구의 결과는 다음과 같다. 첫째, 팀 프로젝트 기반 학습법에 대해 지각된 유용성이 높을수록 학습만족도가 높게 나타났다. 둘째, 지각된 자율성과 협력적 효능감을 높게 인식할 때 학습법에 대한 지각된 유용성을 높게 인식하였다. 이와 같은 연구결과는 대학의 팀 프로젝트 기반 학습법 설계 시 학습자가 학습법이 효율적이고 유용하다고 느끼게 하는 것이 중요하며 이를 위해 자율성을 지지하는 환경조성과 학습자가 협력하여 공동의 목표를 성취할 수 있는 능력을 충분히 갖췄다고 느낄 수 있는 전략이 필요함을 시사한다.

재택근로와 가족자원경영학의 과제 (Home-Based Work and the Tasks of Family Resource Management)

  • 김외숙
    • 가족자원경영과 정책
    • /
    • 제2권2호
    • /
    • pp.83-92
    • /
    • 1998
  • The purpose of this study is to review the concept of home-based work, introduce the activities of American home economists on home-based work and propose the tasks of family resource management for home-based work. Home-based works is defined as the work which generates income at home and classified 3 types: home-based business, employed home-based work and homework. The activities of American scholars are reviewed focusing on the Coorperative Regional Research Project, NE-167, entitled "At-Home Income Generation: Impact on Management, Productivity and Stability in Rural/Urban Families"and the participants of the project. Finally the tasks of family resource management are pursued in terms of research, education and service.d service.

  • PDF

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

AI-Based Project Similarity Evaluation Model Using Project Scope Statements

  • Ko, Taewoo;Jeong, H. David;Lee, JeeHee
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.284-291
    • /
    • 2022
  • Historical data from comparable projects can serve as benchmarking data for an ongoing project's planning during the project scoping phase. As project owners typically store substantial amounts of data generated throughout project life cycles in digitized databases, they can capture appropriate data to support various project planning activities by accessing digital databases. One of the most important work tasks in this process is identifying one or more past projects comparable to a new project. The uniqueness and complexity of construction projects along with unorganized data, impede the reliable identification of comparable past projects. A project scope document provides the preliminary overview of a project in terms of the extent of the project and project requirements. However, narratives and free-formatted descriptions of project scopes are a significant and time-consuming barrier if a human needs to review them and determine similar projects. This study proposes an Artificial Intelligence-driven model for analyzing project scope descriptions and evaluating project similarity using natural language processing (NLP) techniques. The proposed algorithm can intelligently a) extract major work activities from unstructured descriptions held in a database and b) quantify similarities by considering the semantic features of texts representing work activities. The proposed model enhances historical comparable project identification by systematically analyzing project scopes.

  • PDF

How Much Discrepancy Can Happen from BIM-based Quantity Take?

  • Kim, Seong-Ah;Chin, Sangyoon
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.263-267
    • /
    • 2015
  • Stakeholders of a construction project expect cost savings through fast and accurate cost analysis by performing BIM-based quantity take-off (BQT). However, authors have observed that there can be discrepancies in the results of BQT depending on the level of development (LOD) and modeling methods. In addition, since quantity take-off methods are different depending on the construction work items, the combination of LOD, modeling methods of BIM, features of construction work items can cause serious overestimate or underestimate in BQT results. It is necessary to identify what kind of problems can happen and how those problems can be avoided in various construction work items, since the discrepancy of quantity take-off results has great impact on not only cost analysis but also the determination of contract amount and it can cause claims, poor construction quality, cost overruns, and many others later in the construction project. Therefore, this paper focuses the identification of issues and problems of BQT at each construction work item level based on two categorizations of structural works and interior works.

  • PDF

PLANT 건설공사의 문제점과 대책에 관한 고찰 (온산동련소 건설의 토건공사및 철골공사 사례를 중심으로) (A study on the problem and Counter measure of plant Construction project. -Based on tile work of both civil engineering and steel structure in the plant construction project of On-San Refinery-)

  • 유광수
    • 기술사
    • /
    • 제16권1호
    • /
    • pp.13-19
    • /
    • 1983
  • As one of staff members participated in the full course of the plant construction project of On-san Refinery to its successful completion. I had my past expierence that the plant construction project was so complicated, and a Long period required, and thus there were so money problems to be solved. Among the problem, I mainly noticed that the following listed points were solved and improved. 1. Each drawing should be in every accuracy possible. 2. Contract should be specified in every detail possible. 3. All invoiced prices of breack down list should be coped with the current market prices. 4. All execution of work should be in the most accuracy. A. Planing execution of work. B. Coordination with supervisor group. C. Economical method for execution of work. D. Safety control. 3, Calculation work field should be established seperately 6. Each staff members should be work at the best of his pride.

  • PDF

CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발 (Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI)

  • 정미서;한혁수
    • 인터넷정보학회논문지
    • /
    • 제9권6호
    • /
    • pp.155-163
    • /
    • 2008
  • 소프트웨어 프로젝트가 착수 후 성공적으로 종료되기 위해서는, 계획에 따라 프로젝트가 잘 진행이 되고 있는지의 여부를 주기적으로 검토하고 만약 문제가 있을 경우에는 적절한 시정 조치를 취하는 프로젝트 통제활동이 필수적이다. 프로젝트 통제활동은 주간회의나 마일스톤 회의 등과 같이 주기적으로 수행되는 보고회의를 통해 이루어지는데, 이때 프로젝트 관리자는 일정, 비용, 작업성과 등을 검토해 봄으로써 프로젝트의 진행 상태를 파악할 수 있다. 프로젝트 통제활동을 지원하는 방법으로 가장 많이 쓰이고 있는 EVM(Earned Value Management)은 일정과 작업성과에 관한 측정치를 비용으로 산정하여, 일정, 비용, 작업성과를 하나의 그래프에 표현하는 방법이다. 프로젝트 관리자는 EVM을 통하여 비용이라는 하나의 단위로 프로젝트의 작업 성취도와 진도율을 정량적으로 관리 할 수 있다. EVM은 전체작업을 단위작업으로 나누어 각 단위작업의 작업 기간과 작업량을 비용으로 환산하여 관리하는데, 주로 프로젝트의 범위가 초반에 정의되고 단위작업의 크기가 큰 경우에 적용이 쉽고 관리가 편하다. 이러한 이유로 폭포수(Waterfall) 기반의 프로젝트에 주로 적용되고 있다. 그러나 XP(eXtreme Programming)기반의 프로젝트에서는 요구사항이 프로젝트 초반에 완벽히 정의되기가 어렵고 단위작업의 크기가 작아, 프로젝트 초반에는 상위레벨 수준으로만 범위가 정의 되고 반복이 진행되면서 점점 상세한 범위가 정의되기 때문에 EVM이 활용되고 있지 않다. 따라서 본 논문에서는 XP에 EVM을 적용할 수 있는 방안인 3단계(Layer) EVM을 제시하고, 조직이 이를 구축하도록 지원하기 위해 CMMI(Capability Maturity Model Integration)의 PMC(Project Monitoring and Control) 프로세스 영역을 기반으로 프로세스를 정립하고, 그에 따른 적용 지침을 개발하였다.

  • PDF