• Title/Summary/Keyword: project management information system

Search Result 1,357, Processing Time 0.027 seconds

Program Development and Field Application for the use of the Integration Map of Underground Spatial Information (지하공간통합지도 활용을 위한 프로그램 개발 및 현장 적용)

  • Kim, Sung Gil;Song, Seok Jin;Cho, Hae Yong;Heo, Hyun Min
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.6
    • /
    • pp.483-490
    • /
    • 2021
  • Due to the recent increase in various problems from underground development in urbanized areas, accurate underground facility information management is highly needed. Therefore, in this study, in order to utilize the Integration Map of Underground Goespatial Information in real time on-site, the function of comparing the mutual location of the GPR (Ground Penetration Radar) sensing data and the Integration Map of Underground Goespatial Information, and function of analyze underground facilities, and function of converting surveying data into a shape file through position correction & attribute editing in a 3D space, and the function of submitting the shape file to the Integration Map of Underground Goespatial Information mobile center was defined and developed as a program. In addition, for the on-site application test of the development program, scenarios used at the underground facility real-time survey site and GPR exploration site were derived, and four sites in Seoul were tested to confirm that the use scenario worked properly. Through this, the on-site utilization of the program developed in this study could be confirmed, and it would contribute to the confirmation of the quality of Shape-file and the "update automation" of "Integration Map of Underground Goespatial Information". In addition, it is expected that the development program will be further applied to the Underground Facility Map's Accuracy Improvement Diffusion Project' promoted by the MOLIT (Ministry of Land, Infrastructure, and Transport).

A Study on improvement of traffic accident safety index for Uljugun, Ulsan (교통사고 안전지수 등급 향상방안 연구_울산광역시 울주군 중심으로)

  • Kim, Yong Moon;Kang, Seong Kyung;Lee, Young Jai
    • Journal of Korean Society of Disaster and Security
    • /
    • v.10 no.2
    • /
    • pp.7-19
    • /
    • 2017
  • Recently, the incidence of disasters and safety incidents is increasing rapidly, and the interest and demands of the people are increasing. In particular, traffic accidents in Korea are decreasing due to the continuous efforts of the government and the local governments, but still higher than the OECD average. In response to such demands of the times, the 'Regional Safety Index', a numerical value that quantifies the level of safety of each local government, is being publicized every year to awaken public awareness. The Regional Safety Index covers seven categories of accidents (traffic accidents, crimes, suicide, infectious diseases, fire, safety accidents, and natural disasters) in local governments. But, this study focuses on the traffic accident area and analyzed. The target local government is Ulju county of Ulsan Metropolitan City. Based on the traffic accident statistical data of Ulju county, the analysis of the traffic accidents and vulnerable points were analyzed. Among them, 3 key improvement districts were selected and 15 vulnerable branches were selected for each key improvement district. Next, we prepared measures for improvement of each accident vulnerable site through analysis of geographic information through traffic data related to traffic accidents and interview with related organizations. In addition, the improvement measures are divided into the structural infrastructure improvement, the institutional improvement, and the traffic safety culture movement from the viewpoint of traffic accident prevention. Finally, the implications of this study are to clarify the duties and roles of the relevant departments in the municipality, based on the implementation schedule of the improvement projects for the prevention of traffic accidents and the budget plan. In addition, it is very important that the participating agencies involved in traffic accidents and the private sector participate in the project.

Improvement Strategy & Current Bidding Situation on Apartment Management of Landscape Architecture (공동주택 조경관리 입찰 실태와 개선방안)

  • Hong, Jong-Hyun;Park, Hyun-Bin;Yoon, Jong-Myeone;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.48 no.4
    • /
    • pp.41-54
    • /
    • 2020
  • This study was conducted to provide basic data for a transparent and fair bidding system by identifying problems and suggesting improvement measures through an analysis of the bidding status for construction projects and service-related landscaping of multi-family housing. To this end, we used the data from the "Multi-Family Housing Management Information System (K-apt)" that provides the history of apartment maintenance, bidding information, and the electronic bidding system to examine the winning bid status and amount, along with the size and trends of the winning bids by year, and the results of the selection of operators by construction type. As a result, it was found that out of the total number of successful bids (36,831), 4.4% (16,631) were in the landscaping business, and the average winning bid value was found to be about 24 million won. According to the data, 73% of the landscaping cases were valued between 3 million won and 30 million won, and 58.6% of the cases were in the field of "pest prevention and maintenance". 36% of the total number of bids were awarded from February to April, with "general competitive bidding" accounting for 59.8% of the bidding methods. As for the method of selecting the winning bidder, 55% adopted the "lowest bid" and "electronic bidding method," and 45% adopted the "qualification screening system" and "direct bidding method." As an improvement to the problems derived from the bidding status data, the following are recommended: First, the exception clause to the current 'electronic bidding method' application regulations must be minimized to activate the electronic bidding method so that a fair bidding system can be operated. Second, landscaping management standards for green area environmental quality of multi-family housing must be prepared. Third, the provisions for preparing design books, such as detailed statements and drawings before the bidding announcement, and calculating the basic amount shall be prepared so that fair bidding can be made by specifying the details of the project concretely and objectively must be made. Fourth, for various bidding conditions in the 'business operator selection guidelines', detailed guidelines for each condition, not the selection, need to be prepared to maintain fairness and consistency. These measures are believed to beuseful in the fair selection of landscaping operators for multi-family housing projects and to prepare objective and reasonable standards for the maintenance of landscaping facilities and a green environment.

A Study on the Current Status and Future Prospection of the Electronic Payment Infrastructure -Focusing on the e-L/C and SWIFT TSU- (전자결제 인프라 현황과 향후 전망 -전자신용장과 SWIFT TSU를 중심으로-)

  • Kim, Tae-Hwan
    • International Commerce and Information Review
    • /
    • v.14 no.3
    • /
    • pp.585-610
    • /
    • 2012
  • There have been various attempt to offer commercial service of electronic payment. Actually, however, there has been few electronic payment model that are being used commercial service. Among them, it is estimated that only TSU(Trade Service Utility) of SWIFT will be succeed in providing commercial service possibility. In Korea e-L/C Distribution & Management System was constructed and become the first e-L/C service on a global basis via e-Trade Facilitation 3 Years Project and then started offering the world first e-L/C service. Some scholars have insisted the opinion that SWIFT L/C means e-L/C, but such opinion may be wrong because SWIFT L/C means the L/C advised by SWIFT(Society for Worldwid Interbank Financial Telecommunication) under the condition that a series of procedure from the issuance of L/C to the advice is done by SWIFT system. Because perfect e-L/C should be organically connected by SWIFT network and also, the e-L/C business between overseas banks and their customers should be organically linked with each other. The purpose of this paper is contribute to the commercialization of e-L/C distribution system by studying the current status of infrastructure concerned with domestic and overseas electronic payment and future e-payment infrastructure, seeking to be introduced internationally by doing things.

  • PDF

A Study on the Knowledge Base Construction of Expert System for S/W Project Management (소프트웨어 사업관리 지원용 전문가시스템의 지식베이스 구축에 관한 연구)

  • 김화수;최병권
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2000.11a
    • /
    • pp.397-406
    • /
    • 2000
  • 대부분의 국방정보시스템의 소프트웨어는 높은 가용성, 신뢰성, 신속성, 정확성 등을 요구하는 대규모이면서 복잡한 실시간 시스템이다. 이러한 국방정보시스템의 소프트웨어 개발사업에 있어서 저비용 고효율의 미개국방경영 건설을 위하고 강한 전투력을 육성하기 위해서는 국방정보시스템의 효율적인 소프트웨어 개발사법이 요구된다. 따라서, 국방정보시스템의 소프트웨어 사업관리자가 개발사업을 관리하고 감독하는데 있어서 개발자와 사용자간의 조정 및 통제 기능을 수행하고 해당 국방정보시스템의 특성을 파악하여 성공적인 사업수행을 할 수 있도록 기술적인 사업관리 측면에서 구체적이고 상세화된 방안/지침을 제공하기 위한 전문가시스템의 지식베이스 도메인 지식개발에 관한 연구이다. 기존의 국방정보시스템의 사업관리자가 경험을 동해 축적해 온 기술, 정책, 아이디어, 노하우 등에 대한 지식을 습득하고 사업 관련자료에서 제시한 소프트웨어 생명주기 단계별 방안이나 지침 등을 바탕으로 하여 식별된 사실이나 내용을 지식베이스로 구축하여 국방정보시스템의 사업관리자가 필요로 할 때 설명모듈을 거쳐 임무 및 세부활동사항을 게시하여 줌으로써 사업관리 경험이 부족하거나 사업관리자가 교체되었을 때 사업관리자들이 업무를 지속적으로 연계시켜 임무수행이 가능하도록 기초/기반 여건을 제공하고자 한다. 본 논문은 국방정보시스템의 소프트웨어 개발사업에서 소프트웨어 생명주기 단계별 사업관리자의 임무 및 세부활동사항 지원용 전문가시스템을 개발할 때 이용할 수 있도록 도메인 지식을 개발하는 것이며 논문의 결과를 활용시 기대되는 효과는 본문을 참고 바란다.의 장점을 취합하여 설계되었다. 본 시스템은 기존의 UN/EDIFACT표준을 사용하고 있는 EDI환경과 기존 VAN 방식의 EDI 중계 시스템과 연동되며, 향후 관세청의 XML/EDI 표준 시행을 미리 대비하는 선도연구로서 자리매김이 된다. 본 연구에서는 개발된 XML/EDI 통관시스템은 향후, 서비스의 최대 걸림돌이 되어왔던 값비싼 EDI 사용료의 부담에서 벗어날 수 있게 할 것이며, 저렴한 EDI구축/운영 비용으로 전자문서교환의 활성화와 XML이 인터넷 기반의 문서유통 표준으로 자리매김할 수 있는 중요한 계기가 될 것이다.재무/비재무적 지표를 고려한 인공신경망기법의 예측적중률이 높은 것으로 나타났다. 즉, 로지스틱회귀 분석의 재무적 지표모형은 훈련, 시험용이 84.45%, 85.10%인 반면, 재무/비재무적 지표모형은 84.45%, 85.08%로서 거의 동일한 예측적중률을 가졌으나 인공신경망기법 분석에서는 재무적 지표모형이 92.23%, 85.10%인 반면, 재무/비재무적 지표모형에서는 91.12%, 88.06%로서 향상된 예측적중률을 나타내었다.ting LMS according to increasing the step-size parameter $\mu$ in the experimentally computed. learning curve. Also we find that convergence speed of proposed algorithm is increased by (B+1) time proportional to B which B is

  • PDF

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.

A Study on the Consciousness Survey for the Establishment of Safety Village in Disaster (재난안전마을 구축을 위한 의식조사 연구)

  • Koo, Wonhoi;Baek, Minho
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.3
    • /
    • pp.238-246
    • /
    • 2018
  • Purpose: The purpose of this study is to examine the directions for establishing a disaster safety village in rural areas where damage from a similar type of disaster occurs repeatedly by conducting the consciousness survey targeting at experts and disaster safety officials in a local government. Method: The risks of disaster in rural areas were examined and the concept and characteristics of disaster safety village which is a measure on the basis of Myeon (township) among the measures of village unit were examined in order to carry out this study. In addition, opinion polling targeting at officials-in-charge in the local government and survey targeting at experts in disaster safety and building village were conducted. Based on the findings, the directions for establishing a disaster safety village that fitted the characteristics of rural areas were examined. Result: The officials-in-charge in the local government answered that rural areas have a high risk of storm and flood such as heavy snowing, typhoon, drought, and heavy rain as well as forest fire, and it is difficult to draw voluntary participation of farmers for disaster management activities due to their main duties. They also replied that active support and participation of residents in rural areas are necessary for future improvement measures. The experts mostly replied that the problem of disaster safety village project is a temporary project which has low sustainability, and the lack of connections between the central government, local governments and residents was stressed out as the difficulties. They said that measures to secure the budget and the directions of project promotion system should be promoted by the central government, local governments and residents together. Conclusion: The results of this study are as follows. First, a disaster safety village should be established in consideration of the disaster types and characteristics. Second, measures to secure the budget for utilizing the central government fund as well as local government fund and village development fund should be prepared when establishing and operating a disaster safety village in rural areas. Third, measures to utilize a disaster safety village in rural areas for a long period of time such as the re-authorization system should be prepared in order to continuously operate and manage such villages after its establishment. Fourth, detailed measures that allow residents of rural areas to positively participate in the activities for establishing a disaster safety village in rural areas should be prepared.

Evaluation of Green House Gases (GHGs) Reduction Plan in Combination with Air Pollutants Reduction in Busan Metropolitan City in Korea

  • Cheong, Jang-Pyo;Kim, Chul-Han;Chang, Jae-Soo
    • Asian Journal of Atmospheric Environment
    • /
    • v.5 no.4
    • /
    • pp.228-236
    • /
    • 2011
  • Since most Green House Gases (GHGs) and air pollutants are generated from the same sources, it will be cost-effective to develop a GHGs reduction plan in combination with simultaneous removal of air pollutants. However, effects on air pollutants reduction according to implementing any GHG abatement plans have been rarely studied. Reflecting simultaneous removal of air pollutants along with the GHGs emission reduction, this study investigated relative cost effectiveness among GHGs reduction action plans in Busan Metropolitan City. We employed the Data Envelopment Analysis (DEA), a methodology that evaluates relative efficiency of decision-making units (DMUs) producing multiple outputs with multiple inputs, for the investigation. Assigning each GHGs reduction action plan to a DMU, implementation cost of each GHGs reduction action plan to an input, and reduction potential of GHGs and air pollutants by each GHGs reduction action plan to an output, we calculated efficiency scores for each GHGs reduction action plan. When the simultaneous removal of air pollutants with the GHGs reduction were considered, green house supply-insulation improvement and intelligent transportation system (ITS) projects had high efficiency scores for cost-positive action plans. For cost-negative action plans, green start network formation and running, and daily car use control program had high efficiency scores. When only the GHGs reduction was considered, project priority orders based on efficiency scores were somewhat different from those when both the removal of air pollutants and GHGs reduction were considered at the same time. The expected action plan priority difference is attributed to great difference of air pollutants reduction potential according to types of energy sources to be reduced.

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

A Study on Placement of Point Detectors Based on Homogeneous Section for Travel Time Estimation in National Highway (일반국도 통행시간 추정을 위한 동질구간 기반 지점검지기 배치에 관한 연구)

  • Kim, Seong-Hyeon;Im, Gang-Won;Lee, Yeong-In
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.1 s.87
    • /
    • pp.73-84
    • /
    • 2006
  • This study was carried out to set up the logic to determine lengths of the homogeneous sections effectively in order to provide dynamic travel time on real time base for the application of the model. First, considering real time traffic pattern fluctuation, lengths of the homogeneous sections for each time period and the final homogeneous sections were determined. In order to determine lengths of the homogeneous sections according to traffic condition, the cluster analysis was used based on real time data. In order to verify the homogeneous section the case with detectors in all links and the case with detectors in homogeneous section for each time period are used. As the results of verification, each cases showed similar estimation results. The results of this study are expected to be used for National Highway traffic management and the system to Provide a traffic information in the future. According to this study, when the homogeneous section decision model are used to the ITS project for National Highway, operation cost is expected to be cut by effectively establishing point detectors.