• Title/Summary/Keyword: project evaluation

Search Result 2,349, Processing Time 0.022 seconds

The Development and Application of the Indices of Evaluation for the Cultural Tourism Development Project Using AHP -focusing on Cultural and Ecological Tourism Infrastructure Project in Three Cultural Areas of Andong City- (AHP를 활용한 문화관광개발 사업의 평가지표 개발 및 적용 -안동시 3대 문화권 문화·생태 관광 기반조성 사업을 중심으로-)

  • Kwon, Gi-Chang
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.4
    • /
    • pp.399-407
    • /
    • 2016
  • This study is about setting the weighed value of evaluation items for cultural tourism development project using AHP and it analyzed the cultural and ecological tourism infrastructure project in three cultural areas of Andong City. As a result of examining the reliability of evaluation items, it turned out to be 0.9, an appropriate level. In the analysis of weighed value, the items valued highly were in the order of validity of the plan, economic validity, validity of the policy. As for the detailed indices for the three that showed the highest weighed value, for validity of the plan, distinction of contents; for validity of the policy, compatibility of regional characteristics; for economic validity, sustainability were given high values. In the end, it could be concluded that as the cultural and ecological tourism infrastructure project in three cultural areas was delayed a lot more than previously planned, in order to flexibly respond to changing environment, it would be desirable to change parts of the previous plan before pushing ahead with it.

A Freedom Inquiry Method by Revised Science Curriculum in 2007 (2007년 개정 과학과 교육과정에서 자유탐구 방안)

  • Lee, Yong-Seob;Park, Mi-Jin
    • Journal of the Korean Society of Earth Science Education
    • /
    • v.3 no.1
    • /
    • pp.65-75
    • /
    • 2010
  • The purpose of this study is to present a Freedom Inquiry Method by Revised Science Curriculum in 2007. This study introduced IIM(Independent Inquiry Method), PBL(Problem Based Learning), Small Inquiry Method, Science Notebooks, Project Learning Method about Freedom Inquiry Method. The results of this study are as follows: First, IIM(Independent Inquiry Method) is studying method in the inquiry process center. The inquiry process is composed of total 9 phases, inquiry subject really it is, detailed aim deciding, information searching, it searches, quest result it arranges, aim evaluation, the report making, it announces, it evaluates, it is become accomplished. Second, It is a studying method which it starts with the problem which is Problem Based Learning, study atmosphere creation phase, problematic presentation phase and sleep static problem solving the phase which it attempts, it is become accomplished with autonomous studying phase, coordinated studying and discussion studying phase, discussion resultant announcement studying phase, arrangement and evaluation. Third, Small Inquiry Method, Call it accomplishes the call grade of the students among ourselves 4~8 people degree where only the quest learning capability is similar within class. Also interaction and coordinated function of the members between it leads and the subject which is given in the group it cooperates and it solves with it is a quest method which arrives to aim of commonness. This method divides on a large scale in three parts, it becomes accomplished in programming phase, quest accomplishment and resultant announcement. Fourth, Science Notebooks learns a scientific contents and a scientific quest function and the possibility of decreasing in order to be, from the fact that the help which it understands. This planing, data searching, it searches, becomes accomplished with resultant arrangement, announcement and evaluation. Fifth, The Project Learning Method the studying person oneself studying contents, it establishes a plan and it collects it accomplishes process of etc. it evaluates it leads and a subject and information and with real life it is a method which it studies naturally from the learning environment inside which is similar. This is preliminary phase, project start, project activity and project arrangement.

  • PDF

An Analysis of the Urban Regeneration Priority Regions Project Using Quantitative Evaluation Indicators - In Case study of Cheonan Priority Regions - (정량적 평가지표를 활용한 도시재생 선도지역 사업효과 분석 - 천안시 선도지역을 사례로 -)

  • Lyu, Shin-Hyun;Lim, Nam-Gi
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.10
    • /
    • pp.83-90
    • /
    • 2019
  • The purpose of the present study is to confirm, through quantitative indices, changes arising with the implementation of urban regeneration projects, with a specific focus on the case of Dongnam-gu, Cheonan, one of the 13 priority rgions in urban regeneration. By utilizing quantitative data including resident population, floating population, revenue, number of small business persons, number of startup companies, and number of licensed buildings, the study confirmed changes in Dongnam-gu and other urban regeneration areas. The study compared monitoring results and implemented project policies to confirm changes within the area as a result of project implementation. Additionally, resident perception toward business districts was surveyed to confirm changes in perception and opinion, and monitoring indices were used to confirm changes as a result of project implementation. Accordingly, the study presented a plan to carry out the assessment of urban regeneration projects, which can be employed as data for conducting future urban regeneration projects. Urban regeneration projects are carried out for the long-term. Therefore, based on monitoring and investigative data, they require constant policy suggestions and periodic monitoring in accordance with changes resulting from project implementation. With regards to the effective range of urban regeneration projects, the study confirmed the possibility of an effect not only in the area of project implementation but also in surrounding areas. However, because the study merely confirms changes in Dongnam-gu, Cheonan, additional research is necessary to ascertain assessment plans suitable to the different types and regional characteristics of urban regeneration projects.

The Development and Application of Integrating Instruction with Evaluation Materials for Strengthening of Independent Living Competence: Focused on Technology and Home Economics Education (기술·가정과 생활자립역량 함양을 위한 교수학습-평가 연계 자료 개발 및 적용)

  • Lim, Yun Jin;Kim, Eun Jeung
    • Journal of Korean Home Economics Education Association
    • /
    • v.31 no.3
    • /
    • pp.23-39
    • /
    • 2019
  • The purpose of the study was to analyze the home economics education experts' and teachers' perception of ways to align instruction with evaluation, based on the 2015 revised technology and home economics curriculum for the purpose of developing the independent living competencies, and to provide examples of alignment in practice. The analysis is based on the data from a Delphi study (10 experts) and a survey of technology and home economics teachers(n=422). The results of survey indicated that experts and teachers perceived the instruction-assessment alignment to be most appropriate for project learning-project assessment, followed by project learning-portfolio assessment, problem solving learning-portfolio assessment, and problem solving learning-project assessment, in order. Based on the survey results, a model of instruction-assessment alignment and a teaching-learing plan were presented, based on 'Development task of life cycle and Life plan' unit. This was considered to be a proper method of instructional alignment for the purpose of developing 'independent living competence' with project-learning/project-assessment. The model focuses on consistency between instruction and evaluation, unity in methods, and the availablility of feedbacks of assessment for the improvement of independent living competencies. In conclusion, this study contributes as foundational information for teaching and learning-assessment alignment. Diverse methods of instruction-evaluation alignment is expected for future research.

A Study on Road Safety Evaluation Method for Improvement Project of Two-Lane Road (2차로 시설개량 사업의 도로 안전성 평가방법 연구)

  • Shin, Chul-Ho;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.1
    • /
    • pp.105-114
    • /
    • 2019
  • Recently, the paradigm of road policy has been focused on user safety. Recently, the number of road facility improvement project has been continuously increased but the economic feasibility (B/C ratio) is insufficient. Therefore, it is necessary to select a reasonable road improvement project through accurate and objective analysis of the road safety evaluation. In this study, to develop a new road safety evaluation method, data were collected based on the current road safety evaluation method for 75 routes including national roads and provincial ones. Based on the collected data, problems were analyzed and utilized as the basic factors of the new road safety evaluation method. Therefore, in this study, traffic accidents were reflected as a general evaluation item by weighing to solve these problems, and the evaluation items were added from experiences and ideas of the local public officials. For each evaluation item, a reasonable weight was determined through AHP (Analytic Hierarchy Process) questionnaire evaluation with highway experts. In addition, the safety index was determined based on the evaluation criteria for each evaluation item. The criteria for evaluating the danger zone are determined by the overall safety index. Finally, the criteria for selection of road improvement projects based on the overall risk level were derived.

Development of the Qualitative Model for Post Construction Evaluation (건설공사 사후평가의 정성평가 모델 개발)

  • Lee, Kyu-Sun;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.5
    • /
    • pp.733-739
    • /
    • 2018
  • Various public construction projects have been performed for public welfare and appropriate evaluation of the effectiveness and efficiency has been required. In accordance with legislation of a post construction project evaluation in Construction Technology Promotion Act, all construction projects that exceed 30 billion won in budget are required to perform post evaluation. Korean Government provides post construction evaluation manual that includes both quantitative and qualitative criteria. However, it only provides general concepts and procedures not but detail guidelines for different construction project types and characteristics. Therefore, this paper developed a standard format for qualitative evaluation using survey through analyzing previous cases and research. As a result, the developed standard for survey can be applied for most civil and architectural facilities. However, it will need further research regarding establishment of detailed evaluation criteria for each type of facilities and data storage system for feedback.

A Quantitative Evaluation of Composite Indicators : Empirical Analysis of Comprehensive Rural Village Development Project (비명시적 평가지표를 활용한 농촌정책 평가)

  • Hwang, Jae-Hee;Lee, Seong-Woo
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.4
    • /
    • pp.25-36
    • /
    • 2016
  • The purpose of this study is to construct a quantitative evaluation method that can analyze the policy effectiveness with the construction of a implicit composite index incorporating spatial econometrics models. In order to propose a methodological framework for the program evaluation, this study conducts an empirical analysis with the application of the Comprehensive Rural Village Development Project (CRVDP) which explicitly claims to achieve comprehensive goal of community development. The present study pays particular attention to quantifying the composite evaluation index and drawing net effect through the application of a series of spatial econometrics models. The spatial unit of the analysis is drawn at Eup-Myeon level in rural areas in Korea, and the time horizon is in between 2005 and 2010. We utilize the Korean Agricultural Census data in 2005 and 2010. Three steps of methodological processes are needed to satisfy the objective of the present study. First, we apply factor analysis to construct the composite index that represents comprehensive settlement environment in rural area. The index should be matched with the main objective of the CRVDP. Second, we apply the derived index to a series of spatial econometrics model as dependent variable. Lastly, utilizing the estimated coefficients of the econometrics models, we apply decomposition technique to estimate CRVDP's net effect from both cross-sectional and longitudinal perspectives. We find that the results of the decomposition analysis by the execution of the CRVDP are positively associated with the explicit object of the project.

HABs Research Project Management Model (적조연구프로젝트 관리모형에 관한 연구)

  • 어윤양;김창완;이현규
    • The Journal of Fisheries Business Administration
    • /
    • v.34 no.2
    • /
    • pp.165-183
    • /
    • 2003
  • The effect of red tide on the marine ecological system is so severe that many researches on the diverse subjects related to it have been conducted. Notwithstanding the enormous efforts and inputs the results of the past researches show no clear ways to deal with the HAB problems. As many researches are being conducted, the efficient and appropriate research project management systems as one of the critical factors for successful research are also needed as well as the fund and the capabilities of the researchers. It is assumed that the development of the evaluation and management systems for red tide research projects is so important and critical to enhance the researches and to utilize efficiently the physical and human resources for research. In this respect this study aims to present the evaluation and management scheme for the red tide researches that can not only decide the priority of the research subjects and tell the desirable research directions, but also support to develop the useful managerial policies and guidelines for the policy maker. The main subjects dealt with in this study are as follows : the characteristics of the HAB researches, the basic attributes and criterion of the research evaluation systems, the structure and design of the evaluation systems, and the development of the managerial policies by the type of the evaluation system. The conceptual scheme developed in this study is expected to be applied to the related areas and can suggest to the policy makers so many implications for identifying and setting the proper policy objects and management techniques. This study has a couple of weak points. It suggests only the conceptual scheme but not the applications so that the researches focusing on the applications in practical perspectives are needed to follow.

  • PDF

Qualitative Analysis of IT fused Mentorship Project Performance with Gifted Secondary Students in Information Science Class (정보 영재반 중학생들의 IT 융합 사사 프로젝트 수행에 관한 질적 분석)

  • Jun, Youngcook
    • The Journal of Korean Association of Computer Education
    • /
    • v.19 no.4
    • /
    • pp.45-58
    • /
    • 2016
  • This paper tried to analyze cases of one year team-based project of gifted students who spent two year programs in a math-IT integrated class as part of formative evaluation and extracted the factors associated with future enhancement for the program. The researcher as an advisory professor tried to guide the students as minimally as possible considering their levels of IT skills so that they could self-directedly perform the IT-fused project on a team basis. The data collection included documents, annual report, photos, video, artifacts and interview data with the students for the whole team project carried out between February and December, 2015. The overall pattern of the project activities has been stabilized in the middle of the course compared to the initial stages of brainstorming and design work even though the students revealed the differences of their programming skills and preferences toward the project theme. Their project outcomes were qualitatively analyzed according to the 9 steps of R&E model and has shown individual differences according to low, middle and high level. At the end, the analysis suggested several implications for further improvement of the mentorship program.

The Residents' Perceptions on the Revitalization Project of Rural Centers Utilizing IPA - The Case of Janggye-myeon of Jangsu-gun - (IPA를 활용한 농촌중심지 활성화 사업에 대한 거주민 인식 - 장수군 장계면을 중심으로 -)

  • Kim, Young-Jin;Son, Yong-hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.3
    • /
    • pp.133-145
    • /
    • 2017
  • The purpose of this study is to assess residents' perception of the revitalization projects of the rural center and to evaluate their views of the projects' importance and their levels of satisfaction with how they have been carried out. In this study, we measured the residents' perceptions and preferences regarding these projects by using Importance-Performance Analysis (IPA). Results showed that residents' perceptions and satisfaction were the highest for the projects providing welfare facilities, even though this project has little relevance to the overall project goal. Residents were dissatisfied with construction projects such as the building of cultural facilities and urban parks, even while recognizing their importance. It is necessary to establish what problem the people perceive and to manage them appropriately. Next, the residents did not appreciate the community empowerment projects, nor did they evaluate the contents of the program positively. It can therefore be seen that the community empowerment projects have not been carried out well. Finally, the street landscape improvement project was not successfully implemented compared to other projects. The residents have negatively perceived the installation of facilities that they do not want, rarely use, or are poorly operated. this shows that the evaluation of residents is significant. They become the users of the revitalization project for the rural center. It is necessary to overcome problems such as project items chosen by professionals without local consultation and obvious design in the revitalization project of the local center. There is a need to ascertain the residents' opinion of each project and to encourage them to participate directly in the management operation.