• Title/Summary/Keyword: project evaluation

Search Result 2,386, Processing Time 0.028 seconds

A Study on the Deterministic Evaluation Method of R&D Project in Food Industry (식품산업 연구개발의 결정론적 평가방법에 관한 연구)

  • 이종만;이근희
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.14 no.23
    • /
    • pp.57-64
    • /
    • 1991
  • The preliminary, advanced and final evaluation of R&D project is essential in order to reduce loss of resource and opportunity and to minimize uncertainty resulting from optimal selection and efficient progress of R&D project. This thesis examined characteristics of deterministic evaluation, economical evaluation, and OR-approach evaluation as theoretical methodology of evaluation of R&D project applicable to food industry in Korea by using scoring method, one of deterministic evaluations. In addition, this thesis divided the evaluation factors for preliminary evaluation of R&D project into 5 groups and 30 factors on basis of the environment of domestic companies and set up the standard of each evaluation factors and contains marking-selecting way. But, generally, the evaluation model by this thesis, as the conditions of the business company environment are different to each other, contents to be set up evaluation factors, evaluation standard and decision method conforming to each the environment of the business companies with referring to as one standard of evaluation project for selecting R&D project.

  • PDF

Evaluation System for Defense IT Project in Korea: Post-Implementation Stage

  • Lee, Sangho;Song, Chong-Hyun
    • Journal of Multimedia Information System
    • /
    • v.5 no.4
    • /
    • pp.291-297
    • /
    • 2018
  • Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.

A Study on the Project Manager's Reaction to R&D Evaluation and Its Influencing Factors (연구과제 평가에 대한 과제책임자의 반응과 그 영향요인에 관한 연구)

  • 김인철;한도희
    • Journal of Korea Technology Innovation Society
    • /
    • v.3 no.2
    • /
    • pp.48-60
    • /
    • 2000
  • An effort has been made in this paper to measure the project manager's reaction to R&D project evaluation and present the useful information related to rebuilding an R&D evaluation system. Results of this study show that project manager's reaction is related to the selection of reasonable items for evaluation, the rater's expertise, the project manager's participation in evaluation process and so on. Accordingly, managers of the research institute have to set up the evaluation system after deeply considering these results.

  • PDF

An Evaluative Study of Community based Health Promotion Project (지역사회 건강 증진 사업 평가 연구 -1개 도시지역 보건소의 경험적 사례를 중심으로-)

  • Park, Sung-Ae;Park, Jung-Ho;Yun, Soon-Nyung;Lee, In-Sook
    • Research in Community and Public Health Nursing
    • /
    • v.12 no.2
    • /
    • pp.532-546
    • /
    • 2001
  • This report is the result of interim evaluation of a health promotion project which was operated by a public health center of K Gu in the year of 2000. It evaluated the aspects of the aim of a project, a target group. and adequacy and appropriateness of a approaching strategy by considering data of public health center's self-evaluation, and guidelines of a group assigned to evaluate the project. The way of evaluation was dividing the project into a colligated evaluation and a evaluation by projects in the aspects of the structure, the procedure. and the result of a result. Through this. a device to improve the health improvement project was derived. The target data for evaluation was the second data and data of self-evaluation, reported data, membership register data of a health management. and interview materials with the people in charge by projects that are all collected as a project management documents. The result of evaluation is stated below. 1. Main purpose of a health promotion project is building a environment of healthy life practicing and providing information through various ways to increase the rate of practicing healthy life. Through overall project. the ultimate purpose and definite purpose were same, however, it was not quite satisfied to offer planning of a time, and a target amount in detailed strategy. As the purpose was to build environment of healthy life practicing. most of the projects had the whole community citizen as a target group. That made difficult to operate detailed projects. so the result was hard to estimate as much as the effort put into it. Also, there were too many kinds of projects and target groups to be equal to by the human source of a health promotion project team. so we were just bent on operating a project. and could not prepare for the evaluation. As the most of former evaluation of public health service was just counting number of the objects, the new way of evaluating a project wasn't familiar to us. so the evaluation of a detailed project cannot be done well. Techniques and advices needed for all of these things weren't offered appropriately. For the forward direction of unfolding project. it is desirable to operate project by selecting focused target and considering a strategy of evaluation as a strategy of reasonable spread. The evaluation of the project became difficult as participation of citizen for it was poor. So, approach strategy that can lead the motivation of community citizen should be derived. 2. For the continuation of a health promotion project, technical assistance system. description of a field in charge, and arrangement of the amount of task should be developed as a central level. Furthermore, as the health promotion project focus on behavioral modification program whose purpose is to lessen dangerous factors. the public health service model which is incorporated with former project should be developed and spread out in the field for the object-centered project plan.

  • PDF

GIS for Agricultural Project and Program Evaluation

  • Punyaratabandhu, Sompit
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.38-40
    • /
    • 2003
  • Project monitoring and evaluation is very important, as it can be used to indicate progress and success, including problems and impact of the project. It can also be used for improving project plan, administration, and management. GIS is the visualization method that is extremely helpful in decision making and planning. So GIS is an appropriate tool for agricultural project and program monitoring and evaluation. There are three ways of using GIS in project undertakings i.e. GIS for feasibility studies, GIS for project and program monitoring, and GIS for project and program evaluation.

  • PDF

Characteristics and Utilization of Peer-evaluation and Self-evaluation of Team Activities in University Project Based Classes (대학의 프로젝트기반 수업에서 팀 활동에 대한 동료평가와 자기평가의 특성 및 활용방안)

  • Cho, Soosun
    • Journal of Engineering Education Research
    • /
    • v.25 no.1
    • /
    • pp.55-64
    • /
    • 2022
  • In this paper, the characteristics of peer-evaluation and self-evaluation of team activity participation in project-based learning and their usability were investigated. The characteristics of peer-evaluation and self-evaluation are as follows. First, in peer-evaluation and self-evaluation of project-based learning, the correlation between the two evaluation scores was very high. When students' scores from their peers correlate very well with the scores they give themselves, it means that they apply the same criteria to their peers and to themselves when evaluating team activity. Second, there was no difference in peer-evaluation and self-evaluation scores between groups with different written test scores. The fact that peer-evaluation and self-evaluation scores do not change according to academic ability shows that the two evaluation areas are independent. Third, the self-evaluation score in project-based learning is statistically significantly higher than the score received from peers. This raises doubts about the fairness of self-evaluation. Therefore, in this paper, it is suggested that self-evaluation of team activities in project-based learning is carried out together with peer-evaluation, but only peer-evaluation is reflected in credits.

A Study on Advanced Analysis of Construction Project Performance Evaluation (건설사업 수행성과평가에 대한 분석 고도화 연구)

  • Kim, Kyong hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

An Study on Project Selection based on Analytic Hierarchy Process (AHP를 이용한 프로젝트 선정에 관한 실증적 연구)

  • Kim, Joo-Wan;Lee, Wook-Gee;Kim, Pan-Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.2
    • /
    • pp.195-214
    • /
    • 2007
  • The purpose of this study is to explore the applicability of AHP(Analytic Hierarchy Process) to select more productive projects among various proposed projects in a particular company. To achieve this research objective, the characteristics of project evaluation and selection are first reviewed with respect to when, where, and how the decision is made. Then the theoretical basis of the AHP is briefly reviewed along with its mathematical underpinnings to construct the framework of project evaluation and selection. To be more specific, the evaluation and selection criteria were reorganized in the AHP-based framework to make the process of project evaluation and selection more productive. Project evaluation and selection is one of the most important activities for the most companies to be more advantageous in the market. Despite the importance of decision making process of project selection, not many of how to choose the best project were suggested as the reliable project selection methods in the industries. It may be because it involves various activities related to conflict resolution among different evaluation criteria, high uncertainties of market, and the unclear tradeoff among various project objectives. Furthermore, the decision, once made at this point, tends to be irrevocable until the whole process turns out to be a complete success or failure. As the result, the AHP method showed better financial performance rather than the traditional method in a case study.

A Case Study on Efficiency Evaluation of DMUs Performances for Digital Pioneer Project by Data Envelopment Analysis Model (DEA를 활용한 차세대첨단콘텐츠육성사업 참여 DMU의 효율성 평가에 관한 사례 연구)

  • Shin, Jae-Shig;Yang, Hae-Sool
    • Journal of Information Technology Services
    • /
    • v.6 no.1
    • /
    • pp.65-81
    • /
    • 2007
  • Recently, the affiliates of the Ministry of Information and Communication have been conducting a performance evaluation study on IT policy projects, based on the performance evaluation model of the U.S. Office of Management and Budgets, with regard to investment in computerization. The performance evaluation model for the policy project could provide the objective information required for the planning, development, and operation of the policy project. However, the performance of the most policy project is likely to be evaluated using the subjective evaluation criteria of evaluators. Therefore, this case study evaluates the relative efficiency using DEA (Data Envelopment Analysis) in order to improve the performance evaluation method of the digital pioneer' project implemented by the Korea IT Industry Promotion Agency. The improvement value of inefficient Decision Making Units (DMUs) was measured by a static efficiency analysis. The measured value will suggest a objective viewpoint of the performance between DMUs to evaluators. In doing so, it will show an appropriate direction for the policy project to be evaluated successfully.

A Study on Smart City Project Evaluation System: Focusing on Case Analysis of IFEZ Smart City (스마트시티 프로젝트 평가체계에 대한 연구: IFEZ 스마트시티 사례분석을 중심으로)

  • Sang-Ho Lee;Hee-Yeon Jo;Yun-Hong Min
    • The Journal of Bigdata
    • /
    • v.8 no.1
    • /
    • pp.83-97
    • /
    • 2023
  • Project evaluation is the process of evaluating the progress and results of a project. Smart city projects can be divided into system components (infrastructure, services, platforms), or projects can run simultaneously for multiple services. In addition, services are developed and expanded through additional projects. In order to ensure that the smart city, which is composed of various projects, proceeds in accordance with the goals and strategies, periodic project evaluation is required during the project implementation process. The smart city project evaluation system proposed in this paper is designed to provide comprehensive and objective indicators by reflecting various factors that must be considered for projects occurring in all stages of planning, design, construction, and operation of smart cities. The indicators derived from the evaluation system can be used by decision makers to determine the direction of smart city project development. In addition, it is designed so that the performance of the project can be evaluated interim before the end of the project and the feedback obtained from it can be reflected. To introduce the application method of the smart city project evaluation system proposed in this study, the evaluation system developed in this study was applied to the smart city project case of Incheon Free Economic Zone (IFEZ). Based on the evaluation results, items that can maximize the improvement effect of each smart city project item were presented, and the direction of smart city project implementation was suggested. By utilizing a smart city project evaluation system that reflects the characteristics of smart city projects that are composed of multiple projects, comprehensive planning and management of smart city projects will be possible, and this study will serve as a reference for identifying priority improvement factors for projects.