• Title/Summary/Keyword: project approach

Search Result 1,370, Processing Time 0.026 seconds

A Study of Priority Setting of Healthy City Project Indicators with the use of AHP Model (계층 분석적 의사결정 방법(AHP)에 의한 건강도시 사업 평가기준의 우선순위 결정에 관한 연구)

  • Park, Myung-Bae;Nam, Eun-Woo;Lee, Hae-Jong;Shin, Taek-Su
    • Korean Journal of Health Education and Promotion
    • /
    • v.25 no.3
    • /
    • pp.139-151
    • /
    • 2008
  • Objectives: Since 2000 interests in Healthy City Project has been growing fast in Korea. Amid this atmosphere, the need for establishing priorities when planning Healthy City Project and carrying forward the plan has arisen. Therefore, this study tries to conduct practical research on the manner of setting priorities of business valuation standard about Healthy City Project. Methods: The research was carried out with Healthy City experts and government official. And in this research the responses of 28 participants among 37 have been taken into consideration due to their consistent responses. Results: The results of Level 1 showed that the "social & environmental approach" accounted for more than the "individual approach". In the case of Level 2, fields resulted in order of "environment", "infrastructure", "behavior", "evaluation and reflection", "disease prevention and rehabilitation", and "setting approach". Conclusions: The findings derived from this study are first, it is feasible to suggest the ways of establishing priorities as to the evaluation standards for the Healthy City Project and second, the results present the ways to proceed in terms of what tasks should be done for the healthy City Project development.

MULTI-SCALE MODELING AND ANALYSIS OF CONVECTIVE BOILING: TOWARDS THE PREDICTION OF CHF IN ROD BUNDLES

  • Niceno, B.;Sato, Y.;Badillo, A.;Andreani, M.
    • Nuclear Engineering and Technology
    • /
    • v.42 no.6
    • /
    • pp.620-635
    • /
    • 2010
  • In this paper we describe current activities on the project Multi-Scale Modeling and Analysis of convective boiling (MSMA), conducted jointly by the Paul Scherrer Institute (PSI) and the Swiss Nuclear Utilities (Swissnuclear). The long-term aim of the MSMA project is to formulate improved closure laws for Computational Fluid Dynamics (CFD) simulations for prediction of convective boiling and eventually of the Critical Heat Flux (CHF). As boiling is controlled by the competition of numerous phenomena at various length and time scales, a multi-scale approach is employed to tackle the problem at different scales. In the MSMA project, the scales on which we focus range from the CFD scale (macro-scale), bubble size scale (meso-scale), liquid micro-layer and triple interline scale (micro-scale), and molecular scale (nano-scale). The current focus of the project is on micro- and meso-scales modeling. The numerical framework comprises a highly efficient, parallel DNS solver, the PSI-BOIL code. The code has incorporated an Immersed Boundary Method (IBM) to tackle complex geometries. For simulation of meso-scales (bubbles), we use the Constrained Interpolation Profile method: Conservative Semi-Lagrangian $2^{nd}$ order (CIP-CSL2). The phase change is described either by applying conventional jump conditions at the interface, or by using the Phase Field (PF) approach. In this work, we present selected results for flows in complex geometry using the IBM, selected bubbly flow simulations using the CIP-CSL2 method and results for phase change using the PF approach. In the subsequent stage of the project, the importance of effects of nano-scale processes on the global boiling heat transfer will be evaluated. To validate the models, more experimental information will be needed in the future, so it is expected that the MSMA project will become the seed for a long-term, combined theoretical and experimental program.

Decision Support System for Project Duration Estimation Model (프로젝트기간예측모델을 위한 의사결정지원시스템)

  • 조성빈
    • Journal of Intelligence and Information Systems
    • /
    • v.6 no.2
    • /
    • pp.91-98
    • /
    • 2000
  • Despite their wide application of some traditional project management techniques like the Program Evaluation and Review Technique, they lack of learning, one of important factors in many disciplines today, due to a static view for project progression. This study proposes a framework for estimation by loaming based on a Linear Bayesian approach. As a project Progresses, we sequentially observe the durations of completed activities. By reflecting this newly available information to update the distribution of remaining activity durations and thus project duration, we can implement a decision support system that updates e.g., the expected project completion time as well as the probabilities of completing the project within the due bate and by a certain date. By implementing such customized system, project manager can be aware of changing project status more effectively and better revise resource allocation plans.

  • PDF

Forecasting Project Cost and Time using Fuzzy Set Theory and Contractors' Judgment

  • Alshibani, Adel
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.174-178
    • /
    • 2015
  • This paper presents a new method for forecasting construction project cost and time at completion or at any intermediate time horizon of the project duration. The method is designed to overcome identified limitations of current applications of earned value method in forecasting project cost and time. The proposed method usesfuzzy set theory to model uncertainties associated with project performance and it integrates the earned value technique and the contractors' judgement. The fuzzy set theory is applied as an alternative approach to deterministic and probabilistic methods. Using fuzzy set theory allows contractors to: (1) perform risk analysis for different scenarios of project performance indices, and (2) perform different scenarios expressing vagueness and imprecision of forecasted project cost and time using a set of measures and indices. Unlike the current applications of Earned Value Method(EVM), The proposed method has a numberof interesting features: (1) integrating contractors' judgement in forecasting project performance; (2) enabling contractors to evaluate the risk associated with cost overrun in much simpler method comparing with that of simulation, and (3) accounting for uncertainties involved in the forecasting project cost.

  • PDF

QUANTITATIVE ANALYSIS ON PROJECT PERFORMANCE ANALYSIS AND DELIVERY METHODS

  • Seta Ohanesian;Jin-Lee Kim;Tang-Hung Nguyen;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.332-337
    • /
    • 2013
  • Various project delivery methods have been utilized by owners over the years to maximize project performance. The design-build delivery method is being increasingly used due to the advantages it can offer to an engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. This study represents comprehensive analysis of 40 projects from the construction industry and shows that design/build method may not provide all the benefits to project performance. This study found timesaving was a definitive advantage of design/build project delivery, but the positive effects of cost changes was not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

  • PDF

A Study on the Application System of the Systems Engineering for the Railway Total Safety Project (철도종합안전프로젝트를 위한 시스템엔지니어링 적용 체계 연구)

  • Choi Yo-Chul;Cho Yun-Ok
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.487-492
    • /
    • 2006
  • This paper presents the Case of Systems Engineering Application for the Railway Total-Safety Project. Key points to consider for project are: 1) Establish the SE Based-Project organization system, 2) Define the SE Activities, 3) Manage technically the SE Based-Project, etc. They were of much help that the Railway Total-Safety Project which were efficiently implemented and managed. As I take it, the Systems Engineering is very reasonable approach for the systematical and technical conduct of a project.

A Study on Results and Improvement Method of Advanced Rural Village Development Project (전원마을조성사업의 성과와 개선방안 연구)

  • Jeong, Jong-Sool;Kim, Kang-Sub;Kang, Byung-Hwan;Lee, Sang-Jung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.12 no.2
    • /
    • pp.125-133
    • /
    • 2010
  • The advanced rural village development project started in 2005, and this project of purpose is improvement of housing environment and promotion of region activation. Researcher investigated about the advanced rural village development project of nine complex through field survey. The aim of this study is to be offered data of idyllic housing policy by examination actual conditions of study subject. Based on this study, mainly three results can be drawn as follows ; first, this project makes a great contributed to flow in population from urban to activate rural areas. Second, the project success depends on improvement an institution and planed, timely approach. Third, central government must plan network system with rural development project in political, and must support local government into political frame. The local government must consider a regional housing plan overall and must make an effort itself for the project success.

Project Scheduling Technique for New Product Development (신제품 개발 프로젝트 일정관리기법)

  • Ahn Tae-Ho
    • Management & Information Systems Review
    • /
    • v.14
    • /
    • pp.67-77
    • /
    • 2004
  • Although project management for new product development is a very important issue, only a few approach from project scheduling has been made. The traditional project scheduling research has focused on the project network with certainty, but the new product development project has some uncertainties in network; Some activities may not need to be peformed, and/or some precedent relationships between activities may not need to be kept. In this paper, a simulation model is introduced in order to reflect uncertainties in project network for new product development. This simulation model can be used as a project scheduling technique for product development. By repeating the simulation, the degree of the risk and the feasibility of the project can be assessed.

  • PDF

Upward Influence to Overcome Hierarchical Authority Expectations: A New Approach for Stakeholder Management

  • Fan, Yang;Anantatmula, Vittal
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.28-35
    • /
    • 2012
  • Critical to project success is effective stakeholder management. This paper presents a challenge for the project manager who uses traditional approaches to manage mid-level stakeholders in an organization. Dual roles of a mid-level stakeholder (as a stakeholder of a project and as an agent of the corporate) may cause problems that would result in difficulties for project managers in identifying the stakeholder's attributes and overcoming hierarchical authority expectation. However, the dual roles of the stakeholder result in its weakness in the project-stakeholder relationship. Can a project leverage its strategic role for effective upward influence by linking project objectives to corporate strategic objectives? To address this research question, case study method was used to gain a deeper understanding of mid-level stakeholder's salience. This research proposes an upward influence strategy to embed a project-stakeholder relationship in a hierarchical stakeholder network.

Decision Support System for Project Duration Estimation Model (프로젝트기간 예측모델을 위한 의사결정 지원시스템)

  • 조성빈
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2000.11a
    • /
    • pp.369-374
    • /
    • 2000
  • Despite their tilde application of some traditional project management techniques like the Program Evaluation and Review Technique, they lack of learning, one of important factors in many disciplines today due to a static view far prefect progression. This study proposes a framework for estimation by learning based on a Linear Bayesian approach. As a project progresses, we sequentially observe the durations of completed activities. By reflecting this newly available information to update the distribution of remaining activity durations and thus project duration, we can implement a decision support system that updates e.g. the expected project completion time as well as the probabilities of completing the project within talc due date and by a certain date. By Implementing such customized systems, project manager can be aware of changing project status more effectively and better revise resource allocation plans.

  • PDF