• Title/Summary/Keyword: project approach

Search Result 1,375, Processing Time 0.027 seconds

A Study on the Countermeasures for China's Territory Expanding (중국 영토공정에 관한 대응방안 연구)

  • Shin, Yong-Woo;Oh, Won-Kyu
    • Journal of Cadastre & Land InformatiX
    • /
    • v.44 no.1
    • /
    • pp.37-59
    • /
    • 2014
  • China has been tried to make our former territory named "Guryubuel" as their territory and history using the "Northeast Expanding Project" and other territory expanding projects. This study aimed to make a correspond measure to the cause, purpose and statues on the Northeast Expanding Project of China, to help restoration of Korean territory. For this purpose, it was reviewed the detail about Territory Projects of China. This study included not only the "Northeast Expanding Project" but also the Dandae Project, Tamwon Project and the theory of 'Yoha Civilization' to reveal the project's cause, purpose and detail to analysis the issues and to make a countermeasure. China has been distorted our cture and history on purpose for the territory expanding project. Hence, this study has distinction from the previous approach on the China's territory projects since it has been focused on dilemma of cultural and historical distortion by some Chinese. This study pointed out the distortion of the history and culture of China, as well as Korean mistakes to interpret the China's claim into our own way. It is emphasized that progressive response of Korean government is very important to protect our territory against the Chinese territory expanding projects.

A Study on the Economic Value Estimation of Port Redevelopment Project - With a Focus on the Amenity's perspective - (항만재개발사업의 경제적 가치추정에 관한 연구 - 어메니티의 관점에서 -)

  • Sim, Ki-Sup
    • Journal of Korea Port Economic Association
    • /
    • v.37 no.2
    • /
    • pp.33-53
    • /
    • 2021
  • This study estimated the economic value of port redevelopment projects. The port redevelopment project consists of a combination of goods between market goods and non-market goods. The value of market goods can be measured at prices in the real market, but it is difficult to convert value estimates for non-market goods into currency values. Therefore, in this study, economic benefits of port redevelopment projects were estimated by the using the CVM. The estimated model used the Hanemann's model and the Bayesian approach to estimate the WTP of the sample group's using the single boundary model. Estimating the household's WTP, the Hanemann's model was estimated at KRW 10,038.33 and the Bayesian approach at KRW 12,217.1. As of the five-year period(discount benefits), the economic benefits of the port redevelopment project were estimated at 920.7 billion won for the Hanemann's model and 1.12 trillion won for the Bayesian model on a national basis. Meanwhile, as a result of estimating economic benefits(discount benefits) based on the administrative districts of Busan·Gyeongnam·Ulsan regions(five-year period), the Hanemann's model was estimated at KRW 140.4 billion and the Bayesian approach was estimated at KRW 170.8 billion.

Research on make-or-buy decision making strategy using system dynamics: Focused on Korea's military improvement project (시스템 다이내믹스를 이용한 제조-구매 결정 전략: 한국의 방위력 개선 사업을 중심으로)

  • Choi, Jeong-Hwan;Ko, Seong-Pil;Lee, Jeong-Dong
    • Korean System Dynamics Review
    • /
    • v.13 no.1
    • /
    • pp.159-182
    • /
    • 2012
  • Strategic decision on the execution of national security improvement project is greatly important for the present and future national security. Though, the importance of strategic decision, decision making process has been executed under one-way thinking framework. This research provides a decision-making tool with make-or-buy approach for the national security improvement policy execution methods: foreign purchase and military R&D project, and, via simulation, confirms dynamic change of military capability index respect to change in ratio of foreign purchase and military R&D. A result shows that current ratio of foreign purchases and military R&D is insufficient for national security improvement policy goal. Applying the model from this research provides an appropriate ratio for short term and long term defense strategy and policy goal, and consequent result of increase in national security capability. Thus, this research model can be effectively utilized for national security improvement project.

  • PDF

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

Teaching Magnetic Component Design in Power Electronics Course using Project Based Learning Approach

  • Hren, Alenka;Milanovic, Miro;Mihalic, Franc
    • Journal of Power Electronics
    • /
    • v.12 no.1
    • /
    • pp.201-207
    • /
    • 2012
  • This paper presents the results and gained experiences from the Project Based Learning (PBL) of magnetic component design within a Power Electronics Course. PBL was applied during the laboratory exercises through a design-project task based on a boost converter test board. The students were asked to calculate the main boost converter's circuit parameters' capacitor C and inductor L, and then additionally required to design and build-up the inductor L, in order to meet the project's goals. The whole PBL process relied on ideas from the CDIO (Conceive, Design, Implement, Operate), where the students are encouraged to consider the whole system's process, in order to obtain hands-on experience. PBL is known to be a motivating and problem-centered teaching method that gives students the ability to transfer their acquired scientific knowledge into industrial practice. It has the potential to help students cope with demanding complexities in the field, and those problems they will face in their future careers.

An assessment of the Systems Engineering Capability Maturity of the Railway Safety Project applied the Systems Engineering (시스템엔지니어링을 적용한 철도안전프로젝트의 시스템엔지니어링 능력성숙도 평가)

  • Choi, Yo Chul;Lee, Jae Chon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.55-61
    • /
    • 2008
  • In this paper, there is the case study which assesses the systems engineering capability maturity of the safety organization that performs the Railway Safety project using systems engineering method. To In ore effective and efficient a research and development to railway safety domain, a new research and development method can be progressively needed such as systems engineering. To assess quantitatively research of systems engineering efforts in the railway safety project, SECM(EIA/IS 731) Standard is utilized in the paper. It is by questionnaire that the capability maturity assessment is executed wit h the safety organization and staffs who performs the systems engineering activities; requirement analysis and management, interface control management. product verification and validation, and so on. As a result, the systems engineering capability level of the safety organization rises from 0 level at the initial project to 2 level after two years and all staffs give an affirmative answer about the importance and effectiveness of the systems engineering approach.

  • PDF

A Case Study on the Utilization of Participatory Rural Appraisal on Rural Development - Focusing on Pilot Village Development project of Happiness Program in Vietnam - (참여적 농촌평가(PRA) 활용 농촌지역개발 사례연구 - 베트남 행복프로그램 시범마을사업 중심으로 -)

  • Kim, Jae-Sun;Lee, Il-Kwon
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.2
    • /
    • pp.97-107
    • /
    • 2017
  • The purpose of this study is to introduce a rural development project utilized Participatory Rural Appraisal(PRA), which has been widely developed and applied as an approach and methods for participatory rural development since 1990's. In the ODA project titled as "Happiness Program", a comprehensive community development program designed and conducted by KOICA for underprivileged ethnic minorities in Lao Cai province, Vietnam, the villagers were able to analyse the realities of their situations, to plan, to act, and to monitor and evaluate their actions for improvement through all the processes of PRA utilization. Apart from the successful implementation of participatory rural development activities, this project also made a contribution to extending our knowledge about PRA by presenting the monitoring and evaluation system built for the project and the impact analyzed by the system such as increase in villagers' annual income, expansion of infrastructure, capacity development and etc.

A Study on Improvement of Information Methodology for SMEs (중소기업 정보화방법론 개선 연구)

  • Sun, Nam-Sun
    • Proceedings of the Korea Database Society Conference
    • /
    • 2010.06a
    • /
    • pp.13-19
    • /
    • 2010
  • Information competitiveness accounts for substantial parts of business competitiveness necessary for business management in the knowledge-information society in the 21st century. To improve quality. productivity and competitiveness through information in the fields of SMEs particularly having difficulties under rapidly changing business environment. the government has operated "SME Information Support Project" for the past 8 years. The methodology for developing the standard for this project known as EISDM (Enterprise Information System Development Methodology) provides communication between IT businesses and SMEs participating in this project. and standardized output document formats and how to make out such documents. Infortunately. the number of personnel partaking in the development project for SMEs is no more than 2~4 per site on average. Further. they are required to complete demand analyses. development. testing and operation in about 6 months. which is a very short period. Moreover, there is too much demand for documentation, which is likely to end up being formal work process just for supervision and inspection. That is, the documentation could be for noting but documents. which will prove useless outputs after the project finishes. Therefore, this study proposes an improvement approach as an information system development methodology taking into account SMEs' characteristics and environment so as to relieve developers from such excessive burden of documentation, to save time and resources through efficient management of software development as the original purpose of the methodology, and to produce required quality software.

  • PDF

Exploring the effective management of the school complexes -Based on the cases of the elementary schools in Seoul Metropolitan- (학교 복합시설의 운영에 관한 연구 -서울특별시 초등학교 시설을 중심으로-)

  • Oh, Hai Jin;Lee, Jae Rim
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.8 no.2
    • /
    • pp.1-11
    • /
    • 2009
  • The school complex project is driven by public calling for school facilities change due to the social change followed by the aging society and increasing interest in the lifelong education. The school complex project is defined as an activity in which the school facilities and space are not only used for students, but also for the local residents. Since the project was promoted in a link with reform of the education system in 2001, the demand in the expectation effect has been sharply increasing. Despite of the high expectation and attention, the school complex project, however, has been performed in a limit of efficiency. Consequently, public opinion calling for more structured and effective way on construction and administration has been certainly increasing. According to the strong demand, this study was carried out to provide basic data for, and suggest an approach to, more structured and effective way of establishment and administration of the school complex project by comparing the success cases in Seoul metropolitan city.

  • PDF

A time-cost tradeoff problem with multiple interim assessments under the precedence graph with two chains in parallel

  • Choi, Byung-Cheon;Min, Yunhong
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.3
    • /
    • pp.85-92
    • /
    • 2018
  • We consider a project scheduling problem in which the jobs can be compressed by using additional resource to meet the corresponding due dates, referred to as a time-cost tradeoff problem. The project consists of two independent subprojects of which precedence graph is a chain. The due dates of jobs constituting the project can be interpreted as the multiple assessments in the life of project. The penalty cost occurs from the tardiness of the job, while it may be avoided through the compression of some jobs which requires an additional cost. The objective is to find the amount of compression that minimizes the total tardy penalty and compression costs. Firstly, we show that the problem can be decomposed into several subproblems whose number is bounded by the polynomial function in n, where n is the total number of jobs. Then, we prove that the problem can be solved in polynomial time by developing the efficient approach to obtain an optimal schedule for each subproblem.