• 제목/요약/키워드: productivity and cost

검색결과 1,369건 처리시간 0.027초

형재 절단금형 개발에 관한 연구 (Development of a Channel Cutting Die Set)

  • 박귀선;이춘만
    • 한국정밀공학회지
    • /
    • 제18권1호
    • /
    • pp.117-122
    • /
    • 2001
  • Many kinds of channels are used in industrial equipment and production machinery. Although mechanical saw has been used to cut many sorts of channels, there is cost rise problem because of low productivity. Shearing of channel has a special place because it helps to cut expected shape and size easily. A channel cutting die set which can be mounted and used on a hydraulic press is developed to improve the productivity of channel cutting process. Mode for the channel cutting is divided into single cut and double cut method. This study use double cut method, and the developed channel cutting die set is composed of upper and lower die set. Shearing time can be reduced from 40 minutes to 20 seconds using the developed channel cutting die set. The productivity of channel cutting process can be increased with shearing time reduction as well as cost reduction.

  • PDF

TBM 굴착 공법 적용 구경별 표준 공사비 및 공사기간 분석 연구 (Analysis of Standard Cost and the Construction Period Applied TBM Excavation Method)

  • 박홍태
    • 한국재난정보학회 논문집
    • /
    • 제8권4호
    • /
    • pp.319-327
    • /
    • 2012
  • 본 연구는 대표적인 TMB 장비 회사인 독일 WRITH사에서 개발한 TMB 공법 적용 현장의 굴진보고서를 수집하여 작업운영 생산성을 분석하였다. 그리고 분석된 자료를 근거로 구경별(2.6m, 3.0m, 3.5m, 5.0m, 8.0m) 월굴진속도(m/월)를 도출하였다. 또한, 도출된 구경별 월 굴진속도를 근거로 독일의 WRITH사에서 구경별로 제시한 1m당 굴진에 소요되는 공사비 와 총공사기간을 산출하였다. 경암 40.0%, 연암 30.0%, 보통암 20%, 풍화암 10.0%로 구성된 암질을 기준으로 구경별로 도출된 월굴진속도, m당 공사비, 총공사기간은 향후 TBM 공법 적용시 기본계획단계와 기본설계단계에서 구경별 공사기간 및 공사비를 추정하는데 효과적인 활용 자료가 될 것으로 사료된다.

공동주택의 현장관리 인력 산출모형 연구 (A Calculation Model of Site Management Manpower for Apartment Building Construction Project)

  • 권기덕;김선국;원일우;주진규;이군재
    • KIEAE Journal
    • /
    • 제11권4호
    • /
    • pp.47-54
    • /
    • 2011
  • Construction companies find it increasingly necessary to reduce the cost as the construction market has been suffering from a depression and the industrial environment has been changing fast lately. The cost cut demands the productivity management of the field operations, which can be made feasible by assigning an appropriate number of managers on the construction site. However, previous studies are focused on the labor productivity and construction companies take into account only the revenue per worker in organizing the staff. The purpose of this study is to research the model for calculating the field management manpower in accordance with the characteristic of project and site conditions which are usually considered in the beginning of the construction project. The data about apartment building projects of domestic large constructors and factors related to them were statistically analyzed. The results of this study can be used to calculate the necessary field management manpower in accordance with the characteristic of project.

Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • 한국건축시공학회지
    • /
    • 제15권3호
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

생산성 분석을 통한 철근콘크리트공사의 Cost Data Prototype 개발 (Development of Cost Data Prototype in Reinforced Concrete work based on Productivity Analysis)

  • 안수배;지성민;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.135-136
    • /
    • 2011
  • A standard of estimation is used as a basis for estimating the predetermined amount of public construction. However, they raise several points of reasonable labor to be presented to a standard of estimation. For this reason, it is difficult to make a reasonable and efficient estimation of the costs, and this situation presents an urgent need for an accurate way of making such a calculation.This study analyzed the productivity of reinforced concrete work by the CYCLONE model, and the estimated optimal labor through sensitivity analysis, and presented the model on the number of optimal labor through sensitivity analysis.

  • PDF

고령화가 노동 생산성에 미치는 영향 (Aging Influence on Labor Productivity)

  • 이근부;오세호;양희중
    • 대한안전경영과학회지
    • /
    • 제8권2호
    • /
    • pp.81-90
    • /
    • 2006
  • As aging society makes rapid progress, various social problems arise. The drop of productive labor and the increase of welfare cost can be taken as examples. From this point of view, a use of aged labor is a matter of great Important to national productivity improvement. But, the participation rate of the aged in economical activity amounts to 49.8 percent and their unemployment rate does 2.1 percent. The purpose of this paper is to analyze the deterioration of skill and the lowering of adaption to new working environments due to aging. Since the aging effect is closely related to worker's productivity, it should be properly measured and analyzed. The coordination tester is used to find out activity limitations. Experimental results show that the expert skill of the workers can be improved through the effective of their experience. Therefore we can say that some operation is not influenced by aging.

서울.강릉지역 초등학교 급식소의 급식생산성 분석 (Assessment of Productivity and Foodservice Management Practices in Elementary School Foodservices Located in Seoul and KangNung)

  • 김은경;김은미;강명희;홍완수
    • 한국식품조리과학회지
    • /
    • 제14권1호
    • /
    • pp.76-83
    • /
    • 1998
  • The purpose of this study was to evaluate the foodservice management practices and productivity in elementary schools in order to provide basic information for an efficient food service management. This approach was achieved using a variety quantitative and qualitative information including general foodservice management, managerial and operational factors, and the productivity in elementary school foodservice systems. The labor productivity in 28 school foodservice system was assessed and related to a number of influencing variables within the system. The productivity measurement was based upon the total meal equivalents as a ratio of the total direct and non-direct labor hours required to prepare these meals. Twenty-eight elementary schools located in Seoul and Kangnung were surveyed to get data for the variables. Questionnaire and a survey form were mailed. Statistical methods used in this study were descriptive analysis, $\chi$$^2$-test, 1-test and one-way ANOVA analysis. Elementary schools in Seoul were all located in urban areas, whereas elementary schools in Kangnung were in urban areas (40.0%), provincial areas (40.0%) and in isolated areas (20.0%). Total average number of meals including children and staff was 928.2${\pm}$ 650.0 with a yery significant difference (p<0.001) between Seoul and Kangnung. The average cost of school meal in Seoul and Kangnung were 1191.0 won and 1526.2 won, respectively. The result of Pearson Correlation analysis indicated that labor cost per meal, 1-week meal equivalents and meal equivalents per labor were significantly correlated with the productivity.

  • PDF

Rod Type Mold를 이용한 비정형 콘크리트 부재 생산기술 (Manufacturing Technology of Freeform Concrete Segments using Rod Type Mold)

  • 김경주;이동훈;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.64-65
    • /
    • 2014
  • Recently freeform buildings which are free from simple shape are implemented depending on improvement of construction method. However, freeform buildings are spent more time and cost to materialize than typical form. Because molds for production of freeform shape cannot be reused. For these reasons, low productivity, delay of construction schedule and budget overflow are occurred. Thus, technology of molds need to be developed for manufacturing of freeform concrete segments. The objective of this study is manufacturing of freeform concrete segments using rod type mold. This technology can implement not only application to various shape but also mass production. Thus, problems of construction period, productivity and cost can be solved. After this study, productivity analysis should be continued through the field application.

  • PDF

수문의 자동설계 시스템 개발에 관한 연구 (A Study on the Development of Automatic Drawing System for Water-gate)

  • 김일수
    • 한국공작기계학회:학술대회논문집
    • /
    • 한국공작기계학회 1999년도 추계학술대회 논문집 - 한국공작기계학회
    • /
    • pp.87-92
    • /
    • 1999
  • The biggest challenge facing today manufacturing industry is better quality and high productivity. From an economic point of view, productivity is the most important parameter, as high productivity will reduce the cost. However, the customers of today are not only cost concerned, but also quality conscious. So high accuracy levels should also be achieved in the manufacturing process. This paper reports the development of a automatic design system based on AutoCAD program. This work is composed of three section that are design of top down menu, guide frame and gate lifter for water-gate programed by AutoLISP language and runned Windows system. The developed system ultimately generates the design for a water gate through AutoCAD program. In the design of the water gate, it needs about 23 hours with an expert, but this system can be only 80 seconds without an expert.

  • PDF

펌프의 자동설계 시스템 개발에 관한 연구 (A Study on the Development of Automatic Drawing System for Pump)

  • 김일수;박창언;정영재;송창재;김학형;박주석
    • 유체기계공업학회:학술대회논문집
    • /
    • 유체기계공업학회 1999년도 유체기계 연구개발 발표회 논문집
    • /
    • pp.333-337
    • /
    • 1999
  • The biggest challenge facing today manufacturing industry is better quality and high productivity. From an economic point of view, productivity is the most important parameter, as high productivity will reduce the cost. However, the customers of day are not only cost concerned, but also quality conscious. So high accuracy levels should also be achieved in the manufacturing process. This paper reports the development of a automatic design system based on AutoCAD program. 1'his work is composed of three section that are design of top down menu, impeller and casing for pump programed by AutoLISP language and runned Windows system. The developed system ultimately generates the design for a pump through AutoCAD program. In the design of the pump, it needs about 23 hours with an expert, but this system can be only 80 seconds without an expert.

  • PDF