Quality-Sustainable Way to Business Excellence

  • Kondo, Yoshio
    • International Journal of Quality Innovation
    • /
    • 제3권2호
    • /
    • pp.1-12
    • /
    • 2002
  • Quality is distinguished from the other important management indicators, cost and profitability, by the features of its far longer history and of common concern to both manufacturer and customer. We may say from this that quality has a far more human aspect than either cost or profitability. We stress the importance of establishing “quality culture.” But we do not commonly use the terms of “cost culture” or “productivity culture.”In addition, we know from our experiences that improving quality by creative methods can lead to lower cost and higher productivity, although the converse is not necessarily true. In the Maslow's hierarchy of human needs, it is known that the character of human needs changes from extrinsic and material ones at lower levels to intrinsic and mental or spiritual ones at higher levels. We know from our experience that employee satisfaction is closely linked with quality, which is of more human nature and can further be deployed into the detailed elements of quality. The leaders and managers should positively display leadership and respond to the efforts of the subordinates. Without these managerial leadership and efforts, it is almost impossible to provide essential and true customer satisfaction. They are the indispensable elements for business excellence.

PRODUCTIVITY PREDICTION MODEL BASED ON PRODUCTIVION INFLUENCING FACTORS: FOCUSED ON FORMWORK OF RESIDENTIAL BUILDING

  • Byungki Kwon;Hyun-soo Lee;Moonseo Park;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.58-65
    • /
    • 2011
  • Construction Productivity is one of the most important elements in construction management. It is used in construction process scheduling and cost management, which are significant sector in construction management. It is important to make appropriate schedule and monitor how works are done within schedule. But construction project contains uncertainty and inexactitude, modifying construction schedule is being an issue to manage construction works well. Even though prediction and monitoring of productivity can be principal activity, it is hard to predict productivity with manager's experience and a standard of estimate. A large number of factors influencing productivity, such as drawing, construction method, weather, labor, material, equipment, etc. But current calculation of productivity depends on empirical probability, not consider difference of each influencing factor. In this research, the aim is to present a productivity predicting regression model of form work, which includes effectiveness of influences factors. 5 variables existed inside form work are selected by interview and site research based on literature review of existed various productivity influencing factors. The effectiveness and correlation of productivity influencing factors are analyzed by statistical approach, and it is used to make productivity regression model. The finding of this research will improves monitoring and controlling of project schedule in construction phase.

  • PDF

Development of a Descriptive Cost Effectiveness Model for a Subcontractor with Limited Resources

  • 김대영
    • 한국BIM학회 논문집
    • /
    • 제7권3호
    • /
    • pp.40-48
    • /
    • 2017
  • It only takes one failed project to wipe out an entire year's profit, when the projects are not managed efficiently. Additionally, escalating costs of materials and a competitive local construction market make subcontractors a challenge. Subcontractors have finite resources that should be allocated simultaneously across many projects in a dynamic manner. Significant scheduling problems are posed by concurrent multi-projects with limited resources. The objective of this thesis is to identify the effect of productivity changes on the total cost resulting from shifting crews across projects using a descriptive model. To effectively achieve the objective, this study has developed a descriptive cost model for a subcontractor with multi-resources and multi-projects. The model was designed for a subcontractor to use as a decision-making tool for resources allocation and scheduling. The model identified several factors affecting productivity. Moreover, when the model was tested using hypothetical data, it produced some effective combinations of resource allocation with associated total costs. Furthermore, a subcontractor minimizes total costs by balancing overtime costs, tardiness penalties, and incentive bonus, while satisfying available processing time constraints.

서울.경기지역 사업체 급식소의 업무특성 및 생산성지표와의 상관성 분석 (Identifying the Operational Characteristics and its Relationships with Productivity Index of Employee Feeding Facilities in Seoul and Kyoungki Do)

  • 양일선;차진아;이보숙
    • 한국식품조리과학회지
    • /
    • 제11권3호
    • /
    • pp.295-302
    • /
    • 1995
  • The purposes of the study were to identify the operational characteristics in employee feeding facilities, and to examine the correlations of productivity and these characteristics. A questionnaire was developed and mailed the 500 dietitians in employee feeding facilities in Seoul and Kyoungki Do. Usable questionnaires were received from 117 respondents for a response rate of 23.4%. The questionnaire was designed to determine the productivity index and to investigate the relationship between operational characteristics and productivity index. The questionnaire was contained 2 parts with a total of 16 statements. Data were analyzed for descriptive statistics and Pearson correlation analysis using SPSS/PC programs. The average productivity indices of 117 facilities were 6.91 meals/hr. Total meals served/week was significantly correlated to the productivity index (r=0.441, p < 0.001). No of average servings per meal, percentage of convenience food use, average minutes for service/day, and employment in professional practice of dietitian were also positively correlated, while food cost was negatively correlated to the productivity.

  • PDF

IT 분야 학술지의 연구 생산성 및 심사 효율성 분석 (The Analyses of Research Productivity and Review Efficiency for IT Related Journal)

  • 김기환;김인재
    • 한국IT서비스학회지
    • /
    • 제13권4호
    • /
    • pp.93-107
    • /
    • 2014
  • Interests on collaborative research and academic relationship among researchers have been increased. Collaborative researchers can maximize productivity, time and cost savings, and reduce the risk of research. An empirical study on the research productivity of co-authors' network and review efficiency of the reviewer network was conducted based on co-author networks and reviewer networks in Korea Society of IT Service. This study aims to find the characteristics of the co-author and reviewer networks, and to analyze research productivity and review efficiency in order to draw some implications. The meaning of interactions among professional groups was analyzed. Research productivity index was calculated using 728 authors' papers submitted to the society. In order to verify the effects of indicators of social network analysis on research productivity and review efficiency, correlation and regression analyses were used. As a result, the indicators of network centrality did not affect the review efficiency, but affect the research productivity.

MULTIPLE LINEAR REGRESSION APPROACH FOR PRODUCTIVITY ESTIMATION OF BULLDOZERS

  • Abbas Rashidi;Hoda Rashidi Nejad;Amir H. Behzadan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1140-1147
    • /
    • 2009
  • Productivity measurement of construction machinery is a significant issue faced by many contractors especially those involved in earthwork projects. Traditionally, equipment production rate has been estimated using data available in manufacturers' catalogues, results of previous construction projects, or personal experience and assessments of the site personnel. Actual production rates obtained after the completion of a project demonstrate the fact that most of these methods fail to provide accurate results and as a direct consequence, may lead to unrealistic project cost estimations prepared by the contractors. What makes this more critical is that in most cases, inadequate cost estimations lead the entire project to exceed the initial budget or fall behind the schedule. In this paper, a linear regression method to estimate bulldozer productivity is introduced. This method has been developed using SPSS-16 software package. The presented method is used to estimate the productivity of Komatsu D-155A1 series which is commonly used in many earthmoving operations in Iran. The data required for the numerical analysis has been collected from actual site observation and productivity measurement of 60 pieces of D-155A1 series currently being used in several earthmoving projects in Iran. Comparative analysis of the output data of the presented regression method and the existing productivity tables provided by the manufacturer shows that when compared to the actual productivity data collected on the jobsite, a significant increase in accuracy and a remarkable reduction of data variance can be achieved by using the presented regression method.

  • PDF

Web-Cyclone을 활용한 샌드위치 패널공사 작업조별 생산성 분석 및 공사금액 예측에 대한 연구 (Crew Productivity and Cost Analysis of Sandwich Panel Construction Work by Applying Web-Cyclone Simulation)

  • 조동열;이승현;손재호
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.262-267
    • /
    • 2008
  • 1970년대부터 고도의 산업발전을 이루기 시작한 국내 건설현장에서 저렴한 공사비용 및 간편한 시공성 등을 장점으로 샌드위치패널을 활용한 건축물이 급격하게 증가하는 실정이다. 하지만 샌드위치 패널의 시공을 담당하는 기업들은 대형 건설기업보다 중소건설업체에서 시공하기 때문에 생산성 향상을 위한 연구가 부족한 상황이다. 본 연구는 샌드위치패널공사현장을 실사하여 작업조별 작업싸이클을 분석하고 Web-Cyclone을 이용한 모델링을 구축하여, 각 작업조별 생산성 및 공사금액을 분석하였다. 이를 활용하여 샌드위치패널공사의 작업조 생산성 정보를 상대적으로 연구가 부족한 국내 중 소규모 전문건설업체들이 자신들의 현장 특성에 적합한 샌드위치패널공사의 생산성 및 공사금액을 예측 및 적용할 수 있을 것이다. 또한 본 연구에서 작성한 모델링을 기반으로 유사한 공정에 대하여 시뮬레이션을 모델링화하는데 적용될 수 있을 것으로 예상된다.

  • PDF

자동차용 Adjust Plate Progressive 금형 개발 (Development of Adjust Plate Progressive Die)

  • 배용환;반갑수
    • 한국안전학회지
    • /
    • 제17권4호
    • /
    • pp.1-4
    • /
    • 2002
  • A automatic production system was developed for high productivity and safety. The semi-progressive die was unfavorable for more productivity, safety, material extravagance and incongruent high-speed production. Developed progressive die is suitable for the high production and guarantee triple production by acceptance of three array type for automobile adjust plate. We adopt Pro-$Engineer{\circledr}$ for three dimensional computer aided design suitable for the disassembly and assembly evaluation. The conclusion of this study is as follow. First, press die parts solid modeling system is built by using Pro-$Engineer{\circledr}$ through this research and verified allowable tolerance and possibility of assembly and disassembly of parts. Therefore we can reduce die manufacturing time and cost. Second, We produce 1000 units pet hot coil 1ton by traditional method, but we can acomplish material saving effect about 12% as 120 units in case of new progressive die. Fourth, we acomplished manufacturing cost curtailment effect more than 20% in comparison with traditional method.

Reinforced-Concrete Works Productivity Analysis on Nuclear-Power-Plant Project

  • Lim, Jin-Ho;Huh, Young-Ki;Oh, Jae-Hun;Seo, Hyeon-Taek
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.600-601
    • /
    • 2015
  • Both the importance and process of estimating Nuclear-power plant construction time and cost have increased in significance as energy user costs themselves have become more significant. In estimating construction time, few parameters are more significant than work item production rates and factors significantly affecting the rates. A standardized data collection tool was used to acquire a total of 401 data points from a S Nuclear-power plant project, for selected critical works: form-work, rebar-work, and concrete-pouring. With the data, several hypothesized drivers of the man-hour production rates and crew-day production rates were also analyzed. Findings from this study will enable industry professionals to enhance accuracy of time and cost estimation for nuclear power plant construction.

  • PDF

TBM 굴착 공법 적용 현장의 생산성 분석을 통한 암질별 굴진속도 및 직접공사비 분석 (Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site)

  • 송용선;박홍태
    • 대한토목학회논문집
    • /
    • 제32권6D호
    • /
    • pp.637-643
    • /
    • 2012
  • 본 연구는 대표적인 TMB 장비 회사인 독일 WRITH사에서 개발한 TMB 공법 적용 현장의 굴진보고서를 수집하여 작업운영 생산성을 분석하였다. 그리고 분석된 자료를 근거로 구경별(3.0m, 3.5m, 3.8m) 굴진속도(m/일)를 도출하였다. 또한, 도출된 구경별 굴진속도를 근거로 독일의 WRITH사에서 구경별로 제시한 1m당 굴진에 소요되는 직접공사비를 적용하여 총 직접공사비를 산출하였다. 암질별 구경별로 도출된 굴진속도는 향후 유사한 암질에서 공사를 수행할 때, 공사 착수 전 총작업일수 및 총직접공사비의 산정을 활용한 공정 계획 및 관리를 수행하는데 효과적인 활용 자료가 될 것으로 사료된다.