• Title/Summary/Keyword: procurement method

Search Result 190, Processing Time 0.024 seconds

Analysis and Survey on Occupational Safety and Health Management Expenses in the Construction Industry (건설업 산업안전보건관리비 사용 실태조사 및 분석)

  • Sung-Yun Kang;Oh-Se Wook;Kim-Chang Won;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.2
    • /
    • pp.113-120
    • /
    • 2023
  • Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.

A Study on the Development of an Appropriate Purchasing Models for Electronic Books in the School Libraries (학교 도서관을 위한 전자책 구매 모델 개발에 관한 연구)

  • Kim, Sung-Hyuk;Kim, Jin-Sook
    • Journal of the Korean Society for information Management
    • /
    • v.23 no.2
    • /
    • pp.129-145
    • /
    • 2006
  • This paper is studied in order to develop the models that are appropriate for the procurement of electronic books at the school libraries. To develop the model, the following factors were reviewed: the characteristics of an electronic book, the factor analysis that affect the electronic book price, use case, environment, the role of government for the price decision model and procurement method. The models were proposed based on the above analysis and review. In addition, the proposed models reflect various opinions that the school libraries can apply.

A Design-Decision Support Framework for Evaluation of Design Options in Passenger Ship Engine Room

  • Kim, Soo-Woong;Lee, Hyun-Jin;Kwon, Young-Sub
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.277-280
    • /
    • 2006
  • Most real world design evaluation and risk-based decision support combine quantitative and qualitative (linguistic) variables. Decision-making based on conventional mathematics that combines qualitative and quantitative concepts always exhibit difficulty in modelling actual problems. The successful selection process for choosing a design/procurement proposal is based on a high degree of technical integrity, safety levels and low costs in construction, corrective measures, maintenance, operation, inspection and preventive measures. However, the objectives of maximising the degree of technical performance, maximising the safety levels and minimising the costs incurred are usually in conflict, and the evaluation of the technical performance, safety and costs is always associated with uncertainties, especially for a novel system at the initial concept design stage. In this paper, a design-decision support framework using a composite structure methodology grounded in approximate reasoning approach and evidential reasoning method is suggested for design evaluation of machinery space of a ship engine room at the initial stages. It is a Multiple Attribute Decision-Making (MADM) or Multiple Criteria Decision Making (MCDM) framework, which provides a juxtaposition of cost, safety and technical performance of a system during evaluation to assist decision makers in selecting the winning design/procurement proposal that best satisfies the requirement in hand. An illustrative example is used to demonstrate the application of the proposed framework.

  • PDF

The Study on the Methodology for Naval Ship(Craft Air Cushion) Vulnerability Analysis (함정(공기부양정) 취약성 분석방법 연구)

  • Choi, Bong-Wan;Lee, Chan-Sun
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.6
    • /
    • pp.1106-1112
    • /
    • 2010
  • One of the considerations in weapon systems procurement is the objective of maximizing the current force. Also, offensive effects, rather than defense are valued in weapons system development and procurement. Especially, the survivability of a naval ship is equally important as the offensive effect of onboard weapons. In case of naval ships, development of attack tactics and research regarding damage minimization must be conducted through live fire exercise against actual targets in order to minimize damage from the enemy. However, it is difficult to conduct such adequate measures due to realistic limitations such as time and budget in order to verify and calculate a weapon system's attack and damage effects along with the lack of practical studies in this subject despite numerous interests. Research are being conducted utilizing M&S to estimate attack effects and study damages due to such reason, but the lack of authoritative data and development ability are limiting calculation of reliable results. Therefore, this study will propose a measure to increase survivability of a weapon system(ship/vessel) utilizing research of vulnerability from enemy attacks analysis method against a naval ship(Craft Air Cushion).

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

A Study of FEED Verification process of Small Utility Equipment in Offshore plant (해양플랜트 소형 유틸리티장비의 FEED 검증 프로세스에 대한 연구)

  • Han, Seong-Jong;Park, Beom
    • Plant Journal
    • /
    • v.13 no.2
    • /
    • pp.39-45
    • /
    • 2017
  • This paper is a study on FEED validation model that can be used in the bidding stage of small utility equipment in offshore plant industry using system engineering technique. Currently, domestic marine plant equipment industry companies are faced with the financial risk of project execution as they enter marine plant. The major cause was the insufficient ability to verify the FEED output from the contractor (Engineering or Procurement and Construction) of the equipment manufacturer (COMPANY or EPC). Therefore, we propose FEED design verification method that simplifies the system engineering method that sequentially applies requirements analysis, function, performance analysis and physical architecture building process. Also, we verified the suitability of the developed model by comparing the results of applying the developed FEED verification model and the verification method that depends on the existing experience for the small utility equipment (Air Compressor).

  • PDF

A Study on the Assignment and the Procurement Method of Wood Works' Craftsman in Royal Tombs Constructions in the Late Joseon Period (조선후기 왕릉 조성 시 목공사 장인의 배정과 조달 방식)

  • Lee, Sang-Myeong
    • Journal of architectural history
    • /
    • v.26 no.4
    • /
    • pp.19-34
    • /
    • 2017
  • The purpose of this study was to comprehend the assignment and the procurement method of wood works' craftsman through the Salleung-dogamuigwes in royal tombs constructions in the late Joseon period. Following conclusions have been reached through the study. First, Carpenter and other nine craftsmen were introduced in carpentry works. The craftsmen were put in by occupation to maintain the quality of the government building construction by wood processing area. It was distinguished by frame member, Sujangjae, window framing wood, decorative member. Second, sawyer showed a sharp increase in the latter half of the 18th century and declined since the middle of the 19th century. This is closely related to the increase in demand for building materials and the growth of civilian wood products. As a maximum of 300 people have been assigned to the craftsmen in the woodwork, it can be seen that the work has been divided by the process. Third, the national carpenter was difficult to procure from the 17th century to the beginning of the 18th century. From the middle 18th century, the system procuring national carpenter was stabilized. In the 19th century, the input ratio of the national craftsmen seems to have decreased significantly and seems to have kept it at the minimum level. Forth, sawyer were procured through Seongonggam from the late 18th century through the mid 19th century. That means that the role of the sawyer had become important. Since Jogakjang is not a necessary manpower, it usually has civilian artisans.

U.S. Architectural Engineering Service Procurement System for Public Construction Project and Its Implication (미국 공공건설사업에서의 건설기술용역 조달시스템 고찰 및 시사점)

  • Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.2
    • /
    • pp.215-225
    • /
    • 2020
  • In selecting a company of A-E service provider for a public construction project, public owners make widely use the evaluation method based on the quantitative criteria to emphasize transparency and fairness instead of putting more weighting on bidders' technical capability. The selection method and process to select technically better company has been in discussion to motivate company to build up their technical capability and better quality of service. This paper examined US laws and regulations related to evaluating and selecting an A-E company for public construction project in terms of principles, process, selection committee, evaluation methods, and contract management and so on. Then deduced several implications for domestic public owner to select the most adequate company for a certain architectural service through fair and efficient way. The major findings are technical capability based selection, emphasizing owner's role and responsibility, consideration of small and mid-sized company, debriefing, and post-service evaluation.

An Implementation Methodology and Prototyping for Manufacturing CALS/EC System Using IDEF0 and IDEF1X (IDEF0 모델과 IDEF1X 모델의 연계를 통한 제조업 CALS/EC 시스템 구축 방법 및 프로토타입 구현)

  • Kim, Soung-Hie;Lee, Jae-Kwang;Han, Chang-Hee;Cho, Yoon-Ho
    • IE interfaces
    • /
    • v.10 no.3
    • /
    • pp.95-107
    • /
    • 1997
  • In this paper, we suggest the system analysis method that integrate IDEFO and IDEFIX. Based on the method, we propose the procedure which can be used to build CALS/EC system in manufacturing industry. Also, applying the procedure and method to electronic company, we construct the CALSEC prototype system. With the three types of view-point, process, information technology and standard, we proceed the implementation of CALS/EC in manufacturing industry. We divide the electronic company's process into five core process, 1)processes-product concept planning process. 2)product development process, 3)procurement process, 4)delivery/distribution process and 5)customer service process.

  • PDF

A Study on the Cost Reduction Strategy of Aviation Ammunition (항공탄약 구매 비용 절감 방안에 관한 연구)

  • Kim, Yu-Hyun;Eom, Jung-Ho
    • Journal of National Security and Military Science
    • /
    • s.15
    • /
    • pp.57-86
    • /
    • 2018
  • The ROKAF has been training for a number of exercise for victory in the war, but the lack of aviation ammunition has become a big issue every year. However, due to the limitation of defense resources, there are many difficulties in securing and stockpiling ammunition for the war readiness. Therefore, there is a need to find a way to secure aviation ammunition for war readiness in a more economical way, so In this study, we analyze the precedent research case and the case of the reduction of the purchase cost of weapon system of other countries, and then I have suggested a plan that is appropriate for our situation. As a result of examining previous research cases for this study, there were data that KIDA studied in 2012, Precision-guided weapons acquisition cost reduction measures pursued by US Air Force And the use of procurement agencies that are being implemented by NATO member countries. Based on this study, the following four measures were proposed to reduce the purchase cost of aviation ammunition. First, the mutual aid support agreement was developed to sign the ammunition joint operation agreement. Second, join the NATO Support & Procurement Agency (NSPA) Third, it builds a purchasing community centered on the countries operating the same ammunition Fourth, participating in the US Air Force's new purchase plan for ammunition and purchase it jointly. The main contents of these four measures are as follows. 1. the mutual aid support agreement was developed to sign the ammunition joint operation agreement. Korea has signed agreements on mutual logistics support with 14 countries including the United States, Israel, Indonesia, Singapore, Australia, and Taiwan. The main purpose of these agreements is mutual support of munitions and materials, also supporting the training of the peace time and promoting exchange and cooperation. However, it is expected that there will be many difficulties in requesting or supporting mutual support in actual situation because the target or scope of mutual aid of ammunition is not clearly specified. Thus, a separate agreement on the mutual co-operation of more specific and expanded concepts of aviation ammunition is needed based on the current mutual aid support agreements 2. join the NATO Support & Procurement Agency (NSPA) In the case of NATO, there is a system in which member countries purchase munitions at a low cost using munitions purchase agencies. It is the NATO Purchasing Agency (NSPA) whose mission is to receive the purchasing requirements of the Member Nations and to purchase them quickly and efficiently and effectively to the Member Nations. NSPA's business includes the Ammunition Support Partnership (ASP), which provides ammunition purchase and disarming services. Although Korea is not a member of NATO, NSPA is gradually expanding the scope of joint procurement of munitions, and it is expected that Korea will be able to join as a member. 3. it builds a purchasing community centered on the countries operating the same ammunition By benchmarking the NSPA system, this study suggested ways to build a purchasing community with countries such as Southeast Asia, Australia, and the Middle East. First, it is necessary to review prospectively how to purchase ammunition by constructing ammunition purchasing community centered on countries using same kind of ammunition. 4. participating in the US Air Force's new purchase plan for ammunition When developing or purchasing weapons systems, joint participation by several countries can reduce acquisition costs. Therefore, if the US Air Force is planning to acquire aviation ammunition by applying it to the purchase of aviation ammunition, we will be able to significantly reduce the purchase cost by participating in this plan. Finally, there are some limitations to the method presented in this study, but starting from this study, I hope that the research on these methods will be actively pursued in the future.

  • PDF