• Title/Summary/Keyword: procurement method

Search Result 190, Processing Time 0.023 seconds

Development of a System that Translates Spec-catalog Data for Plant Equipment Considering Holes and Nozzles (홀과 노즐을 고려한 플랜트 기기 스펙-카탈로그 데이터 번역 시스템 개발)

  • Lee, Hyunoh;Kwon, Hyeokjun;Lee, Gwang;Mun, Duhwan
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.19 no.9
    • /
    • pp.59-70
    • /
    • 2020
  • Three-dimensional (3D) design data is used for various purposes throughout the life cycle of a plant construction project. Plant 3D CAD systems support 3D modeling based on specs-catalogs, which contain data that are used for different purposes such as design, procurement, production, and handover. Therefore, it is important to share the spec-catalog data in the 3D design model with other application systems. Sharing this data thus requires a system that extracts spec-catalog data from plant 3D CAD systems and converts them into neutral model data. In this paper, we analyze equipment spec-catalog data of plant 3D CAD systems and, based on these analyses, define the data structure for neutral spec-catalog data. We subsequently propose a procedure that translates native spec-catalog data to neutral model data and develop a prototype system that performs this operation. The proposed method is then experimentally validated for the test spec-catalog data.

A Study on the Proper Methodology for Selecting Domestic Public Sector Construction Management Contracts (국내 공공부문 CM의 평가 및 낙찰자 선정방법 개선안 연구)

  • Lee Yong-Jun;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.296-299
    • /
    • 2002
  • Construction Management tends to create a formal procurement resulted from recent legislative procedures system in domestic construction industry. However, the fact that construction Manager(CMr) has been chosen, in practice, under a poor circumstance in selecting and discriminating specialty requires the more optimal procedures. Therefore, in this research, we analyze the existing shortcomings. the various procedures, influence factors, and the criteria to be considered in selecting and evaluating CMr. Also. this study suggests the improved method based on the facts above. To accomplish the construction project successfully, it is one of the advanced schemes to choose an adequate CMr needed to the project through the precision in the formation and application of the procedure as well as the suggested criterion in selecting CM.

  • PDF

A Study on the Dispute Boards in International Medium and Long-term Transaction - Focus on the Construction Contract - (중장기 국제거래에서 분쟁해결위원회에 관한 고찰 - 건설계약을 중심으로 -)

  • Yu, Byoung Yook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.57
    • /
    • pp.79-108
    • /
    • 2013
  • International transactions of plant and construction project need to time to time for completing the contract. During the performing the contract there may arise many claims and disputes it should be settled rapidly for processing schedule of works. However, arbitration and litigation for settlement of dispute are inappropriate in time and expense under the specifications of plant and construction project. Dispute boards are one of the successful resolution method of dispute prior to litigation or arbitration. If the dispute board was failed, of course, it may be allowed to continue into litigation or arbitration. As the creative methods of parties agreement, dispute boards may be expected to avoid claims and dispute in long and medium international contract. The purpose of this paper is to explore the specification and limitations of dispute boards that may clear disputes under long and medium contract of construction and procurement. It needs to be understand to determine whether is the useful methods for resolving dispute in the international project. This paper considers the specific natures of dispute board and its rules, procedures and problems including ICC and FIDIC for the contract of long and medium transaction.

  • PDF

Integration of Ship Outfitting BOM with Lifecycle Stages (선박 의장 BOM을 Lifecycle을 고려한 BOM 통합 방안 연구)

  • Kim, Dae-Seok;Lee, Kyung-Ho;Lee, Jang-Hyun;Lee, Jung-Min;Lee, Kwang;Kim, Jin-Ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.3
    • /
    • pp.187-196
    • /
    • 2011
  • Generally, BOM (Bill of Material) means a part list which is needed to manufacture or assemble a product or part. During manufacturing processes, BOM is inevitably required for most of enterprise processes such as design, procurement, production planning/control, resource planning, and financial works. Every manufacturing industry uses many kinds of BOM's that are adjusted to the requirement of functions of their work division. Moreover, BOM evolves in different forms according to the product development phases such as conceptual design; function design, detail design, and production design because it is necessary to use different product structures to keep product data generated throughout the lifecycle of a product. This includes all data and information related to the all the product development phases. Shipbuilding works also are processed and controlled based on BOM. However, effective maintenance of ship outfitting BOM data is getting difficult as the amount and complexity of data have increased due to variety and long lifecycle of ship. For the effective management of outfitting BOM data, two aspects must be considered. One is how to classify numerous BOMs type and the others how to display BOMs. So this study suggests a method to classify BOM types and propose two categories - Structure BOM, Display BOM. Base on this result, we propose the integrated ship outfitting BOMs model and analysis outfitting BOMs.

Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.

A Study on the Actual Condition Analysis and Improvement of Rebar Work in Korean Building Construction (국내 철근공사 실태분석 및 개선방안에 관한 연구)

  • Park, U-Yeol;Kim, Gwang-Hui;Gang, Gyeong-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.3
    • /
    • pp.83-91
    • /
    • 2004
  • With labor shortage and high-wage era, the construction cost is rising and the construction business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. However, although reinforcing bar(rebar) work, which greatly effects the building's safety, endurance, and construction time, is an important phase in construction, it holds serious problem of quality and productivity deterioration due to its characteristic of intensive-labor and maintaining of old work methods resulting in poor management, and costs increase. Therefor in this study to investigate current situation and problems of rebar work and to find methods of betterment, a survey was conducted to site engineers and individuals in division of cost estimate of domestic construction company. The survey questions were on the subjects of (1) calculating rebar quantity, (2) ordering and procurement, (3) rebar cutting and bending, and (4) rebar work management. Method of improvement was sought by analyzing the results of the survey

Fashion Product Salesperson's Perception of Fashion Company in the Middle Management System of Department Store (백화점 중간관리 형태에서 패션제품 판매원의 패션업체에 대한 인식)

  • Lee, Hyun-Jin;Choo, Tae-Gue
    • Fashion & Textile Research Journal
    • /
    • v.13 no.5
    • /
    • pp.705-716
    • /
    • 2011
  • The purpose of this study was to investigate salesperson's perception of fashion company in the middle management system of department store. This study was conducted by a qualitative research method. An in-depth interview was managed to 14 fashion shop managers and salesperson who have three or more years of work experience at the department store. Interview details were classified three categories: relations with fashion company and others, concern with products supply, concern with products sales. First, the positive factors on relations with fashion company are mutual trust, stability of fashion company, coordination and consideration for shop, communication with fashion company, methodical IT system, methodical education, and social gathering support. The negative factors are unilateral breach of contract from fashion company, communication problem, gap between sales status in shop and product design in fashion company, lack of professional education, difficulty of participating in education, and inadequate employee benefits. Second, the positive factor on products supply is priority of products supply. The negative factors are lack of main items, product procurement lacking rapidity, and problem of securing a supply. Third, the positive factors on products sales are brand pride, display and information support about products, and free gift support. The negative factors are unfair selling commission policy, sales pressure, and excessive responsibility.

The Implementation of Total Quality Management in Controlling the Cost of Manufacturing

  • Seetharaman, A.;Raj, John Rudolph;Seetharaman, Saravanan Arumugam
    • Journal of Distribution Science
    • /
    • v.13 no.8
    • /
    • pp.27-40
    • /
    • 2015
  • Purpose - Total Quality Management (TQM) has received significant attention and interest from a large number of organizations around the world in various industries. These organizations have tried to embody TQM concepts in areas such as engineering and product design, marketing, R&D, procurement, production, personnel, and product inspection. Research design, data, and methodology - This study presents an overview of the fundamentals of TQM and an in depth review of the obstacles to the successful implementation of TQM. Results - In order to control the cost of manufacturing, the tracking of the cost of quality (COQ) allows companies to capture the actual overall cost incurred in producing a unit of product or service. The study explores the reasons why companies track the COQ and ways to address it. Conclusions - Based on the results, COQ is one of the key performance indicators for making more accurate strategic decisions as well as a critical aspect of TQM. The study also presents a few popular quality improvement tools that have been widely used in organizations successfully implementing TQM.

Development of Decision System for Determining Priorities of Re-construction Reservoirs (농업용저수지 재개발을 위한 우선순위 선정시스템 개발)

  • Lee, Gwang-Ya;Kim, Hae-Do;Jeong, Gwang-Geun
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.26-31
    • /
    • 2005
  • In national prospective, the needs to develop water resources has been increased due to water shortage from diverse use of water resources in agricultural areas. Existing agricultural water demand, which has mainly been limited to the use of farming, are now expanding to diverse water uses such as supporting daily lives, diluting environmental pollution as well as industrial use for agricultural complex currently under construction in agricultural region. In this situation, for the sake of effective procurement of water resources and supply method, it is definitely required to enhance the effectiveness of budget investment and project proceedings through integrated re-development which links projects to strengthen existing dams, reservoirs and hydraulic facilities. The major scopes of this research includes developing different types of system such as selecting potential sites to re-construct reservoirs including generating base maps and thematic maps, data collection regarding water demands and reservoir status; analyzing reservoir data; estimating developable capacity and index calculation; and forecasting inundated areas. In addition, this study provides other products such as developing output generation system which can support wide use of data built and analyzed; database generation for better data management; data analysis including selection, extraction, indexation, and calculation of base items through standardization; data security system prohibiting exterior proliferation and malicious manufacturing of data.

  • PDF

A Case Study on Mobile Web-service Implementation for a VMI System of Small.medium sized the Auto-parts Manufacturer in Supply Chain (공급사슬관계에서 중.소 자동차부품제조업체의 VMI시스템에 관한 웹서비스구현)

  • Na, Sang-Gyun;Oh, Myung-Hyun;Jeong, Byung-Ho;Lee, Jun-Su
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.2
    • /
    • pp.29-36
    • /
    • 2007
  • This study was concerned about mobile web-service of a VMI in the SCM system. The VMI would be a main module part of the SCM and regarded as very important thing on supply chain. Therefore, it was essential to react in real time of materials production and situation of used auto-part in procurement company. We could find an affordable method to realize the VMI in a web service. The web service has made inter relevant enterprise easy to collaborate because of supporting most operating system and frame-work. Moreover, the use of a mobile tools was guaranteed a product recording and requirement of materials to real time in a rapid changing of production environments. The result of this research was very useful to apply the VMI system in medium and small sized auto parts company. This web service package has programmed the Visual Studio Dot Net 2003 and the MS SQL 2000 as database.