Analysis of wet Wire Drawing Process and Pass Redesign to Reduce Wire Breakage (습식 신선공정 해석 및 단선율 저감을 위한 패스 재설계)

  • 이상곤;김민안;김병민
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.1034-1037
    • /
    • 2002
  • Wet wire drawing process is used to produce fine wire in the industrial field. The production of fine eire by using wet wire drawing process with appropriate dies pass schedule would be impossible without understanding of relationship between process parameters such as material properties, dies reduction, friction conditions, drawing speed etc. However, up to new, dies pass schedule of wet wire drawing process has performed by trial and error of expert. Therefore, this study investigates the relationship between process parameters quantitatively and analyzes a conventional wet wire drawing process. Using the results, the conventional pass schedule can be redesigned to reduce the wire breakage during wet wire drawing. To verily the result of this study, the wet wire drawing experiment was performed. And the results between conventional process and redesigned pass schedule were compared. As the comparison of results, the wire breakage was considerably reduced in the redesigned pass schedule more than conventional pass schedule.

  • PDF

조선 중일정계획시스템을 위한 공정계획 객체 설계에 관한연구

  • 최해주;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.290-293
    • /
    • 2001
  • The mid-schedule planning of the ship is making a schedule about the process from cutting to erection. The ship consists of lots of blocks. This block has different process because of the shape of the block varies in accordance with the ship-type and the part position of the ship. The type and order of each block process initially must be generated for the mid-schedule planning. In this paper, the process planning, described as above is preparing the basic information before scheduler make a plan with the prepared manhour. The scheduling is done with this process planning which includes the information of the process order. This paper shows the research about three methods to design the process planning. First, investigate the expression method about information of the process planning for the mid-schedule planning in real workplace. Second, design the object of the process planning on the basis of investigating the expression method. Finally, develop the prototype of object on the basis of this designed process planning and then find the practical use in the mid-schedule planning. The object, which is developed in this paper, contains the main algorithm. In case of developing The Mid-Schedule Planning System, this object is expected to be utilized very easily as consisting another object.

  • PDF

Decision of Optimum Grinding Condition by Pass Schedule Change (열간압연 스케줄변경에 따른 최적연삭조건 결정)

  • Bae, Yong-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.6
    • /
    • pp.7-13
    • /
    • 2008
  • It is important to prevent roll failure in hot rolling process for reducing maintenance cost and production loss. The relationship between rolling pass schedule and the work roll wear profile will be presented. The roll wear pattern is related with roll catastrophic failure. The irregular and deep roll wear pattern should be removed by On-line Roll Grinder(ORG) for roll failure prevention. In this study, a computer roll wear prediction model under real process working condition is developed and evaluated with hot rolling pass schedule. The method of building wear calculation functions for center portion abrasion and marginal abrasion respectively was used to develop a work roll wear prediction mathematical model. The three type rolling schedule are evaluated by wear prediction model. The optimum roll grinding methods is suggested for schedule tree rolling technique.

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Pass Schedule Design for Improvement of Drawing Speed in the Dry Wire Drawing Process (신선 속도 향상을 위한 건식 신선 공정의 패스스케줄 설계)

  • 김영식;김동환;김병민;김민안;박용민
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2000.11a
    • /
    • pp.600-603
    • /
    • 2000
  • In the high carbon steel wire drawing process, the wire temperature increases as the drawing speed is faster in order to increase the production rate in the shop floor. The rapid temperature rise causes the wire fracture in the dry wire drawing process. So, in this paper, the isothermal pass schedule program, which includes the calculation method of wire temperature at each pass, is proposed to prevent the wire fracture due to the temperature rise. Using the isothermal pass schedule program, it is newly proposed the pass schedule design system that prevents the cup-cone defects, improves the elongation of the final products and assures further deformation. As a result, the temperature rise of the wire was decreased and the production rate of the final product is remarkably grown up according to the increase of the final drawing speed than that of the conventional process. Also, the proposed pass schedule design system could give a useful information to the process designer who would design the high carbon steel wire drawing process.

  • PDF

Rescheduling algorithms considering unit failure on the batch process management (회분공정의 장치 고장을 고려한 동적생산계획 기법)

  • Ko, Dae-Ho;Moon, Il
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.1028-1031
    • /
    • 1996
  • Dynamic scheduling is very important in constructing CIM and improving productivity of chemical processing systems. Computation at the scheduling level requires mostly a long time to generate an optimal schedule, so it is difficult to immediately respond to actual process events in real-time. To solve these problems, we developed dynamic scheduling algorithms such as DSMM(Dynamic Shift Modification Method), PUOM(Parallel Unit Operation Method) and UVVM(Unit Validity Verification Method). Their main functions are to minimize the effects of unexpected disturbances such as process time variations and unit failure, to predict a makespan of the updated dynamic schedule and to modify schedule desirably in real-time responding to process time variations. As a result, the algorithms generate a new pertinent schedule in real-time which is close to the original schedule but provides an efficient way of responding to the variation of process environment. Examples in a shampoo production batch process illustrate the efficiency of the algorithms.

  • PDF

Pass Redesign for Reduction of Wire Breakage in the Wet Wire Drawing Process (습식 신선공정의 단선율 저감을 위한 패스 재설계)

  • Lee S. K.;Kim M. A.;Kim B. M.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2002.11a
    • /
    • pp.71-77
    • /
    • 2002
  • The Production of fine wire through wet wire drawing process with appropriate pass schedule would be impossible without understanding of relationship among many process parameters. Therefore, this paper investigates the relationship among process parameters of wet wire drawing process. In this study, it is possible to obtain the important basic data that can be used in the pass schedule of multi-pass wet wire drawing process. In order to verify the effectiveness of the analysis, pass redesign was performed based on the result of analysis to reduce the wire breakage. The wire breakage between the conventional pass schedule and the redesigned pass schedule was compared by the FE analysis and the wet win drawing experiment.

  • PDF

Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information (BIM정보를 활용한 강구조물의 공정 물량 통합관리)

  • Kim, Jin-Uk;Shin, Tae-Song
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.

Analysis of Multi-Pass Wet Wire Drawing Process and Its Application (다단 습식 신선공정 해석 및 적용)

  • Lee S. K.;Kim B. M.
    • Transactions of Materials Processing
    • /
    • v.14 no.8 s.80
    • /
    • pp.689-695
    • /
    • 2005
  • Multi-pass wet wire drawing process is used to produce fine wire in the industrial field. The production of fine wire through multi-pass wet wire drawing process with appropriate dies pass schedule would be impossible without understanding the relationship among many process parameters such as material properties, dies reduction, friction conditions, drawing speed etc However, in the industrial field, dies pass schedule of multi-pass wet wire drawing process has been executed by trial and error of experts. This study investigated the relationship among many process parameters quantitatively to obtain the important process information fur the appropriate pass schedule of multi-pass wet wire drawing process. Therefore, it is possible to predict the many important process parameters of multi-pass wet wire drawing process such as dies reduction, machine reduction, drawing force, backtension force, slip rate, slip velocity rate, power etc. The validity of the analyzed drawing force was verified by FE simulation and multi-pass wet wire drawing experiment. Also, pass redesign was performed based on the analyzed results, and the wire breakage between the original pass schedule and the redesigned pass schedule was compared through experiment.

A Study on the Fine Wire Drawing Process Design to Improve the Productivity (생산성 향상을 위한 세선 인발공정설계에 관한 연구)

  • Lee, S.K.;Kim, B.M.;Kim, M.A.
    • Transactions of Materials Processing
    • /
    • v.17 no.4
    • /
    • pp.257-262
    • /
    • 2008
  • The control of wire temperature is very important in the fine wire drawing process. The wire speed should be increased, and the wire temperature should be dropped as much as possible. Up to now, the process design of wire drawing process depends on the experiences of experts. In this study, a wire drawing process design method was proposed to increase the productivity. The proposed method of this study includes the pass schedule and the design of a multi pass wire drawing machine. A pass schedule was performed based on the calculation of the wire temperature. Also, a new multi pass wire drawing machine was manufactured to apply the designed pass schedule. Through the wire drawing experiment, the effectiveness of the proposed process design method was evaluated. The final drawing speed was increased from 1,100m/min to 2,000m/min without deterioration of final drawn wire.