Study on the defence R&D project risk analysis using AHP (AHP 기법을 이용한 국방연구개발사업 위험요인 분석에 관한 연구)

  • Eom, Jae-Seob;Kim, Seung-Bum
    • Journal of the Korean Data and Information Science Society
    • /
    • v.24 no.3
    • /
    • pp.557-569
    • /
    • 2013
  • Risk management activity for successful defense R&D project should be done anticipatorily and consistently over the entire project period and there should be a priority for management depending on importance of the risk factors. In this study, we verified the reliability and validity through factor analysis for the risk factors selected by the Delphi technique. We also obtained the relative importance of risk factors with analytic hierarchy process (AHP) and decided to prioritize for comparison of domestic and overseas research. According to the study, we found that it is important to settle the requirements and to classify the scope of R&D. It is also considered significant to have reasonable schedule for completion and secure the necessary resources in the early stage of project. Unlike previous studies, it appeared the technical factors are critical elements as well for defense R&D project.

Application of the 3D CAD Model Data for 4D Simulation and Quantity Estimation (4D 시뮬레이션 및 일정별 물량정보검색을 위한 3D 모델 정보 활용)

  • Lee Jae-Cheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.107-114
    • /
    • 2004
  • This paper represents the application of the 3D CAD Model data for 4D simulation and quantity estimation. These support the effective and practical use of 4D CAD model. By using and manipulating the 3D CAD model information, scheduling and quantity estimation could be developed more quickly and effectively. So the 3D CAD model information is made use of not only drawing a blueprint but also playing an important part of data integration platform. The scheduling module sets up the schedule generation logic that consists of period, priority of element arrangement, and time lag of floor placement. It sorts the working items as a priority of working process. And the quantity estimation module queries the material quantity of the structural elements according to the scheduling conditions. These two modules are developed using the 3D CAD model information and assist the function of 4D CAD model.

Analysis of Spectator Factors of Seongnam Football Club Spectators

  • Kim, So Hee;Kwon, Ki Hyun;Han, Seung Jin
    • Journal of Sport and Applied Science
    • /
    • v.5 no.2
    • /
    • pp.63-71
    • /
    • 2021
  • Purpose: The purpose of this study, we will evaluate and analyze the importance and performance of Seongnam Football Club visitors using IPA analysis to present new marketing strategies and improvement plans based on the basis of the audience's perception of the team's priority, low priority, and excessive effort. Research design, data, and methodology: In order to achieve the purpose of the study, the survey was conducted on 120 home spectators of Seongnam Football Club, and the analysis of the data was conducted using SPSS Window Version 21.0. Data were analyzed via frequency analysis, exploratory factor analysis, corresponding sample t-test, and IPA analysis. Findings are as follows. Results: First, the first quadrant showed 'The convenience of access to the stadium', 'Parking lot convenience', 'Tournament schedule guidance', 'Providing information about player', 'Providing information about the team', 'Ticket reservation method'. Second, the second quadrant showed 'Players' fan service', 'Cleanliness of toilets', 'A player's level of performance', 'Team's level of play', 'A match against a rival team'. Third, the third quadrant showed 'Indication of facility guidance', 'Seat comfort', 'Team's Star Player Possession', 'Various participation events', 'Gift recommendation'. Fourth, the fourth quadrant showed 'Player-related promotion through media', 'Promote match schedules through media', 'Entrance convenience', 'Ticket Price'. Conclusions: Based on these findings, Factor in first quadrant, fourth quadrant should be kept. On the other hand, factors in second quadrant should be improved as soon as possible while factors in third quadrant can be improved through new marketing strategies in the future. Future implications were discussed.

Spatial Scheduling in Shipbuilding Industry

  • Duck Young Yoon;Varghese Ranjan;Koo Chung Kon
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.106-110
    • /
    • 2004
  • In any large heavy industry like that of ship building, there exist a lot of complications for the arrangement of building blocks optimally for the minimal space consumption. The major problem arises at yard because of laxity in space for arranging the building blocks of ship under construction. A standardized erection sequence diagram is generally available to provide the prioritised erection sequence. This erection sequence diagram serves as the frame work. In order to make a timely erection of the blocks a post plan has to be developed so that the blocks lie in the nearest possible vicinity of the material handling devices while keeping the priority of erection. Therefore, the blocks are arranged in the pre-erection area. This kind of readiness of blocks leads to a very complex problem of space. This arises due to the least available space leading to an urgent need of an availability of intelligent spatial schedule without compromising the rate of production. There exists two critical problems ahead namely, the spatial occupation layout of pre-erection area and the emptying pattern in the spatial vicinity. The block shape is assumed be rectangular. The related input data's are the dates of erection (earliest as well as the latest), geometrical parameters of block available on pre-erection area, slack time and the like.

  • PDF

Real-time Acquisition of Three Dimensional NMR Spectra by Non-uniform Sampling and Maximum Entropy Processing

  • Jee, Jun-Goo
    • Bulletin of the Korean Chemical Society
    • /
    • v.29 no.10
    • /
    • pp.2017-2022
    • /
    • 2008
  • Of the experiments to shorten NMR measuring time by sparse sampling, non-uniform sampling (NUS) is advantageous. NUS miminizes systematic errors which arise due to the lack of samplings by randomization. In this study, I report the real-time acquisition of 3D NMR data using NUS and maximum-entropy (MaxEnt) data processing. The real-time acquisition combined with NUS can reduce NMR measuring time much more. Compared with multidimensional decomposition (MDD) method, which was originally suggested by Jaravine and Orekhov (JACS 2006, 13421-13426), MaxEnt is faster at least several times and more suitable for the realtime acquisition. The designed sampling schedule of current study makes all the spectra during acquisition have the comparable resulting resolutions by MaxEnt. Therefore, one can judge the quality of spectra easily by examining the intensities of peaks. I report two cases of 3D experiments as examples with the simulated subdataset from experimental data. In both cases, the spectra having good qualitie for data analysis could be obtained only with 3% of original data. Its corresponding NMR measuring time was 8 minutes for 3D HNCO of ubiquitin.

Assistant Professor, Department of Computer Engineering Pukyong Universisty (한국형 방송 프로그램 시스템 디코더 ASSP의 개발)

  • Jo, Gyeong-Yeon
    • The Transactions of the Korea Information Processing Society
    • /
    • v.3 no.5
    • /
    • pp.1229-1239
    • /
    • 1996
  • The increase of additional information broadcasting of TV demands a graphic overlay processor. This paper is about the design, implementation and testing of a graphic overlay processor called by KBPS decoder ASSP (Applicatio n Specific Standard Product) which is compliance with Korea Broadcast Programming System. KBPS decoder ASSP consists of embedded 8 bit microprocessor Z80, graphic overlay controller, KBPS schedule decoder, memory controller, priority interrupt controller, MIDI controller, infrared raccoon receiver, async scrial communication controller, timer, bus controller, universal parallel input-output port and serial-parallel interface. The 0.8 micron CMOS Sea of Gate is used to implement the ASSP in amount of about 31,500 gates, and it is running at 14.318MHz.

  • PDF

A study on the station traffic control system design concerning local traffic (로컬트래픽을 고려한 역시스템 설계에 관한 연구)

  • Kim Young-Hoon;Hong Soon-Heum;Park Bum-Hwan;Kim You-ho;Lee Young-Soo;Ahn Jin;Kim Eun-Hee
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.825-830
    • /
    • 2005
  • Traffic control is the center of the railway traffic control system. The main objective of railway traffic control system is to minimize delays, providing the customers with on-time train operating service according to the given train schedule. Particularly, within the station control area, the departure & arrival of train. the decision on the train priority and the shunting of train are decided by the authority of the local traffic controller. Therefore, it is necessary to have a lot of information and communications between each departments. And for such decision making of the local traffic controller, not only the communication between each stations are needed, but also the communication between other stations are needed too. In this paper, we have analyzed the main work of the local traffic controller in large scale stations and have designed the station traffic control system needed to be built within the station considering the local traffic. And we have proposed not only the communication with other system within station, but also the communication methods for communications with the neighboring stations.

  • PDF

Optimum Allocation of Ships Emphasizing the Cargo Delivery Time (화물의 인도시기를 최우선으로 하는 배선문제)

  • 이중우;양시권;이철영
    • Journal of the Korean Institute of Navigation
    • /
    • v.5 no.1
    • /
    • pp.1-23
    • /
    • 1981
  • As far as transportation problems are concerned, the minimization of transportation cost is the most prevailing object. But in some cases, the cargo delivery time is the utter problem rather than the cost. For instance, we may imagine the case that the delivery of the construction materials is delayed behind the schedule and this makes the construction cost increased because of idle time of other materials and man power, in addition to the indemnity. Therefore the allocation of ships, in marine transportation which is now the main route of overseas trade, to the needed area on the required time is to be appropriately performed. However, there are several restrictions for cargo delivery to meet the demand, such as ship's size, number to be employed and cargo handling capacity of the ports, etc. And there are some other factors to be considered, that is, the degree of necessities of commodities, on their kinds, amount, and the time of arrival, etc. This paper deals with the problem of optimum allocation of ships emphasizing the cargo delivery time adopting Linear Programming technique with those cargo delivery restrictions and factors transformed by introducing the multi-speed conception, the conversion of multi-commodity to a single commodity, allowable delivery time, weight penalty number and nominating priority. This paper presents a case of optimum allocation of ships in the light of cargo delivery time for a construction company which has two different construction places and analyzes the result. This study will give a planner a good tool for optimum planning of maring transportation and be used for decision of schemes.

  • PDF

Performance Analysis of Buffer Aware Scheduling for Video Services in LTE Network

  • Lin, Meng-Hsien;Chen, Yen-Wen
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.9
    • /
    • pp.3594-3610
    • /
    • 2015
  • Recent advancements in broadband wireless communication technologies enable mobile users to receive video streaming services with various smart devices. The long term evolution (LTE) network provides high bandwidth and low latency for several emerging mobile applications. This paper proposes the buffer aware scheduling (BAS) approach to schedule the downlink video traffic in LTE network. The proposed BAS scheme applies the weighting function to heuristically adjust the scheduling priority by considering the buffer status and channel condition of UE so as to reduce the time that UE stays in the connected state without receiving data. Both of 1080P and 2160P resolution video streaming sources were applied for exhaustive simulations to examine the performance of the proposed scheme by comparing to that of the fair bandwidth (FB) and the best channel quality indicator (CQI) schemes. The simulation results indicate that the proposed BAS scheme not only achieves better performance in power saving, streaming delivery time, and throughput than the FB scheme while maintaining the similar performance as the best CQI scheme in light traffic load. Specifically, the proposed scheme reduces streaming delivery time and generates less signaling overhead than the best CQI scheme when the traffic load is heavy.

DEVELOPMENT OF STRATEGIES FOR APPLICATION OF 4D MODELING IN CONSTRUCTION MANAGEMENT

  • Yang-Taek Kim;Chang-Taek Hyun ;Kyo-Jin Koo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1181-1186
    • /
    • 2005
  • In many construction projects, progress and efficiency are hampered by poor communication of discipline-specific models. For example, architects use 2D or 3D CAD models and builders use CPM diagrams, Gantt charts, and spreadsheets to show their view of the project. Nowadays, advanced computer visualization tools, 4D CAD or VR, can show these disparate models to understand cross-disciplinary impacts of design and construction decisions. In Korea, several leading companies have tried to apply these tools to their pilot projects from the design phase to the maintenance phase. These companies have expected that more project stakeholders could understand a construction schedule more quickly and completely with 4D visualization than with the traditional construction management tools. However, modeling of the 4D CAD or VR can be quite time-consuming and expensive to generate manually and has therefore limited the spread and use of these models. In order to adopt widely those models in construction industry, the areas that those tools could support to take large benefits in diverse functional areas of construction management need to be analyzed. In this study, researchers analyze the usefulness and limitations of the 4D models and VR in the construction industry, develop the strategy of application priority, and improve the 4D modeling method.