• 제목/요약/키워드: preventive maintenance model

검색결과 168건 처리시간 0.026초

Optimal Preventive Maintenance Policy Based on Aperiodic Model

  • Kim, Hee-Soo;Yum, Joon-Keun;Park, Dong-Ho
    • 한국신뢰성학회:학술대회논문집
    • /
    • 한국신뢰성학회 2000년도 추계학술대회
    • /
    • pp.335-342
    • /
    • 2000
  • Preventive maintenance(PM) is an action taken on a repairable system while it is still operating, which needs to be carried out in order to keep the system at the desired level of successful operation. The PM improves the reliability of the system by predicting the possible failures and thereby preventing such failures from its occurrence. In this paper, we develop the optimal preventive maintenance policies based on the aperiodic PM model. We investigate an aperiodic preventive maintenance policy and propose several optimal PM policies which minimize the expected cost over an infinite time span. Park, Jung and Yum(2000) determine the optimal period and the optimal number of PMs based on Canfield's(1986) periodic model. Our techniques to derive the optimal preventive maintenance policies based on our aperiodic PM model is similar to those in Park, Jung and Yum(2000), which can be considered as the special case of our results.

  • PDF

비재생무료교체-수리보증이 종료된 이후의 예방보전모형 (Preventive maintenance model following the expiration of NFRRW)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제22권4호
    • /
    • pp.775-784
    • /
    • 2011
  • 본 논문에서는 비재생무료교체-수리보증이 종료된 이후의 수리가 가능한 시스템에 대한 주기적인 예방보전모형을 고려한다. 이러한 예방보전모형에 대하여 기대순환길이, 총기대비용 그리고 단위시간당 기대비용을 각각 유도하고자 한다. 또한 유도된 단위시간당 기대비용을 최소화하는 최적의 예방 보전주기와 예방보전횟수를 결정하는 방법에 대하여 자세히 설명한다. 끝으로 고장시간이 와이블분포를 따르는 경우에 최적의 주기적 예방보전정책을 결정하여 본다.

설비예방보전을 위한 TBM의 최적보전주기 설정모델 연구 (A Research on the Determining Model of the Optimizing Maintenance Interval in TBM for the Preventive Maintenance of Facilities)

  • 권오운;이홍철
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회/대한산업공학회 2003년도 춘계공동학술대회
    • /
    • pp.105-117
    • /
    • 2003
  • The purpose of this research aimed at performing the easy design. and also the easy on-the-job application or the maintenance interval determination methodology by presenting the determining model or the optimizing maintenance interval in TBM for the preventive maintenance or facility TBM(time-based maintenance) as the preventive maintenance requires the adequate determination or the maintenance interval. The maintenance interval or TBM shall be applied differently for the each interval such as He patrol inspection, maintenance, overhaul inspection. exchange. And it is based on the composition level of equipment. The already informed theories or interval determination methodology for the patrol inspection. repair. and overhaul inspection are difficult for adopting because or the several restriction problems in applying the maintenance schemes as the theory So, the model for determining the optimizing exchange interval or part, maintenance interval of auxiliary machine, unit equipment etc. was presented to apply in the maintenance easily and appropriately.

  • PDF

두 가지 고장형태를 고려한 생산 및 예방보전 정책 (A Production and Preventive Maintenance Policy with Two Types of Failures)

  • 김호균;조형수
    • 품질경영학회지
    • /
    • 제30권3호
    • /
    • pp.53-65
    • /
    • 2002
  • This paper studies an economic manufacturing quantity (EMQ) model with two types of failures and planned preventive maintenance of the production facility. One is a type I (major) failure which should be corrected by a failure maintenance and the other is a type H (minor) failure which can be minimally repaired without interrupting the production run. The objective is to determine the lot size and preventive replacement policy minimizing the long-run expected cost per unit time. We consider a control policy with a constant production lot size and preventive maintenance after completing n production runs. It is assumed that both preventive and failure maintenance times are random and the demand arriving during a stock-out period is lost. An expression for the expected cost per unit time is obtained in the general case. A special case is discussed and numerical results are provided.

연장된 보증을 갖는 예방보전모형 (Preventive maintenance model with extended warranty)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제24권4호
    • /
    • pp.773-781
    • /
    • 2013
  • 최근에 기본 보증이 종료된 이후에 주어지는 시스템의 연장된 보증에 대한 관심이 증가되고 있다. 따라서 본 논문에서는 사용자 측면에서 최소수리보증이 있는 연장된 보증이 종료된 이후의 예방보전모형을 제안하였다. 이 때, 기본 보증과 연장된 보증 하에서 고장이 발생된 시스템에는 판매자에 의해서 무료로 최소수리가 이루어진다. 이러한 제안된 예방보전모형에 대하여 기대순환길이, 총기대비용 그리고 단위시간당 기대비용을 유도하였다. 또한, 유도된 단위시간당 기대비용을 최소화 하는 최적의 예방보전 주기와 예방보전 횟수를 결정하였다. 끝으로 시스템의 고장시간이 와이블 분포를 따를 때 수치적 예를 통하여 이를 설명하였다.

비용을 고려한 발전설비의 예방유지보수 계획 수립 (Establishment of Preventive Maintenance Planning for Generation Facility Considering Cost)

  • 김형준;신준석;김진오;김형철
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2007년도 춘계학술대회 논문집
    • /
    • pp.328-333
    • /
    • 2007
  • Traditional maintenance planning is based on a constant maintenance interval for equipment life. In order to consider economic aspect for tm based preventive maintenance, preventive maintenance is desirable to be scheduled by RCM(Reliability-Centered Maintenance) evaluation. The main objective of RCM is to reduce the maintenance cost, by focusing on the most important functions of the system and avoiding or removing maintenance actions that are not strictly necessary. So, Markov state model is utilized considering stochastic state in RCM In this paper, a Markov state model much can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by the stepwise Markov model in detail. Also, because the system is not continuously monitored, the inspection is considered. In case study, simulation results about RCM will be shown using the real historical data of combustion turbine generating unit in Korean power systems.

  • PDF

Markov State Model을 이용한 복합화력 발전설비의 최적의 유지보수계획 수립 (Application Markov State Model for the RCM of Combustion turbine Generating Unit)

  • 신준석;이승혁;김진오
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.357-359
    • /
    • 2006
  • Traditional time based preventive maintenance is used to constant maintenance interval for equipment life. In order to consider economic aspect for time based preventive maintenance, preventive maintenance is scheduled by RCM(Reliability-Centered Maintenance) evaluation. So, Markov state model is utilized considering stochastic state in RCM. In this paper, a Markov state model which can be used for scheduling and optimization of maintenance is presented. The deterioration process of system condition is modeled by a Markov model. In case study, simulation results about RCM are used to the real historical data of combustion turbine generating units in Korean power systems.

  • PDF

Stochastic analysis of a non-identical two-unit parallel system with common-cause failure, critical human error, non-critical human error, preventive maintenance and two type of repair

  • El-Sherbeny, M.S.
    • International Journal of Reliability and Applications
    • /
    • 제11권2호
    • /
    • pp.123-138
    • /
    • 2010
  • This paper investigates a mathematical model of a system composed of two non-identical unit parallel system with common-cause failure, critical human error, non-critical human error, preventive maintenance and two type of repair, i.e. cheaper and costlier. This system goes for preventive maintenance at random epochs. We assume that the failure, repair and maintenance times are independent random variables. The failure rates, repair rates and preventive maintenance rate are constant for each unit. The system is analyzed by using the graphical evaluation and review technique (GERT) to obtain various related measures and we study the effect of the preventive maintenance preventive maintenance on the system performance. Certain important results have been derived as special cases. The plots for the mean time to system failure and the steady-state availability A(${\infty}$) of the system are drawn for different parametric values.

  • PDF

최소수리보증 이후의 예방보전모형 (Preventive Maintenance Model after Minimal Repair Warranty)

  • 정기문
    • Communications for Statistical Applications and Methods
    • /
    • 제17권6호
    • /
    • pp.865-877
    • /
    • 2010
  • 본 논문에서는 보증기간이 종료된 이후의 수리가 가능한 시스템에 대한 주기적인 예방보전모형을 고려하는데, 무료수리보증, 비례수리보증 그리고 혼합수리보증과 같은 세 종류의 수리보증정책을 고려한다. 이러한 세 종류의 수리보증기간이 종료된 이후의 수리가 가능한 시스템에 대한 주기적인 예방보전모형에 대하여 각각 기대순환길이, 총기대비용 그리고 단위시간당 기대비용을 유도한다. 또한 유도된 단위시간당 기대 비용을 최소화하는 최적의 예방보전정책인 최적의 예방보전주기와 예방보전횟수를 결정하는 방법에 대하여 설명한다. 끝으로 고장시간이 와이블분포를 하는 경우에 최적의 주기적 예방보전정책을 결정하여 본다.

불완전보전을 고려한 시스템의 최적 정기 예방보전 시기 (Optimum Periodic Preventive Maintenance Time for a System with Imperfect Maintenance)

  • 정영배
    • 산업경영시스템학회지
    • /
    • 제17권32호
    • /
    • pp.221-226
    • /
    • 1994
  • Almost preventive maintenance policies assumed that the system after pm has failure rate as before pm with probability p and as good as new with probability 1-p. This paper considers the s-expected cost of the model with imperfect periodic preventive maintenance that increasing minimal repair costs at failure and obtains the optimum periodic preventive maintenance time. Numerical example are shown in which the failure time of the system has gamma distribution.

  • PDF