• Title/Summary/Keyword: present value of net benefit

Search Result 95, Processing Time 0.026 seconds

Development of Cost-Benefit Analysis Model for GIS Projects (GIS사업의 비용편익분석 모형개발)

  • Kim, Jung-Ok;Heo, Yong;Yu, Ki-Yun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.12 no.1 s.28
    • /
    • pp.79-85
    • /
    • 2004
  • The GIS(Geographic Information System) projects require big initial investment and cost of maintenance. Decision makers would not launch GIS projects unless they are convinced of the benefits of the projects. Therefore the purpose of this paper is to develop an appropriate model for GIS project evaluation. We proposed a GIS project evaluation model and summarize the steps involved in Cost-Benefit Analysis(CBA). The costs of a GIS implementation include hardware and software cost, costs of database development, training expenses, annual maintenance expenses, and other annual expenses. The benefit by using GIS has been assessed into Type I(direct benefits), Type II(indirect benefits), Type III(benefits that result from the sale of information services), Type IV(intangible benefits).

  • PDF

Review on the Pertinent Discount Rate for the Public Investment Project (공공투자사업(公共投資事業)의 적정(適正) 할인율(割引率) 검토(檢討)에 관(關)한 연구(硏究))

  • Park, Jae Keun;Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.30 no.1
    • /
    • pp.89-101
    • /
    • 2003
  • For the pre-feasibility study and project evaluation, the discount rate or cutoff rate should be given by the government authority. To get the Benefit/Cost Ratio, NPV(Net Present Value) and IRR(Internal Rate of Return) of the public investment projects, the pertinent and realistic discount rate should be determined to be suitable to the present time period. The cut-off rates in Korea were equivalent to 15% in 1970's, 10% in 1980's and 8% in 1990's. The prevailing rate of discount as 8% is considered not to be suitable for the 2000's public project appraisal considering the present interest rates on deposit and national bonds. To determine the socio-economic feasibility of the public projects, the IRR should be bigger than the present cutoff rate. When we still use the high old rate of discount, the analytical results of project appraisal will show always economically unfeasible. Therefore the new rate of discount suitable for present time should be determined by the government. The public projects to be implemented in 2000 year onward are recommended to be adapted 5% of cutoff rate for the project appraisal and evaluation according to the results of reviewing the tendency of discount rates and market rates of interest in Korea.

  • PDF

A Study on the Business Feasibility of Marine Leisure Ship

  • Jung-Suk Choi;Kyoung-Hoon Choi
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.3
    • /
    • pp.288-295
    • /
    • 2023
  • The purpose of this study is to evaluate the feasibility of the new marine leisure ships. In order to achieve the research purpose, the cost and income were calculated based on the operating of other marine leisure ships, and the feasibility of the project was empirically analyzed. This study established a research model that applies the values derived by empirically analyzing ships with similar specifications, to the new marine leisure ships. We then calculated the cost-benefit analysis, net present value, and internal return, and evaluated the feasibility of the project based on this. As a result of the business feasibility analysis of investing in marine leisure ship, it was found that economic feasibility exists with a B/C of 1.042 and 1.049 for new and secondhand ships, respectively; however, considering the stability of the ship and the publicity and continuity of the business operation, it is recommended to invest in new ships compared to secondhand ships. The total benefit over the 10-year operating period using a social discount rate of 4.5% was evaluated to be about KRW 292.0 billion, which is higher than the total cost of KRW 256.6 billion. In conclusion, the profitability analysis showed that the B/C was 1.042, the NPV was KRW 193 billion, and the IRR was 2.1%, which indicates that profitability is weakly secured.

Direct Economic Effects and Optimal Vessel Reduction Scales in Coastal and Offshore Fisheries (연근해어업 어선감척 적정 목표량 산정 및 감척효과 분석)

  • SHIN, Yong-Min;KIM, Jin-Sang;LEE, Jeong-Min;NAM, Jong-Oh
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.27 no.3
    • /
    • pp.821-832
    • /
    • 2015
  • The aims of this study are to estimate the optimal vessel reduction scales and these direct economic effects of coastal and offshore fisheries in the Republic of Korea. To estimate respectively optimal fishing efforts of individual fishery by species in coastal and offshore fisheries, we adopted appropriate fishing power of each species published by National Fisheries Research and Development Institute and also considered biological and socio-economic factors such as the bycatch rate, the profit rate, the efficiency of resource use, the average age of fishing vessel, the intention of vessel reduction, and the annual changes in vessels by other factors. The direct economic effects of the optimal vessel reduction in coastal and offshore fisheries based on maximum sustainable yield and 2/3 maximum sustainable yield was calculated by a cost-benefit analysis. This study showed that optimal reduction numbers of vessels engaged in coastal and offshore fisheries were 4,431 and 374 vessels and the direct economic effects in coastal and offshore fisheries were about 371.7 and 569.4 billion won and these NPV and BCR were 111.7 billion won and 1.65 and 342.6 billion won and 4.97 respectively.

Fishermen's Perception and Economic Feasibility of Inland Waters Ranching Project : Focusing on the Branches of Geum River (내수면목장화사업의 어업인 인식도 및 경제효과 : 금강 지천을 중심으로)

  • Hwang, Jin-Wook
    • The Journal of Fisheries Business Administration
    • /
    • v.53 no.2
    • /
    • pp.1-20
    • /
    • 2022
  • This study is aimed to analyze fishermen's perception and the economic feasibility of inland waters ranching project on the branches of Geum River. Analysis of fishermen's perception on the branches of Geum River showed that fishermen had an affirmative response on the inland freshwater ranching project related issues such as fisheries resources enhancement, necessity of project, economic achievement as so on. The model of inland waters ranching project on the branches of Geum River is designed to fisheries resources enhancement, habitat compositiom, ecology tours, use and management of resources. The results of the economic feasibility of inland waters ranching project on the branches of Geum River were internal rate of return (IRR) was 18.43%, a benefit-cost ratio was shown to be 1.54, net present value (NPV) was 4,929 thousand won, which indicates the economic feasibility of inland waters ranching project.

Policy Directions to Enhance Economic Feasibility of Agrivoltaics in Korea (영농형 태양광 경제성 제고를 위한 정책 방안)

  • Jong-Ik Kim;Sangmin Cho
    • New & Renewable Energy
    • /
    • v.20 no.1
    • /
    • pp.15-25
    • /
    • 2024
  • This study analyzes the economic feasibility of agrivoltaics in South Korea. The key findings are as follows. It was ascertained that an amendment to the Farmland Act, which currently has an 8-year permit period, is necessary to ensure the economic feasibility of agrivoltaic projects. Furthermore, economic feasibility improves when agrivoltaic projects are financed, as against cases without financing. Furthermore, the availability of low-interest loans through financial support programs significantly enhances economic feasibility. Scaling up projects leads to cost savings due to economies of scale, while community-based agrivoltaic initiatives generate higher revenue through the acquisition of additional Renewable Energy Certificates. These factors can help improve the economic feasibility of agrivoltaic projects. These incentives are emphasized as they can serve as a source of funding to foster community acceptance of agrivoltaic projects.

Economic Feasibility Analysis of Marine Ecosystem Restoration Technology Program (해양생태계 복원기술개발 사업의 경제적 타당성 분석)

  • Kwon, Young-Ju;Paik, Sang-Kyu;Yoo, Seung-Hoon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.2
    • /
    • pp.130-142
    • /
    • 2014
  • The Korean government is considering implementation of the marine ecosystem restoration technology program (MERTP) to analyze the current status of the marine ecosystems and causes for the ecosystem deterioration as well as to eventually establish a master strategic plan for restoring ecosystem functions and preventing ecosystem functional loss. In order to determine likelihood of successful implementation, it is essential to perform an analysis of the economic feasibility of the program. The present study assessed economic feasibility of the MERTP. To this end, the dichotomous choice contingent valuation (CV) method is used. In particular, dichotomous choice (DC) format is employed as a method of eliciting willingness-to-pay (WTP) response to incentive-compatible mechanisms. The study also employed the spike model to deal with zero WTP responses from the DC CV survey. This survey of 1,000 randomly selected households in accordance with the guidelines provided by the National Oceanic and Atmospheric Administration (USA) was carried out nationwide in 2013. And, the respondents were asked in person-to-person interviews about their WTP for implementing the MERTP. The results showed that the annual mean WTP was estimated to be 5,414 won per household. Consequently, the annual benefit from the MERTP would be about 98.6 billion won for the next five years. Economic feasibility assessment utilizing the MERTP investment cost and expansion cost of the value provided that net present value, benefit/cost ratio, and internal rate of return are 337.8 billion won, 5.20, and 65.9 %, respectively, which are bigger than 0, 1.0, and 5.5 %, and that the MERTP passes the cost-benefit analysis.

A Study on Economic Analysis of Development of On-line Diagnosis Technique for Preventing Electrical Accidents (전기설비사고예방을 위한 온라인진단기술 개발의 경제성 분석)

  • Kim, Han-Sang;Kim, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.2
    • /
    • pp.313-318
    • /
    • 2014
  • In the last couple of decades industrialization and technological development has not only increase in the scale of electrical facilities and it has become more and more complicated and diversified. Furthermore, fires in the electrical transformers, like those that have knocked out power in the country in the past years, are likely to become more common as utility systems begin to show their age. The importance of preventing electrical accidents can never be overemphasized and for this reason, supply of on-line diagnosis system combining information and communication technology(ICT) for the customer's electrical facilities has been increasing recently. The major advantage of on-line diagnosis system is that the device's potential problems could be detected early before a serious deterioration or breakdown occurs. In this paper, We estimated the benefit from the investment in the right of present value of sales, success rate of commercialization regarding R&D investment for development and commercialization of on-line diagnosis technology targeting customer electrical facilities. As a result, the net value added of 29.7 billion won and the increased profit by roughly 7.52 precent are expected.

A Case Study on Investment Evaluation of Hadong T/P(Thermal Power) Port

  • Kim, Myoung-Hee;Lee, Ki-Hwan;Jang, Ji-Tae
    • Journal of Navigation and Port Research
    • /
    • v.39 no.2
    • /
    • pp.99-105
    • /
    • 2015
  • Until recently, thermal power plants have used high-rank coals to generate electricity. The switched to low-rank coals, primarily because of the rising coal price and the advancement of combustion technology. Therefore the thermal power plants need more fuels aspect of quantity and they are going to build extra infrastructure to deal with the increased fuel demand in their specialized ports. This paper introduces the process of the economic analysis as a case study for Hadong T/P(Thermal Power) Port. This study also evaluates investment for mew projects in ports. We analyze the costs and benefits of the port investment project using various information. And then we conduct the economic analysis using NPV(net present value), B/C ratio and IRR grounded in a financial theory. Out result of the economic feasibility shows that the new project of constructing a third berth in Hadong T/P Port has positive economic value. Additionally, this study conducts the sensitivity analysis of the major variables like cost, benefit and discount rate.

The Economic Feasibility Analysis of Busan Central Library Construction - For the Four Candidate Sites - (부산대표도서관 건립의 경제적 타당성 분석 - 4곳의 후보지를 대상으로 -)

  • Kang, Hee-Kyung;Chang, Durk-Hyun;Lee, Soo-Sang
    • Journal of Korean Library and Information Science Society
    • /
    • v.45 no.4
    • /
    • pp.409-428
    • /
    • 2014
  • The purpose of this study is to analyze the economic feasibility of Busan Regional Central Library. The four candidate sites were included for the analysis. To achieve the purpose of this study, we applied three types of indices such as Benefit-Cost analysis, Net Present Value, and Internal Rate of Return. We used CVM(Contingent Valuation Method) to calculate the benefit; we conducted two investigations to calculate WTP, which are for pretest and for main survey. From results of pretest, we designed five optimal prices. On the basis of them, main survey was accomplished to figure out WTPs for four candidate sites. The results show that four candidate sites were all feasible from an economic point of view. Of these, the Busan Citizen Park site got the highest point of B/C ratio.