• Title/Summary/Keyword: preliminary cost estimation

Search Result 60, Processing Time 0.033 seconds

A Proposal of Modeling Guide of the Unit Space-based Preliminary Cost Estimation in Urban Renewal Mix-Used Development - Case Study on ○○ Transfer Station Complex - (복합용도 개발 도시재생 사업에서의 단위 공간 기반 개산견적 모델링 가이드 제안 - ○○시 ○○역 복합환승센터 사례를 중심으로 -)

  • Kang, Shin-Yeop;Ahn, Jae-Hong;Kim, Ju-Hyung
    • Journal of KIBIM
    • /
    • v.3 no.1
    • /
    • pp.11-20
    • /
    • 2013
  • Mix-used development in urban renewal project is done to effectively utilize the limited downtown. Generally unlike a single project, It features placing a large number of different facilities(residential, commercial, business, cultural, etc.) which is each other organically linked. The purpose of this study is to suggest the method of modeling guide for 3D preliminary cost estimation considering visual and intuitive judgement of space in mix-used development Urban Renewal project. In this research, introducing SME(Standard Module and Element) breakdown structure, FID(Finish Identity) for estimating building space unit-based quantity take off was implemented. It could narrow the discrepancy of opinion between the stakeholders with more accurate cost-estimates, comparing to the traditional methods.

Preliminary design and cost estimation of helicopters (회전익 항공기의 기본설계 및 가격예측 연구)

  • Lee, Choong-Yun;Ko, Kwang-Ho;Jung, Sung-Nam;Yu, Yung-Hoon
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.38 no.4
    • /
    • pp.309-314
    • /
    • 2010
  • In this work, the helicopter price estimation formula from Harris & Scully is revised and updated for more accurate prediction of the current prices of helicopters which can be applied in the preliminary design stage. As many as 74 helicopter price and sizing data after the year 1997 are newly included to the out-dated coefficients in the cost estimation formula. In addition, the updated price estimation formula is added to Tishchenko's preliminary sizing method for price consideration in the preliminary design stage. Sikorsky's S-76C+ helicopter is used along with other various helicopters for comparison and validation of the sizing code as well as the new updated price estimation formula.

The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge (RC라멘교의 기본설계단계 개략공사비 산정모델)

  • Kim, Byung-Soo;Kwon, Suk-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.111-120
    • /
    • 2009
  • The conceptual cost estimation used the construction project needs for confirm budget not only at the planning phase but also at the preliminary design phase of the construction project. Present, the conceptual cost estimation model have problems the rate of error is very large because the linear simple model calculate by use the cost of the unit meter or the unit square. This study development the model used grouping and the key quantity method, the mixed unit cost for solve problem of the very large rate of error. The result of this study reduced difference of between the real design construction cost therefor it expect that contribute to the client or the service company estimate budget of RC rahmen bridge.

Case Study on the Cost Estimation standard for Smart Construction - Focused on Japan (스마트건설 공사비산정기준 사례조사 연구 - 일본사례를 중심으로 -)

  • Song, Tae-Seok;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.171-172
    • /
    • 2020
  • Recently, the need for smart construction technologies related to the Fourth Industrial Revolution has been increasing in order to improve productivity of the construction industry. The Ministry of Land, Infrastructure and Transport has established Smart construction technology road map to commercialize the smart construction, and research and development is also underway. However, due to the lack of cost estimation standards for such smart construction technologies to be deployed to actual sites, smart construction technologies are not actively applied to construction sites. In particular, cost estimation standards are needed for construction machinery equipment with ICT technology that is currently available for commercialization. Therefore, as a preliminary study for the development of smart construction cost estimation standards, a case study was conducted on ICT construction estimation standards in Japan and present them as basic data for standards in Korea.

  • PDF

Improvement of BoQ Documents for the BIM based Quantity Takeoff (BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안)

  • An, Ji-Won;Yun, Seok-heon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

A Study on the Evaluation Method of Green Remodeling Considering LCA and LCC (LCA 및 LCC를 고려한 환경친화적 리모델링의 평가방법에 관한 연구)

  • Lee, Gwan-Ho;Kim, Nam-Gyu;Rhee, Eon-Ku
    • Journal of the Korean Solar Energy Society
    • /
    • v.23 no.1
    • /
    • pp.57-67
    • /
    • 2003
  • This study aims to presents Evaluation Method of Green Remodeling that analyze the value of environment through expense, using the method of life cycle cost and life cycle assessment simultaneously. The results of this study are summarized as follows. Evaluation Model developed in this study can convert economical value of environment into cost by integrating. In addition, the model can apply as a useful tool to estimation of economical design alternative as well as quantification of environmental loads and costs. Evaluation Model presented In this study observe energy consumption and the environmental load emission with qualification, it can forecast effect of environmental cost that cost estimation is expected to be added to energy cost rate by being possible. Synthetically, when Estimation Model and computer program that developed in this study is applies to the construction industry; reasonable management of environmental load is convenient at each step of Green Remodeling. In addition, at preliminary design phase, practical use may be possible by reasonable yardstick about various alternatives and improvement of design alternatives likewise by grasping environmental effect.

Development of a model for an equation for estimating construction costs based on the resource-based cost estimating system for TBM (TBM 공법의 자원기반 적산 방식에 의한 개산 공사비 예측 식 모델 개발)

  • Han, Seung-Hee;Park, Hong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.3
    • /
    • pp.1474-1480
    • /
    • 2013
  • This study attempted to estimate construction costs in accordance with the resource-based cost estimation (unit cost price) system by diameter for TBM method, and analyzed the direct cost and the total cost. Based on such figures, this study performed a regression analysis and proposed a model for an equation for estimating construction costs. model for the resource-based cost estimation (unit cost price) system classified by diameter for TBM method proposed by this study can be effectively applied to business planning, preliminary investigation, feasibility study, construction cost estimations in the early design stages.

Roadway Preliminary Cost Estimation Prototype based on BIM and GIS (BIM/GIS 기반 도로 개략공사비 산정 프로토타입 연구)

  • Park, Wonyoung;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.14-21
    • /
    • 2013
  • While a detailed cost estimation utilizes the comprehensive quantity information obtained from a complete drawing and specification, an approximate cost estimation heavily relies on the subjective decisions. This phenomenon is because the approximate estimation is usually conducted in early stage of the construction phase where the drawing and specification are not available. This study developed a roadway construction cost estimation system which enables users to estimate the approximated cost of the project in early stage. The system identifies the variation of the construction costs due to the road route change using a cased based reasoning(CBR) method. Overall the system is expected to improves the accuracy and effectiveness of the estimation process, because it would provide users with increased accessability and consistent results in early stage of the project which leaded to the increased work transparency.

A Study on the Model of Artificial Neural Network for Construction Cost Estimation of Educational Facilities at Conceptual Stage (교육시설의 개념단계 공사비예측을 위한 인공신경망모델 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Chung-Yung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.91-99
    • /
    • 2006
  • The purpose of this study is propose an Artificial Neural Network(ANN) model for the construction estimate of the public educational facility at conceptual stage. The current method for the preliminary cost estimate of the public educational facility uses a single-parameter which is based on basic criteria such as a gross floor area. However, its accuracy is low due to the nature of the method. When the difference between the conceptual estimate and detailed estimate is huge, the project has to be modified to meet the established budget. Thus, the ANN model is developed by using multi-parameters in order to estimate the project budget cost more accurately. The result of the research shows 6.82% of the testing error rates when the developed model was tested. The error rates and the error range of the developed model are smaller than those of the general preliminary estimating model at conceptual stage. Since the proposed ANN model was trained using the detailed estimate information of the past 5 years' school construction data, it is expected to forecast the school project cost accurately.