• Title/Summary/Keyword: prefabricated system

Search Result 138, Processing Time 0.026 seconds

Evaluation of Heating and Cooling Thermal Output Characteristics of Prefabricated Steel Wall Panel System for Radiant Heating and Cooling (강판 마감형 조립식 벽패널 복사냉난방시스템의 냉난방 방열 특성 평가)

  • Lim, Jae-Han;Koo, Bo-Kyoung;Kim, Sung-Im;Song, Seung-Yeong
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.2
    • /
    • pp.70-77
    • /
    • 2013
  • Recently the radiant panel heating and cooling system has been regarded as an alternative of low temperature heating and high temperature cooling by applying the renewable energy sources to the heating and cooling of buildings. Especially this system can be used as HVAC system alternatives in super high-rise buildings for energy saving and thermal comfort. Also it can be possible to reduce the plenum space because the minimum ventilation air will be supplied into the space. This study focused on the evaluation the basic characteristics of thermal output in prefabricated steel wall panel system for radiant heating and cooling. In order to evaluate the thermal output according to both various supply water temperatures and supply water flow rates, three-dimensional dynamic heat transfer analysis was performed. As results, for the heating mode, thermal output increased by 26% with the supply temperature increasing by $5^{\circ}C$. The surface temperature of panels range within $1{\sim}3^{\circ}C$. For the cooling mode, thermal output decreased by 18.2% with the supply temperature increasing by $2^{\circ}C$. The surface temperature of panels range within $0.5{\sim}1^{\circ}C$ and it was shown the even temperature distribution.

Application of Enhanced Soil Vapor Extraction Using PVDs (연직배수재를 이용한 토양증기추출법의 적용)

  • Shin, Eun-Chul;Park, Jeong-Jun;Kim, Jong-In;Choi, Min-Guen
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.382-388
    • /
    • 2005
  • Soil vapor extraction(SVE) is an effective and cost efficient method of removing volatile organic compounds(VOCs) and petroleum hydrocarbons from unsaturated soils. However, soil vapor extraction becomes ineffective in soils with low gas permeability, for example soils with air permeabilities less than 1 Darcy. Prefabricated vertical drains(PVDs) have been used for dewatering fine-grained soils for more than 25 years. Incorporating PVDs in and SVE system can extend the effectiveness of SVE to lower permeability soils by shortening the air flow-paths and ultimately expediting contaminant removal. The objective of the work described herein was to effectively incorporate PVDs into a SVE remediation system and to demonstrate a PVDs enhanced SVE system at full scale. The finding from this research will facilitate the design of field PVD-SVE systems in terms by providing insight into the optimal spacing between PVDs, the radius of influence of the wells and the flow rates to be used to capture and extract gas phase contaminants.

  • PDF

A Study on the Technical Development for the Exterior Wall System of Container House (컨테이너 하우스 외벽 구성 시스템 기술개발연구)

  • 김환식;백기영
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.2 no.2
    • /
    • pp.57-63
    • /
    • 2001
  • This paper aims at searching the attentiveness and method in planning. design and construction procedure of the container house system where container is used as core framework. For this. we try to produce researching fundamental materials for the construction performance and design standards of steel house, and finish the sample exterior wall system of the container house. By applying this sample system to the two case study of container housing construction we find out that there are considerable efnciency of the cost saving and catch up schedule compared with existing brick housing construction system. This study is significant in that it shows future direction of technical development and investment on the prefabricate housing market through development of the prefabricated container housing system.

  • PDF

Comparison of removal torque between prefabricated and customized abutment screw (기성품과 맞춤형 임플란트 지대주 나사의 풀림 토크 비교)

  • Jamiyandorj, Otgonbold;Kim, Jee-Hwan;Kim, Mu-Seong;Park, Young-Bum;Shim, June-Sung
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.50 no.4
    • /
    • pp.243-248
    • /
    • 2012
  • Purpose: The purpose of this study is to compare the removal torque between prefabricated and customized implant abutment screw. Materials and methods: Three types of implant system (Osstem, Astra, Zimmer) were used. For each system, prefabricated abutment screw (control group) and customized abutment screw (test group) were used to connect the fixture and the abutment (n = 6). Digital torque gauze was used to control the tightening torque and the screws were tightened under each manufacturer's recommendation. 10 minutes after the connection the same tightening torque was applied, and 5 minutes after the second connection, the removal torque was measured. This procedure was repeated 10 times. In the cyclic loading test, 10 minutes after the first connection to the 6 groups (n = 3), the same tightening torque was applied, and a total of 1,000,000 time loading was applied at 30 degree angle to long axis with 50 N load. Repeated measures of ANOVA test (${\alpha}$=.05) was used as statistics to evaluate the effect of repeated loading number on the removal torque. Independent t-test was used to evaluate the difference in removal torque after cyclic loading. Results: The removal torque significantly decreased as the number of loading repetition increased (P<.05). In the 10 time repetition test, there was no significant difference between the prefabricated and customized implant abutment screw of the 3 implant system (P<.05). Also in the cyclic loading test, there was no significant difference between the prefabricated and customized implant abutment screw of the 3 implant system (P<.05). Conclusion: Within the limitation of this study, there was no significant difference in the removal torque between the prefabricated abutment screw and customized abutment screws.

Cement Prefabricated Piped Making and Its Application on Agriculture Irrigation

  • Meng, Qingchang;Sun, Qingyi;Dang, Yongliang
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 1996.06c
    • /
    • pp.212-218
    • /
    • 1996
  • The concrete pipe used to distribute irrigation water to the right place now available is commonly made up of cement , sand, earth, pebble, etc. These materials with right ratio and right amount of water were mixed and squeezed through the pipe-making machine called vertical squeezed pipe-making machine, and then a cement prefabricated pipe is produced . This kinds of pipe has been expanding by leaps and bounds. Being little cement contents and low cost, the length of pipe is 1.0m or so with weight of 50kg, which is easy to be made and to be transported. The demolish pressure of it is 0.2 MPa or so, which meets the needs of agriculture irrigation . The buried pipe irrigation system, has been popularized in Jining Municipal , Shandong Province. By the year of 1995 , the irrigation area under pipe conveyancesystem usign this type of pipe has reached 74000 hectares. By calculation, about 27.7million ㎥ water, 2.88 million kWh power , 0.167 million man power and 1528 hectares cu tivated land will be saved one year, adding value of agriculture output increased by 10 million kg. The total economic benefits amount to 0.92 million US$ a year. The paper presents the pipe making course and its application on a large scale area.

  • PDF

Development of a Height Adjustment Method of Prefabricated Individual Footing for the Leveling of Unit Modular Structural System (유닛모듈러 건축구조물의 수평 정밀도 확보를 위한 Pre-Fab 독립기초 높이조절 공법 개발)

  • Jun, Young-hun;Kim, Kyoon-Tai;Chae, Myung-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.631-639
    • /
    • 2015
  • In the unit modular construction, the unit module prefabricated in a factory with a high level of accuracy does not fit completely onto the ground-joint junction due to the low accuracy of the ground work. This difference in the level of accuracy can cause diverse problems, such as twisting the upper unit modules and loosening the connection between the module and the footing. On this background, the aim of this study is to develop a technique for adjusting the height of the prefabricated individual footing. To accomplish the aim, a height adjustment method using bolts and nuts is proposed, and a shop drawing and the construction sequence are also presented in this study. The structural safety is verified through a structure simulation. In the future, research will be conducted on a mock-up test of the height adjustment method developed in this study, and an analysis of economic feasibility will be performed in order to verify its constructability and usability.

Application of Prefabricated Retaining Walls with Steel Lagging (강재 요소를 적용한 조립식 흙막이 벽체에 관한 연구)

  • Hong, Jong woo;Choi, Jae Soon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1277-1285
    • /
    • 2015
  • It has been known that the conventional retaining wall system with timber lagging and H pile has several problems such as the irregular gap between H-piles, cutting or adding to standard timber, back fill over first step excavation, and especially break-down accident at the disjoint of wall system. In the practical excavation, these problems may lead to worker's accident and the inefficiency of construction economy. To solve the above problems, a new method using prefabricated retaining wall was proposed and verified. The characteristics of the new method is to replace timber wall as free-sliding steel-lagging and connector. To check its verification and application, laboratory tests such as bending strength, tensile strength, and fatigue strength were carried out. Also, a pilot test in the field and numerical simulations under various ground conditions were performed. From the researches, it is found that the prefabricated retaining wall plate can be superior to the conventional timber lagging plate in the strength. It is also found that the proposed methods can be effective in the reuse of retaining wall plate and safe in the disjoint of wall system. Finally, it is desired that the proposed method will be effective in the reduction of the imported timbers and helpful in the safety of retaining wall construction.

Performance evaluation of smart prefabricated concrete elements

  • Zonta, Daniele;Pozzi, Matteo;Bursi, Oreste S.
    • Smart Structures and Systems
    • /
    • v.3 no.4
    • /
    • pp.475-494
    • /
    • 2007
  • This paper deals with the development of an innovative distributed construction system based on smart prefabricated concrete elements for the real-time condition assessment of civil infrastructure. So far, two reduced-scale prototypes have been produced, each consisting of a $0.2{\times}0.3{\times}5.6$ m RC beam specifically designed for permanent instrumentation with 8 long-gauge Fiber Optic Sensors (FOS) at the lower edge. The sensing system is Fiber Bragg Grating (FBG)-based and can measure finite displacements both static and dynamic with a sample frequency of 625 Hz per channel. The performance of the system underwent validation in the laboratory. The scope of the experiment was to correlate changes in the dynamic response of the beams with different damage scenarios, using a direct modal strain approach. Each specimen was dynamically characterized in the undamaged state and in various damage conditions, simulating different cracking levels and recurrent deterioration scenarios, including cover spalling and corrosion of the reinforcement. The location and the extent of damage are evaluated by calculating damage indices which take account of changes in frequency and in strain-mode-shapes. The outcomes of the experiment demonstrate how the damage distribution detected by the system is fully compatible with the damage extent appraised by inspection.