• Title/Summary/Keyword: prefabricated slab

Search Result 27, Processing Time 0.024 seconds

Seismic performance of prefabricated reinforced concrete column-steel beam sub-assemblages

  • Bai, Juju;Li, Shengcai
    • Earthquakes and Structures
    • /
    • v.22 no.2
    • /
    • pp.203-218
    • /
    • 2022
  • In this paper, quasi-static tests were carried out on three prefabricated reinforced concrete column-steel beam (RCS) sub-assemblages with floor slabs and one comparison specimen without floor slab. The effects of axial compression and floor slab on the seismic performance were studied, and finite element simulations were conducted using ABAQUS. The results showed that the failure of prefabricated RCS sub-assemblages with floor occurred as a joint beam and column failure mode, while failure of sub-assemblages without floor occurred due to beam plastic hinge formation. Compared to the prefabricated RCS sub-assemblages without floor slab, the overall stiffness of the sub-assemblages with floor slab was between 19.2% and 45.4% higher, and the maximum load bearing capacity increased by 26.8%. However, the equivalent viscosity coefficient was essentially unchanged. When the axial compression ratio increased from 0.24 to 0.36, the hysteretic loops of the sub-assemblages with floor became fuller, and the load bearing capacity, ductility, and energy dissipation capacity increased by 12.1%, 12.9% and 8.9%, respectively. Also, the initial stiffness increased by 10.2%, but the stiffness degradation accelerated. The proportion of column drift caused by beam end plastic bending and column end bending changed from 35% and 46% to 47% and 36%, respectively. Comparative finite element analyses indicated that the numerical simulation outcomes agreed well with the experimental results.

Building construction process improvement using prefabricated materia (공업화자재의 활용을 통한 공정합리화)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.90-96
    • /
    • 2003
  • The purpose of this study is to present an improvement building construction process by using prefabricated materials. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Non-value adding activities were found at existing slab form work process by current state mapping(CSM) 2) Future state mapping(FSM) suggest process Integration to slab form work. 3) Slab form work is analyzed reduction time-cost by prefabricated material. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction and application of prefabricated material should be increased.

Trial Installation and Performance Evaluation of Prefabricated Concrete Slab Track on Revenue Line (프리캐스트 콘크리트 슬래브궤도의 영업선 시험시공 및 성능평가)

  • Jang, Seung-Yup;Kang, Yun-Suk;Lee, Hu-Sam;Kim, Yu-Bong;Lee, Jong-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.840-845
    • /
    • 2008
  • To develop our original technology of concrete slab track, being widely accepted for new track, prefabricated concrete slab track, or precast concrete slab track has been developed. They have two different types according to slab shape and its dimensions, connection of slabs and connecting structure onto substructure. After the system design and successful performance evaluation in the laboratory, the trial installation on revenue line has been carried out. This paper is presenting the result of the trial installation and the performance tests in field. The performance tests have been performed as visual inspection for cracks and damages, measurement of track alignment and elastic behavior of track under passing trains. The performance test results during last 2 years have shown that no remarkable damages and settlements were found, and track alignment and elastic track behavior both exhibits good status.

  • PDF

Inelastic Behavior of Continuous Precast Composite Slabs (연속 프리캐스트 합성바닥판의 비탄성 거동)

  • Shim Chang-Su;Chung Young Soo;Min Jin
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05a
    • /
    • pp.447-450
    • /
    • 2005
  • A prefabricated composite hollow slab with perforated I-beams was suggested for the replacement of deteriorated concrete decks or the construction of new composite bridges with long-span slabs. Composite slabs with embedded I-beams have considerably higher stiffness and strength. For the application of prefabricated composite slabs to bridges, joints between slabs should satisfy the requirements of the ultimate limit state and the serviceability limit state. In this paper, three types of the detail for loop joints were selected and their structural performance in terms of strength and crack control was investigated through static tests on continuous composite slabs. A main parameter was the detail of the joint, such as an ordinary loop joint and loop joint with additional reinforcements. Even though there was no connection of the steel beams at the joints, the loop joints showed good performance in terms of strength. In terms of crack control, the loop joint with additional reinforcements showed better performance. In ultimate limit state, the continuous composite slabs showed good moment redistribution and ductility.

  • PDF

Upgrading flexural performance of prefabricated sandwich panels under vertical loading

  • Kabir, M.Z.;Rezaifar, O.;Rahbar, M.R.
    • Structural Engineering and Mechanics
    • /
    • v.26 no.3
    • /
    • pp.277-295
    • /
    • 2007
  • 3-D wall panels are used in construction of exterior and interior bearing and non-load bearing walls and floors of building of all types of construction. Fast construction, thermal insulation, reduced labor expense and weight saving are the most well pronounced advantage of such precast system. When the structural performance is concerned, the main disadvantage of 3D panel, when used as floor slab, is their brittleness in flexure. The current study focuses on upgrading ductility and load carrying capacity of 3D slabs in two different ways; using additional tension reinforcement, and inserting a longitudinal concentrated beam. The research is carried on both experimentally and numerically. The structural performance in terms of load carrying capacity and flexural ductility are discussed in details. The obtained results could give better understanding and design consideration of such prefabricated system.

Experiments on Shear Connections of PSC Girders with Prefabricated Slabs

  • Shim Chang-Su;Chung Chul-Hun;Hyun Byung-Hak;Kim Young-Jin
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.4 s.82
    • /
    • pp.573-579
    • /
    • 2004
  • For the fast construction and replacement of bridges in urban area, a prefabricated bridge system can be an excellent alternative. Details of prefabricated slabs for PSC girders were developed and static tests on shear connections were conducted to propose design equations of the shear connection. Stirrups and stud connectors were used as shear connectors and non-shrink mortar was used for the filling material in shear pockets for shear connectors. Stirrups and studs were fabricated to insert embedded nut-type devices in PSC girders. Shear strength of the shear connection considering chemical bond, friction and mechanical connectors was evaluated and empirical equations were suggested. Due to the mechanical connectors, ultimate slip capacity of the shear connection was sufficient for shear load redistribution, and suggested details of the shear connection showed good performance in terms of strength and ductility.

Static and fatigue behavior of through-bolt shear connectors with prefabricated HFRC slabs

  • He, Yuliang;Zhuang, Jie;Hu, Lipu;Li, Fuyou;Yang, Ying;Xiang, Yi-qiang
    • Structural Engineering and Mechanics
    • /
    • v.83 no.1
    • /
    • pp.109-121
    • /
    • 2022
  • Twelve push-out test specimens were conducted with various parameters to study the static and fatigue performance of a new through-bolt shear connector transferring the shear forces of interface between prefabricated hybrid fiber reinforced concrete (HFRC) slabs and steel girders. It was found that the fibers could improve the fatigue life, capacity and initial stiffness of through-bolt shear connector. While the bolt-hole clearance reduced, the initial stiffness, capacity and slippage of through-bolt shear connector increased. After the steel-concrete interface properties were improved, the initial stiffness increased, and the capacity and slippage reduced. Base on the test results, the equation of the load-slip curve and capacity of through-bolt shear connector with prefabricated HFRC slab were obtained by the regression of test results, and the allowable range of shear force under fatigue load was recommended, which could provide the reference in the design of through-bolt shear connector with prefabricated HFRC slabs.

Evaluating of Structural Safety of Slab Track (슬래브궤도의 구조안전성 평가)

  • 강윤석;양신추;이영제
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.431-438
    • /
    • 2000
  • In recent years. the destructive force acting on the ballasted track is on the increase with the speed-up of trains and the number of trains, requiring more labor and expenditure to maintain the track in goof condition. Slab track has been developed to decrease the track maintenance work on earthworks. One type of slab track Rheda has Prefabricated track grid, consisting of rails. Prestressed concrete sleepers and reinforcement rods are aligned into position. and then concrete is then placed to integrate the sleepers into a reinforced concrete track slab. In this paper, a new analysis model for the system analysis of the slab track is presented. Then the analysis results are compared with requirements for slab track.

  • PDF

Mechanical behavior test and analysis of HEH sandwich external wall panel

  • Wu, Xiangguo;Zhang, Xuesen;Tao, Xiaokun;Yang, Ming;Yu, Qun;Qiu, Faqiang
    • Advances in concrete construction
    • /
    • v.13 no.2
    • /
    • pp.153-162
    • /
    • 2022
  • Prefabricated exterior wall panel is the main non-load-bearing component of assembly building, which affects the comprehensive performance of thermal insulation and durability of the building. It is of great significance to develop new prefabricated exterior wall panel with durable and lightweight characteristics for the development of energy-saving and assembly building. In the prefabricated sandwich insulation hanging wall panel, the selection of material for the outer layer and the arrangement of the connector of the inner and outer wall layers affect the mechanical performance and durability of the wall panels. In this paper, high performance cement-based composites (HPFRC) are used in the outer layer of the new type wall panel. FRP bars are used as the interface connector. Through experiments and analysis, the influence of the arrangement of connectors on the mechanical behaviors of thin-walled composite wall panel and the panel with window openings under two working conditions are investigated. The failure modes and the role of connectors of thin-walled composite wallboard are analyzed. The influence of the thickness of the wall layer and their combination on the strain growth of the control section, the initial crack resistance, the ultimate bearing capacity and the deformation of the wall panels are analyzed. The research work provides a technical reference for the engineering design of the light-weight thin-walled and durable composite sandwich wall panel.