• Title/Summary/Keyword: precast connection

Search Result 216, Processing Time 0.03 seconds

Behavior of full-scale prestressed pile-deck connections for wharves under cyclic loading

  • Blandon, Carlos A.;Krier, Christopher J.;Restrepo, Jose I.
    • Earthquakes and Structures
    • /
    • v.16 no.4
    • /
    • pp.455-468
    • /
    • 2019
  • The behavior of pile-deck connections of pile-supported marginal wharfs subjected to earthquake loading is of key importance to ensure a good performance of this type of structures. Two precast-pretensioned pile-deck connections used in the construction of pile-supported marginal wharfs were tested under cyclic loading. The first is a connection with simple reinforcement details and light steel ratio developed for use where moderate pile-deck rotation demands are expected in the wharf. The second is specifically developed to sustain the large rotation, shear force and bending moment demands, as required for the shortest piles in a marginal wharf. Data obtained from the test program is used in the paper to calibrate an equivalent plastic hinge length that can be incorporated into nonlinear analysis models of these structures when prestressed pile-deck connections with duct embedded dowels are used.

An Experimental Study on Compressive Loading Capacity of PCT System (PCT System의 압축내하력에 관한 실험적 연구)

  • Han, Man-Yup;Kim, Jae-Hong;Kang, Sang-Hun;Jin, Kyung-Seok;Jeon, Yong-Sik;Cho, Byung-Ku
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.41-44
    • /
    • 2008
  • The PCT that supports the walls of long span temporary shoring facility is previously manufactured in the way of prestressing, and it which is composed of concrete is improved precast structure to satisfy enough stiffness. The components of PCT are manufactured as a fixed form, and they are close to the inner side of the wall of temporary shoring facility by fixed means in PCT. PCT system as support structure is that the ends of concrete filled segment members are united by the means of connection and also they have connection hole. In this study, PCT has enough bearing power for the long span temporary shoring facility, and also make the term of work reduce due to that the time of curing reduce through the method of precast.

  • PDF

Experimental and numerical study on mechanical behaviour of grouted splices with light-weight sleeves

  • Quanwei Liu;Tao Wu;Zhengyi Kong;Xi Liu;Ran Chen;Kangxiang Hu;Tengfei Xiang;Yingkang Zhou
    • Steel and Composite Structures
    • /
    • v.52 no.2
    • /
    • pp.165-182
    • /
    • 2024
  • Grouted sleeve splice (GSS) is an effective type of connection applied in the precast concrete structures as it has the advantages of rapidly assembly and reliable strength. To decrease the weight and cost of vertical rebar connection in precast shear walls, a light-weight sleeve is designed according to the thick-cylinder theory. Mechanical behaviour of the light-weighted GSS is investigated through experimental analysis. Two failure modes, such as rebar fracture failure and rebar pull-out failure, are found. The load-displacement curves exhibit four different stages: elastic stage, yield stage, strengthening stage, and necking stage. The bond strength between the rebar and the grout increases gradually from outer position to inner position of the sleeve, and it reaches the maximum value at the centre of the anchorage length. A finite element model predicting the mechanical properties of the light-weighted GSS is developed based on the Concrete Damage Plasticity (CDP) model and the Brittle Cracking (BC) model. The effect of the rebar anchorage length is significant, while the increase of the thickness of sleeve and the grout strength are not very effective. A model for estimating ultimate load, including factors of inner diameter of sleeves, anchorage length, and rebar diameter, is proposed. The proposed model shows good agreement with various test data.

Development of Wide Connection Method for Vertical Joints of Precast Concrete Walls (프리캐스트 콘크리트 벽체 수직접합부의 광폭형 연결방식 개발)

  • Choi, Eun-Gyu;Shin, Yeong-Soo
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.5
    • /
    • pp.549-556
    • /
    • 2009
  • This research analyzed the structural efficiency and application by improving the 100 mm width vertical joint to 150 mm and developing three connection methods to reduce the difficulty in assembling and handling PC walls. Moreover, nonlinear finite analysis was used for analyzing. From the analysis results, when double width connection was applied, the PC wall showed larger load capacity and ductility due to the steel bar sharing loads efficiently. Moreover, as the dimension of loops and the number of bars increased, the maximum load capacity increased as well. Also, among the double width connections, the largest capacity showed in the order of welding, ring and C type loop. However, in case of welding type loop connection, the ring type loop is more stable due to changes in different site conditions. Therefore, thorough quality control of welding is necessary.

Performance of Precast Composite Piers for Fast Construction (급속시공형 프리캐스트 합성교각의 성능)

  • Shim, Chang-Su;Chung, Young-Soo;Yoon, Jae-Young;Park, Ji-Ho
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.221-224
    • /
    • 2008
  • Recently various types of prefabricated pier has been developed. In this paper, prefabricated composite columns with core steel elements embedded in concrete were proposed, which has no prestressing. Based on the previous research on composite columns with low steel ratio, the column were designed. A simple bolt connection detail between a footing and a pier element were also suggested. In order to investigate the seismic performance of the composite columns, several tests on concrete encased composite columns, which are prefabricated, were performed. Quasi-static tests were carried out and their performance was evaluated and compared with the results from the tests on CIP composite piers. In the case of precast piers, the end part of the pier needs to be carefully reinforced and related recommendations on details were derived.

  • PDF

Behavior of Precast Concrete Shear Walls with C-Type Connections (C형 접합부를 이용한 프리캐스트 콘크리트 전단벽의 거동)

  • Lim, Woo-Young;Hong, Sung-Gul
    • Journal of the Korea Concrete Institute
    • /
    • v.22 no.4
    • /
    • pp.461-472
    • /
    • 2010
  • This paper investigates the behavior of precast concrete (PC) shear walls with a new vertical connections for a fast remodeling construction. The C-type vertical connections for the PC wall systems are proposed for transfer of bending moment between top and bottom walls in the vertical direction while a shear key in the center of wall is prepared to transfer shear forces by bearing action. The proposed vertical connections allows easy fabrication thanks to slots at the edges of wall in opposite directions. The plane PC wall systems subject to lateral load are compared with ordinary wall systems by investigating the effects of connection on the stiffness, strength, ductility, and failure modes of whole systems. The load-displacement relationship and influence of premature failure of connections are examined. The experimental test showed that the longitudinal reinforcing steel bars placed at the edges of walls yielded first and the ultimate deformation were terminated due to premature failure of connections. The diagonal reinforcements for efficient shear transfer in the walls were not effective. The strength and deformation obtained through the section analysis were generally in agreement with the experimental data, and indicated that. Gap opening contributed to the deformation behavior more than any other factors.

Development of Hybrid Panel with C-shaped Steel Beam at Top and Bottom of Precast Concrete Wall (프리캐스트 콘크리트 벽체의 상하부에 C형강 보가 결합된 복합 패널의 개발)

  • Lee, Sang Sup;Park, Keum Sung
    • Journal of Korean Society of Steel Construction
    • /
    • v.29 no.6
    • /
    • pp.435-442
    • /
    • 2017
  • A lateral load resisting system is a necessary structural element for the mid- to high-rise modular buildings and concrete cores are known as the most typical lateral load resisting systems in 10- to 20-story modular buildings. It is difficult to construct a concrete core simultaneously with the installation and finishing work of modular units because concrete placed using wet methods might contaminate or destroy the modular unit. Therefore, we have developed a hybrid PC (precast concrete) panel construction method that can construct a concrete core together with the installation of modular units. The hybrid PC panel is a load-bearing element in which a pair of C-shaped beams are combined at the top and bottom of a concrete wall. Concrete cores can be constructed by dry method to connect the hybrid PC panels with bolts. In this study, the details and connection of hybrid PC panels are improved to have the lateral performance comparable to reinforced concrete structural walls and are verified through FE analysis.

Evaluation on Flexural Performance of Precast Decks with Ribbed Joint by FEM (유한요소해석에 의한 요철형 이음단면을 갖는 프리캐스트 바닥판의 휨성능 평가)

  • Oh, Hyun-Chul;Chung, Chul-Hun;Kang, Myoung-Gu;Park, Se-Jin;Shin, Dong-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.1
    • /
    • pp.85-94
    • /
    • 2016
  • In this study, a non-linear FEM model is presented to predict the static flexural performance of precast bridge decks with ribbed joint and is verified with previous experiment results through comparison. The several theory of material properties were applied to each mechanical properties in FEM model and FEM model's input variables were determined through experiment result and parametric study. The FEM results showed good accuracy in predicting the structural performance of the specimens and FEM model's average error rate was 5%. Also, each specimen's cracking aspect and failure mode can be predicted through FEM's plastic strain distribution. Thus, this FEM model can be used effectively for predicting the ultimate behavior and parametric study to development of design formula for joint.

Seismic Performance of Precast Concrete Beam-Column Connections Using Ductile Rod (연성 강봉을 사용한 프리캐스트 콘크리트 보-기둥 접합부의 내진성능)

  • Lee, Sang-Jin;Hong, Sung-Gul;Lim, Woo-Young
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.6
    • /
    • pp.695-705
    • /
    • 2014
  • Precast concrete (PC) beam-column connections using ductile rods are proposed for earthquake zone. An existing beam-column connection, two PC specimens designed by considering failure modes and a conventional RC specimen were tested under cyclic loading to evaluate the seismic performance. The specimens were designed to satisfy the requirements of current design code. The variables are the yield strength of longitudinal reinforcing bars of PC beams. The test results showed that the proposed system applying smaller yield strength of the longitudinal reinforcing bars at the PC beams than the ductile rods was satisfied with seismic criteria. The deformation capacity and energy dissipation capacity of the proposed PC beam-column connections were greater than those of the existing DDC system.

Evaluation of Structural Performance of Precast Prefabricated Bridge Column using Nonlinear Finite Element Analysis (비선형 유한요소해석을 이용한 조립식 교각의 성능 평가)

  • Chung, Chul-Hun;Yun, Yeon-Suk;Whang, Eun-Jung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3A
    • /
    • pp.383-390
    • /
    • 2008
  • A Precast Prefabricated Bridge Column using steel tube and prestressing bar was proposed for the application of precast method on substructure. A column specimen designed by the proposed bridge column system was made and performed a quasi-static test. The failure mode appeared to be a flexural failure and there is no damage on column segment connection. And it is good use of the self-centering ability by prestressing force. Test results showed that a column specimen satisfy the earthquake specification, and the structural stability was verified. Nonlinear finite element analysis was performed and compared with the test results. Force-displacement relation and location of crack from the analysis results were compared with the test results and it agreed well. The quantitative analysis was also performed by a parametric study using this modeling technique.