• Title/Summary/Keyword: pre-stressed structure

Search Result 36, Processing Time 0.025 seconds

Optimum topology design of geometrically nonlinear suspended domes using ECBO

  • Kaveh, A.;Rezaei, M.
    • Structural Engineering and Mechanics
    • /
    • v.56 no.4
    • /
    • pp.667-694
    • /
    • 2015
  • The suspended dome system is a new structural form that has become popular in the construction of long-span roof structures. Suspended dome is a kind of new pre-stressed space grid structure that has complex mechanical characteristics. In this paper, an optimum topology design algorithm is performed using the enhanced colliding bodies optimization (ECBO) method. The length of the strut, the cable initial strain, the cross-sectional area of the cables and the cross-sectional size of steel elements are adopted as design variables and the minimum volume of each dome is taken as the objective function. The topology optimization on lamella dome is performed by considering the type of the joint connections to determine the optimum number of rings, the optimum number of joints in each ring, the optimum height of crown and tubular sections of these domes. A simple procedure is provided to determine the configuration of the dome. This procedure includes calculating the joint coordinates and steel elements and cables constructions. The design constraints are implemented according to the provision of LRFD-AISC (Load and Resistance Factor Design-American Institute of Steel Constitution). This paper explores the efficiency of lamella dome with pin-joint and rigid-joint connections and compares them to investigate the performance of these domes under wind (according to the ASCE 7-05), dead and snow loading conditions. Then, a suspended dome with pin-joint single-layer reticulated shell and a suspended dome with rigid-joint single-layer reticulated shell are discussed. Optimization is performed via ECBO algorithm to demonstrate the effectiveness and robustness of the ECBO in creating optimal design for suspended domes.

Teaching English Stress Using a Drum: Based on Phonetic Experiments

  • Yi, Do-Kyong
    • English Language & Literature Teaching
    • /
    • v.15 no.2
    • /
    • pp.261-280
    • /
    • 2009
  • This study focuses on providing the pedagogical implications of stress in English pronunciation teaching since stress is one the most important characteristic factors in English pronunciation (Bolinger, 1976; Brown, 1994; Celce-Murcia, Brinton & Goodwin, 1996; Kreidler, 1989). The author investigated stress production regarding in terms of duration, pitch, and intensity by a group of native speakers of English and a group of low-proficiency South Kyungsang Korean college students for their pre-test. For both of the pre- and post-test, the same stimuli, which consisted of a one-syllable word, two two-syllable words, three three-syllable words, and three four-syllable words, were used along with the various sentence positions: isolation, initial, medial, and final. Soft ware programs, ALVIN and Praat, were used to record and analyze the data. Since Celce-Murcia et al. (1996), Klatt (1975), and Ladefoged (2001) treat duration of the stressed syllable more significantly than other factors, pitch and intensity, with respect to the listener's point of view, the author developed a special method of teaching English stress using a traditional Korean drum to emphasize duration. In addition, the results from the native speakers' production showed that their main strategy to realize stress was through lengthening stressed syllables. After six weeks of stress instruction using the drum, the production of the native speakers and the SK Korean participants from the pre- and post-test were compared. The results from the post-test indicated that the participants showed great improvement not only in duration but also in pitch after the stress instruction. Pitch improvement was unexpected but well-explained by the statement that long vowels receive accent in loan word adaptation in North Kyungsang Korean. The results also showed that the Korean participants' pitch values became more even in their duration values for each syllable as the structure of the word or the sentence became more complex, due to their dependency upon their L1.

  • PDF

Non-linear Behavior of New Type Girder Filled by High-Strength Concrete (신형식 거더의 고강도 콘크리트 적용 시 비선형 거동 분석)

  • Choi, Sung-Woo;Lee, Hak;Kong, Jung-Sik
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.217-220
    • /
    • 2008
  • Recently, many studies about a high-strength concrete and composite structures are being progressed to get the more economic and stable result in the construction of structure all over the world. One of those studies is about CFTA(Concrete Filled and Tied Steel Tubular Arch) girder that applies an arch structure and a pre-stressed structure to CFT(Concrete Filled Steel Tubular) Structure which is filled with a concrete and improve the stiffness and strength of the structure by the confinement effect of fillers to maximize the efficiency of structure and economic. In this study, non-linear behavior of CFTA girders filled with a general concrete and the high-strength concrete respectively were analyzed by using ABAQUS 6.5-1 and results were compared.

  • PDF

Experimental research on vertical mechanical performance of embedded through-penetrating steel-concrete composite joint in high-temperature gas-cooled reactor pebble-bed module

  • Zhang, Peiyao;Guo, Quanquan;Pang, Sen;Sun, Yunlun;Chen, Yan
    • Nuclear Engineering and Technology
    • /
    • v.54 no.1
    • /
    • pp.357-373
    • /
    • 2022
  • The high-temperature gas-cooled reactor pebble-bed module project is the first commercial Generation-IV NPP(Nuclear Power Plant) in China. A new joint is used for the vertical support of RPV(Reactor Pressure Vessel). The steel corbel is integrally embedded into the reactor-cabin wall through eight asymmetrically arranged pre-stressed high-strength bolts, achieving the different path transmission of shear force and moment. The vertical monotonic loading test of two specimens is conducted. The results show that the failure mode of the joint is bolt fracture. There is no prominent yield stage in the whole loading process. The stress of bolts is linearly distributed along the height of corbel at initial loading. As the load increases, the height of neutral axis of bolts gradually decreases. The upper and lower edges of the wall opening contact the corbel plate to restrict the rotation of the corbel. During the loading, the pre-stress of some bolts decreases. The increase of the pre-stress strength ratio of bolts has no noticeable effect on the structure stiffness, but it reduces the ultimate bearing capacity of the joint. A simplified calculation model for the elastic stage of the joint is established, and the estimation results are in good agreement with the experimental results.

Health-monitoring and system-identification of an ancient aqueduct

  • Chrysostomou, Christis Z.;Stassis, Andreas
    • Smart Structures and Systems
    • /
    • v.4 no.2
    • /
    • pp.183-194
    • /
    • 2008
  • An important historical monument of Cyprus is an aqueduct that was built in 1747 to provide water to the city of Larnaca and to its port. Because of its importance to the cultural heritage of Cyprus, the aqueduct has been selected as one of the case-study monuments in the project Wide-Range Non-Intrusive devices toward Conservation of Historical Monuments in the Mediterranean Area (WIND-CHIME). Detailed drawings of the aqueduct obtained from the Department of Antiquities of Cyprus have been used for the development of a computational model. The model was fine-tuned through the measurement of the dynamic characteristics of the aqueduct using forced and ambient vibrations. It should be noted that measurement of the dynamic characteristics of the structure were performed twice in a period of three years (June of 2004 and May of 2007). Significant differences were noted and they are attributed to soil structure interaction effects due to seasonal variations of the water-level in a nearby salt-lake. The system identification results for both cases are presented here. This monument was used to test the effectiveness of shape memory alloy (SMA) pre-stressed devices, which were developed during the course of the project, in protecting it without spoiling its monumental value.

Phonetic Realization of Aspiration of Stops in English /Cr/ and /sCr/ Clusters and their Syllable Structure at the Phonetic Level: a Comparison between Two Speaker Groups (영어의 /Cr/과 /sCr/ 자음군 내 폐쇄음의 기식성 실현과 음성 단위의 음절구조: 두 화자집단 간 비교)

  • Sohn, Hyang-Sook
    • Phonetics and Speech Sciences
    • /
    • v.6 no.3
    • /
    • pp.121-130
    • /
    • 2014
  • This study investigates the acoustic property of aspiration realized in English voiceless stops of /Cr/ and /sCr/ clusters. VOT is measured from stops in these clusters produced by two groups; one from native speakers of English and the other from Korean native speakers. Aspiration of stops in different types of clusters is compared to various phonological factors such as location of stress, syllable type, and position in word. Pursuing the idea that phonetic realization is correlated with phonological representation, attempts are made to account for the gradient nature of aspiration of stops on the basis of syllable structure at the phonetic level, which may vary in the wake of resyllabification. Voiceless stops in /Cr/ and /sCr/ clusters are further compared to results obtained in the previous study on /sC/ cluster. Variations in aspiration are also characterized in terms of segmental precedence relation of stops in the clusters, namely, post-[s], pre-[r], or both.

Time-dependent analysis of cable trusses -Part II. Simulation-based reliability assessment

  • Kmet, S.;Tomko, M.;J., Brda
    • Structural Engineering and Mechanics
    • /
    • v.38 no.2
    • /
    • pp.171-193
    • /
    • 2011
  • One of the possible alternatives of simulation-based time-dependent reliability assessment of pre-stressed biconcave and biconvex cable trusses, the Monte Carlo method, is applied in this paper. The influence of an excessive deflection of cable truss (caused by creep of cables and rheologic changes) on its time-dependent serviceability is investigated. Attention is given to the definition of the basic random variables and their statistical functions (basic, mutually dependent random variables such as the pre-stressing forces of the bottom and top cable, structural geometry, the Young's modulus of elasticity of the cables, and the independent variables, such as permanent load, wind, snow and thermal actions). Then, the determination of the response of the cable truss to the loading effects, and the definition of the limiting values considering serviceability of the structure are performed. The potential of the method, using direct Monte Carlo technique for simulation-based time-dependent reliability assessment as a powerful tool, is emphasized. Results obtained by the First order reliability method (FORM) are compared with those obtained by the Monte Carlo simulation technique.

Analytical Assessment of Blast Damage of 270,000-kL LNG Storage Outer Tank According to Explosive Charges (270,000 kL급 LNG 저장 탱크 외조의 폭발량에 따른 손상도 해석적 평가)

  • Kim, Jang-Ho Jay;Choi, Seung-Jai;Choi, Ji-Hun;Kim, Tae-Kyun;Lee, Tae-Hee
    • Journal of the Korea Concrete Institute
    • /
    • v.28 no.6
    • /
    • pp.685-693
    • /
    • 2016
  • The outer tank of a liquefied natural gas (LNG) storage tank is a longitudinally and meridionally pre-stressed concrete (PSC) wall structure. Because of the current trend of constructing larger LNG storage tanks, the pre-stressing forces required to increase wall strength must be significantly increased. Because of the increase in tank sizes and pre-stressing forces, an extreme loading scenario such as a bomb blast or an airplane crash needs to be investigated. Therefore, in this study, the blast resistance performance of LNG storage tanks was analyzed by conducting a blast simulation to investigate the safety of larger LNG storage tanks. Test data validation for a blast simulation of reinforced concrete panels was performed using a specific FEM code, LS-DYNA, prior to a full-scale blast simulation of the outer tank of a 270,000-kL LNG storage tank. Another objective of this study was to evaluate the safety and serviceability of an LNG storage tank with respect to varying amounts of explosive charge. The results of this study can be used as basic data for the design and safety evaluation of PSC LNG storage tanks.

Optimization of Prestressed Concrete Beam Section (프리스트레스트 콘크리트 보 단면의 최적설계)

  • 조선규;최외호
    • Journal of the Korea Concrete Institute
    • /
    • v.12 no.4
    • /
    • pp.91-101
    • /
    • 2000
  • As the computer related technology evolves a study for a practical use of real structure as well as its hteory for optimum design has been greatly advanced. But the study on optimum design of pre-stressed concrete beam(PSC-beam) bridge for the construction of national roads and highways in Korea is not sufficient. Since a standard section for the PSC-beam is proposed, it is practically used in designing the PSC-beam. It is noticed that the section using the current standard PSC-beam design to be an over-designed with its surplus safety factor. Therefore, it is necessary to consider economical PSC-beam section which automatically satisfies all requirement of design specifications. Thus, in this study, the optimum design methods of PSC-beam are carried out using the gradient-based search method and global search method. As a result of the optimum design method, it was confirmed that the design of PSC-beam has a serious properties to non-linearity and discontinuity. And the section that in economical and efficinet design methods than the current standard design method is proposed.

Modelling and integrity assessment of shear connectors in precast cast-in-situ concrete bridges

  • Moyo, Pilate;Sibanda, Bongani;Beushausen, Hans
    • Structural Engineering and Mechanics
    • /
    • v.42 no.1
    • /
    • pp.55-72
    • /
    • 2012
  • Precast-cast insitu concrete bridge construction is widely practiced for small to medium span structures. These bridges consist of precast pre-stressed concrete beams of various cross-sections with a cast in-situ reinforced concrete slab. The connection between the beams and the slab is via shear links often included during the manufacturing process of the beams. This form of construction is attractive as it provides for standardisation, reduced formwork and construction time. The assessment of the integrity of shear connectors in existing bridges is a major challenge. A procedure for assessment of shear connectors based on vibration testing and finite element model updating is proposed. The technique is applied successfully to a scaled model bridge model and an existing bridge structure.