• Title/Summary/Keyword: power transmission towers

Search Result 62, Processing Time 0.028 seconds

The Power Line Deflection Monitoring System using Panoramic Video Stitching and Deep Learning (딥 러닝과 파노라마 영상 스티칭 기법을 이용한 송전선 늘어짐 모니터링 시스템)

  • Park, Eun-Soo;Kim, Seunghwan;Lee, Sangsoon;Ryu, Eun-Seok
    • Journal of Broadcast Engineering
    • /
    • v.25 no.1
    • /
    • pp.13-24
    • /
    • 2020
  • There are about nine million power line poles and 1.3 million kilometers of the power line for electric power distribution in Korea. Maintenance of such a large number of electric power facilities requires a lot of manpower and time. Recently, various fault diagnosis techniques using artificial intelligence have been studied. Therefore, in this paper, proposes a power line deflection detect system using artificial intelligence and computer vision technology in images taken by vision system. The proposed system proceeds as follows. (i) Detection of transmission tower using object detection system (ii) Histogram equalization technique to solve the degradation in image quality problem of video data (iii) In general, since the distance between two transmission towers is long, a panoramic video stitching process is performed to grasp the entire power line (iv) Detecting deflection using computer vision technology after applying power line detection algorithm This paper explain and experiment about each process.

A Study on Magnetic Field Reduction Design Technique around 345 kV Transmission Line with 2-wire Set Passive Loop (2선식 수동루프를 이용한 345[kV] 송전선 주변의 자계저감 설계기법 연구)

  • Kim, Eung Sik
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.5
    • /
    • pp.10-17
    • /
    • 2021
  • The controversy over the risk of the human body being affected by electromagnetic fields emitted from 60 Hz power lines continues without end. There are currently no new studies or research progress being made in this direction that is notable, and the number of civil complaints is gradually increasing. The problem is that each study produces different results, among which the effect of exposure to magnetic fields on childhood leukemia is a major one. In Korea, an electrician who was maintaining a 22.9 kV power line died of leukemia, which has recently been recognized as an occupational disease. Methods to reduce magnetic fields from power lines include shielding with wire loops, incorporating split phases and compaction techniques, installing underground power lines, converting to high-voltage direct current (HVDC), and increasing the ground clearance of transmission towers. Depending on whether a separate power supply is needed or not, there are two types of wire loops: passive loop and active loop. Magnetic field reduction is currently done through underground power lines; however, the disadvantage of this process is high construction costs. Installing passive loops, with relatively low construction costs, leads to lower magnetic field reduction rates than installing underground cables and a weakness to not solving the landscape problem. This methodological study aims at designing methods and reducing the effects of 2-wire set loops-the simplest and most practical. Since the method proposed in this study has been designed after analyzing the distribution of complex electromagnetic fields near the expected loop installation location, a practical design can be implemented without the need for any difficult optimization programming.

Development of Working Platform for the Polymer Insulator String (송전선로 폴리머애자 공사용 장비 개발)

  • Min, Byeong-Wook;Wi, Shwa-Bok;Bang, Hang-Kwon;Choi, Han-Yeol;Baek, Soo-Gon;Park, Jae-Ung
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.438-439
    • /
    • 2006
  • Porcelain insulators have generally been used in Korea to insulate a transmission line from the tower, and a highly polymerized compound polymer insulator which has superior stain proof characteristics, has also been used widely. Currently, a worker rides on the suspension insulator string for installation on towers and conductors but in case of polymer insulators, this will pollute and scratch the housing result in durability reduction by deterioration and corona. This study developed a high strength aluminum compound metal lauder designed to work on polymer insulators without riding, and a clamp type connecting device and safety gear for easy installation on the tower and conductor. These polymer insulator work device can be used for 154kV and 345kV polymer insulators through a strength and load test to secure safety. This paper presents field usage.

  • PDF

A Study on Three-phase Imbalance of a Power Transmission Line due to Installation of a Passive Loop Conductor (수동루프에 의한 송전선로 상불평형 발생에 관한 연구)

  • 김종형;신명철;최상열
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.17 no.6
    • /
    • pp.31-38
    • /
    • 2003
  • Among mitigation techniques for electric and magnetic field (EMF) from an overhead transmission line a passive loop is a way that can be cheap and easily installed on the existing towers and have a satisfactory effect as well. However current induced in the passive loop causes transmission power loss and the phase imbalance increases since geometrical asymmetry of the transmission lines becomes larger. So in order to evaluate the power loss and the phase imbalance due to a passive loop, this paper represent a 345[kV] 1-circuit flat type transmission line as asymmetrical 3-phase distributed parameter line model where the effect of a passive loop is embedded in the line parameters, and then formulates differential equations. By solving these equations voltages and currents of each phase at receiving end become known. We find out that power losses occur differently at each phase and positive sequence component decreases at receiving end while negative sequence component increase. In general phase imbalance due to a passive loop is slight, but it increases in proportional to the induced current and length of section where the passive loop is installed. Thus the phase imbalance should be included in terms of cost for introducing a passive loop.

An analysis of The ground fault current Distribution of 22.9kV-Y Lines (22.9kV다중접지선로 지락고장점 대지유입전류 및 중성선분류 해석)

  • Lim Yong Hun;Hyun Duck Hwa;Choi Jong Gi
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.473-475
    • /
    • 2004
  • During ground faults in power system, large current and raised potential appear at nearby places. This paper presents an analytical procedure of the ground fault current for the towers of a transmission line(154kV) and distribution line(22.9kV) of an arbitrary number of spans during ground faults. In order to economically and securely protect against undesired consequences, it is necessary to evaluate as precisely as possible the value and distribution of the ground fault current.

  • PDF

Strategies for Minimizing Forest Disturbance During the Construction of Power Transmission Towers (송전선로 건설에 따른 산림훼손의 최소화 관리방안)

  • 이동근;강현경
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.30 no.6
    • /
    • pp.66-78
    • /
    • 2003
  • The purpose of this study was to minimize the forest disturbance around an entry road of a power transmission tower construction site between Taean and Sinsesan, Chungnam. The main study field was classified into existing materials and a GIS, remote sensing analysis, and a field examination. This information was used to identify the most suitable entry road using a degree of green naturality map, eco-naturality map, actual vegetation map, and a forest state map as the existing materials. Also, the study used an normalized difference vegetation index, altitude and slope map in order to make the evaluation materials which used an remote sensing image, and GIS. This data was used to choose an optimum area, and diagnosed the current condition of the vegetation with a field survey of the area. It analyzed vegetation structure, species diversity, the age of trees in a field examination. Subsequently, we proposed four area types based on the analysis results--preservation area, transplantation area, restoration area and development area. As a result, the preservation area was categorized into 8 grades, according to the degree of green naturality, large area of breast diameter at Pinus densiflora community, competition area of Pinus densiflora and Quercus spp. and Quercus spp. community of over 20 years old. A transplantation area established 46 optimum areas according to the GIS analysis and vegetation investigation results. Vegetation restoration plan for disturbance area should be made based on ecological value of existing vegetation to worthwhile area as Quercus spp. mixing forest proposed. The development area selected a ecological worthless place as an artificial forest where Pinus densiflora and Pinus thunbergii growth is poor. This research results suggest that restoration of vegetation will be possible in the real world. Also, ecological restoration guidelines will be made through building and analyzing data base and routine monitoring of transplantation and restoration area.

Damage Evaluation of Porcelain Insulators Using the Frequency Response Function (주파수응답함수(FRF)를 이용한 자기 애자의 손상평가)

  • Choi, In-Hyuk;Son, Ju-Am;Oh, Tae-Keun;Yoon, Young-Geun
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.32 no.2
    • /
    • pp.122-128
    • /
    • 2019
  • Porcelain insulators have been used mainly for power line fixing and electrical insulation in transmission towers. Porcelain insulators have generally a 30 years desired life, but over 50% exceed their life expectancy. Since the damage to porcelain insulators is usually accompanied by enormous loss of human resource material, their efficient maintenance has emerged as an important issue. In this regard, this study applied a frequency response function (FRF) for integrity assessment of the insulator. The characteristics of the FRF according to damage types were identified and analyzed by the change in natural frequencies, curve shape, attenuation, and Nyquist diagram stability. The results showed significant differences in the FRF according to damage types, which can be used as basic data for the effective integrity assessment of porcelain insulators.

Development of Vertical Separated Tubular Steel Pole (종방향 분할형 관형지지물 개발)

  • Lee, Won-kyo;Mun, Sung-Duk;Shin, Kooyong
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.4
    • /
    • pp.257-262
    • /
    • 2019
  • Lattice steel towers for overhead transmission lines have been replaced by tubular steel poles due to the visual impact of large and complex shape of truss type. Demand for tubular steel poles consisting of a single frame member continues to grow because of its advantages such as visual minimization, architectural appeal and minimal site consumptions. However, there are some constraints on the transportation and construction. As the diameter of tower base has been enlarged, it may exceed minimum height limit required to pass the tunnel in case of land transportation. Also, in a narrow place where it is not easy to secure the installation areas such as mountainous places, there might be some areas wherein it must secure a wide working space so that large vehicles and working cranes will be allowed to enter. In this paper, we presented a vertical separated tubular steel pole, which is a new type of support that can be implemented for general purpose such as mountainous areas or narrow areas to improve the issues raised by breaking away from the conventional design and fabrication methods. Technical approaches for overcoming the limit of the cross-sectional size is to separate and modularize the cross-section of the tubular steel pole designed with a size that cannot be carried or assembled, and to lighten it with a weight capable of being transported and assembled in a narrow space or mountainous area. As a result of this research, it will be possible to enter small and medium sized vehicles in locations where it is restricted to transport by large-sized vehicles. In the case of mountainous areas, it will be possible to divide it into a weight capable of being carried by a helicopter and it will be easy to adjust and fabricate it with individual modules. Furthermore, in order to break away from the traditional construction method, we proposed the equipment that can be applied to the assembly of Tubular Steel Pole without using a large crane in locations where there is no accessible road or in locations wherein large cranes cannot enter. In particular, this paper shows the movable assembling equipment and some methods that are specialized for vertical separated tubular steel pole consisting of members with reduced weight. The proposed assembly equipment is a device for assembling the body of the Tubular Steel Poles. It will be installed inside the support and the modules can be lifted by using the support itself.

Development of Durable Reliability Assessment Methods for Heavy Duty Coatings

  • Kim, Seung-Jin;Jung, Ho;Yang, In-Mo;Tanaka, Takeyuki
    • Corrosion Science and Technology
    • /
    • v.4 no.4
    • /
    • pp.155-163
    • /
    • 2005
  • Heavy duty coating are required to have minimum durable period of 15 years under average usage environment because these paints are coated with purpose of anti-corrosion, antifouling, plastering etc. Onto steel structures constructed upon land and sea and other ferrous structures of electric power generation plants, electricity transmission towers, large structures of various plants, etc. Therefore we tried to estimate heavy duty coating longevity through reliability evaluation method and used combined cyclic anti-conrrosion test method composed of drying, moisturizing and salt spray as for accelerated life test to estimate longevity. Accelerated life test hours to heavy duty coating of first grade (with longevity not less than 15 years) specification may be obtained from troubleless test hours $t_n=\frac{B_p}{n^{1/\beta}}\left[\frac{1n(1-CL)}{1n(1-p)} \right]^{1/\beta}=19.671$ (yr) where shape parameter $\beta=1.1$, confidence level CL=80 %, warranty life $B_{10}=15$ yr and sampling size n=10 (2 sets). Because acceleration factor {AF} found by accelerated test is 41.7, accelerated life test hours required may be represented about 4,132 hr so that if this amount of hours is converted to number of cycles(6 hr/cycle) of complex cycle corrosion resistance test then the amount is tantamount about 690 cycles. That means if there does not occur trouble failure (with defect factor sum not more than 20) during when there is performed 690 cycles of combined cyclic anti-corrosion test to heavy duty coating specimen then it signifies that there can be warranted longevity $B_{10}$ of 15 yr under condition of confidence level CL=80 %.

Population Dynamics of Jellyfish Aurelia aurita (s.l.) in Sihwa Lake (시화호에서 보름달물해파리 Aurelia aurita (s.l.)의 개체군변동)

  • Hong, Hyun-Pyo;Han, Chang-Hoon;Yoo, Jeong-Kyu
    • Ocean and Polar Research
    • /
    • v.35 no.3
    • /
    • pp.205-217
    • /
    • 2013
  • We investigated the population dynamics of Aurelia aurita in Sihwa Lake from April to October in 2009. Salinity ranged from 5.9 to 30.7 psu at the surface. Abundance of mesozooplankton ranged from 3 to 111,874 indiv. $m^{-3}$. Ephyrae occurred from April to May with the peak in abundance occurring on 17 April. Maximum density of ephyrae was observed near the power transmission towers that are known to be habitats of polyps. Mortality of ephyrae was lower than in other areas because of the abundant prey concentration and the absence of predators. Young medusae occurred from April to July with the peak in abundance occurring on 8 May. Adult medusae occurred from May to July with the peak in abundance on 25 June and they disappeared before the rainy season. Planula occurred only in May and June with the peak in abundance on 25 June. Growth rates of Aurelia aurita ranged from -0.06 to 0.34 $d^{-1}$, and decreased rapidly after May. The period in which adult medusa occurred was restricted, compared with those in other area in Korea (e.g., Masan Bay) and Japan (e.g., Tokyo Bay). In the period of this study, the available food was limited in June and salinity decreased to ca. 20 psu in May because of the beginning of the wet season. We assumed that the exceptionally short period of occurrence of the medusa may be a response of adults to changes in temperature, salinity or food limitation which leads to the precocious maturation of young medusa and the release of planula and that the brief occurrence of medusa was caused by an abrupt decrease in activity after the release of planula.