• Title/Summary/Keyword: power distribution line

Search Result 812, Processing Time 0.025 seconds

Ananalzing fault current and Protective coordination in the underground line (지중배전선로의 고장전류 크기 및 보호협조분석)

  • Cho, Nam-Hun;Ha, Bok-Nam;Lee, Jung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.932-934
    • /
    • 1998
  • Electric power distribution feeders are susceptible to faults caused by a variety of situations such as adverse weather conditions, tree contacts, equipment failure, accidents, etc. Distribution circuit faults result in a number of problems related to the reliability of service and customer power quality. In the past, the permanent interruption of customer service resulting from a blown fuse or a recloser lockout was the only factor which was used to determine service reliability. So we developed KODAS(Korea Distribution Automation System) with successful and had fieid-testing of Distribution Automation System in last three years at Kang-dong Branch Office. In performing the project, KEPRI has gained valuable experience, through dealing with many difficult problem. This paper is depicted about the circuit breaker coordination problems in the Underground for the Distribution Automation Feeder.

  • PDF

Optimal capacity and allocation of distributed generation by minimum operation cost of distribution system (배전계통 운영비용의 최소화에 의한 분산전원의 최적용량과 위치결정)

  • Park, Jung-Hoon;Bae, In-Su;Kim, Jin-O;Shim, Hun
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.360-362
    • /
    • 2003
  • In operation of distribution system, DGs(Distributed Generations) are installed as an alternative of extension and establishment of substations, transmission and distribution lines according to increasing power demand. Optimal capacity and allocation of DGs improve power quality and reliability. This paper proposes a method for determining the optimal number, size and allocation of DGs needed to minimize operation cost of distribution system. Capacity of DGs for economic operation of distribution system can be estimated by the load growth and line capacity during operation planning duration. DG allocations are determined to minimize total cost with failure rate and annual reliability cost of each load point using GA(Genetic Algorithm).

  • PDF

Harmony Search Algorithm for Network Reconfiguration Problem in Distribution Systems (배전계통 재구성 문제를 위한 Harmony Search 알고리즘 응용)

  • Rhee, Sang-Bong;Kim, Kyu-Ho;Kim, Chul-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.9
    • /
    • pp.1667-1673
    • /
    • 2009
  • This paper presents a application of new algorithm for feeder reconfiguration problem in distribution systems. Harmony Search (HS) algorithm, which is motivated from the musical performance, is used to reconfigure distribution systems so that active power losses are globally minimized with turning on/off the sectionalizing and the tie-line switches. In optimization processing, the HS algorithm has searching ability for the global optimal solution, simple coding of the iteration procedure, and fast convergence to get the solution. The HS algorithm is tested on 15 buses and 69 buses distribution systems, and the results prove its effectiveness to determine appropriate switching options without the occurrence of any misdetermination in switching and get the minimum power loss.

The Interconnection Technology of Small Self-generating System with Distribution Line

  • Park, Kyung-sun;Chiu Hwang
    • Journal of Energy Engineering
    • /
    • v.8 no.1
    • /
    • pp.76-84
    • /
    • 1999
  • The demand of Small Self-generating System (SSS) including Small Cogeneration System (SCS) is constantly increasing with the need of electricity and/or thermal in office, hospital, hotel, and small factory, etc. It is especially recommended to operate SCS in the heat-following mode to maximize the efficiency of generator. In case of the heat-following mode SCS has got to be connected to distribution system so as to send surplus power to the utility or receive the short power from utility. But the interconnection of SSS with distribution system causes a few problems such as the bad power quality, and low security. If SSS is not promptly disconnected after faults occur (Islanding of SSS), it can not only damage equipment of utility and adjacent customers but also endanger life of human due to overvoltage or overcurrent. In this paper it has been deeply discussed if interconnection of engine self-generator/control system satisfies the protective requirement for SSS or not. 500 kW engine generator running in the Jodo island has been used to perform the analysis of interconnection.

  • PDF

Clock Distribution in High-Performance System Design (고성능 시스템 설계에서의 클럭 신호 분배)

  • Jeong Tai-Kyeong.T;Lee Jang-Ho
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.10 no.9
    • /
    • pp.1633-1640
    • /
    • 2006
  • The problem of reducing power dissipation while simultaneously delivering acceptable levels of performance is becoming a critical concern in high pelf[mann system design. In this paper, we present this power dissipation problem from the clock generation and distribution side. We examine clock power efficiency and several applications as well as wireless communication circuits.

An Investigation on the Air Pollution for Distribution Facilities In Metropolitan Area (22.9kV-Y 배전설비에 부착된 대도시 대기오염성분에 대한 조사연구)

  • Kim, Dong-Myung;Yoon, Tae-Sang;Park, Sang-Man;Yi, Sue-Muk
    • Proceedings of the KIEE Conference
    • /
    • 2000.07c
    • /
    • pp.1548-1550
    • /
    • 2000
  • The effect of air pollution on the distribution facilities was investigated. In order to evaluate the pollution level in the metropolitan area, contaminated specimens were analyzed with various technique such as ICP-AES, EA, and so on. The contaminants on the surface of the distribution line or insulators were combined with approximately 10 percent of organic and 90 percent of inorganic materials. We found out that the electric facilities were affected by the contaminants on the surface of the facilities.

  • PDF

The Study on Reducing Voltage Sags Due to Single Line Short Circuit Faults in Distribution System (배전계통 단선지락사고에 의한 전압저하 저감방법에 관한 연구)

  • 오용택;김진성
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.111-116
    • /
    • 2003
  • Recently, power-electronics equipments or machine that microprocessor is included and computers have been installed continuously in industrial process or region of electronics customer. So concern for power quality, especially sags has been increased. Because those equipments are very sensitive to sags. The sag is phenomenon that magnitude of load voltage temporarily decreases because of power system fault. If a certain equipment in industrial process have any trouble result from sag, it can cause utility to be charged for enormous economics loss. Therefore it need to analyze the characteristic of sag and then mitigation method for sags in distribution system in oder to increase reliability. This paper gives an overview of sags characteristic due to short circuit fault in distribution system and after a general discussion of the various forms mitigation, gives a sags mitigation method with concentrating on mitigation-device interface method, especially FCL that is Fault Current Limiter.

  • PDF

A Study of the Terminal Developement for Distribution Automation System (배전 자동화용 단말장치 기술 개발및 전원 구성에 관한 연구)

  • Kye, Moon-Ho;Kim, Jong-Soo;Jung, Je-Wook;Nam, Hyo-Sung;Park, Jong-Jin
    • Proceedings of the KIEE Conference
    • /
    • 1993.07b
    • /
    • pp.902-904
    • /
    • 1993
  • This paper contains the terminal developement for the feeder remote unit in Korea Distribution Automation System. This terminal unit has serval functions in order to do feeder auotmation as following, the open/close controls and gathering status informations of switchgears, getting line currents and voltages, distribution fault. So FRU has four modules to do those functions-Logic Controller, Relay Controller, Data Acquisition, Display, Power Supply etc. The FRU should be on allays, so AC power is supplied before & behind the switchgear. Power Supply is made up with AC/DC, DC/DC, Battery and/or SOLAR CELLS & CONTROLLER. It is important for the supply to protect against some Surges, because surges are happened so many times. Surge test is fellowing the standard IEC 801-5 or IEEE 587.

  • PDF

Novel Design Conditions to Optimize Power Coupling in Optical Grating-Assisted Directional Couplers

  • Ho, Kwang-Chun;Kong, Hyung-Yun
    • Proceedings of the IEEK Conference
    • /
    • 2002.07a
    • /
    • pp.508-511
    • /
    • 2002
  • By defining a power distribution ratio (PDR) and coupling efficiency (CE) amenable to the rigorous analytical solutions of newly developed rigorous modal transmission-line theory (MTLT), we explicitly analyze the power coupling characteristics of TE modes propagating in GADCs. The numerical results reveal that the incident power is optimally coupled into the desired guiding channel if the powers of rigorous modes excited at the input boundary of grating-assisted coupler are equally partitioned.

  • PDF

Development of outage-free installation method and equipments for underground power distribution system (지중배전선로 무정전 공법의 최적화를 위한 장비 개발)

  • Yu, K.Y.;Joo, J.M.;Lee, Y.S.;Kim, Y.M.;Kang, N.K.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.122-124
    • /
    • 2005
  • Underground distribution system is a trend due to the successive development of metropolitan area and satellite cities and the environment of the commercial and residential areas. The high quality of electricity, which is related with the minimal outage duration time due to the maintenance work for the underground distribution line, is mandatory. Hence, the construction method and tools for the outage-free maintenance construction have been required for underground distribution system. So far, all the efforts for outage-free maintenance for the underground distribution have been limited only to the survey for foreign countries situation and the theoretical provision; thus, It is required to develop the various construction method and the application tools. Differently from the aerial line, the construction of the underground cable is complicated and the insulation distance between conductor and shield should be maintained in loadmaking/breaking operation, though the apparatus connected with cable is a deadfront type. Also since the apparatus is installed above ground, by-pass of faulted area at busy area needs a variety of high technologies. Therefore, in this these, the authors introduce the development status of the loadbreak connectors, connection facilities, outage-free maintenance system for secondary side, a secondary auxiliary bushing and additional tools so that there can be more progress on this field.

  • PDF