• Title/Summary/Keyword: popular complaint solving

Search Result 2, Processing Time 0.017 seconds

Rock Crushing and Gel Crushing of Ocean Traffic Facilities Foundation (해양교통시설기초 암반파쇄와 겔파쇄)

  • Lee, Soo-Gwan
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2009.06a
    • /
    • pp.419-424
    • /
    • 2009
  • The ocean rock was crushed mainly by drop hammer and blasting. In recent years, because of farming and harbors extension, the ocean rock crushing method is changing to popular complaint solving type. Effective rock crushing methods of protecting environment are studied under consideration for topography, farming, structures, electronic equipment, environment protection arm near to rock crushing sector. Effective rock crushing methods are compared under consideration for crushing volume, rock quality, distribution, crushing speed. Effective rock crushing methods at once solving popular complaint and protecting ocean environment and building ocean structures, are compared according to the coast development.

  • PDF

A Study on the Types and Solves Plan of Popular Complaint by Construction Work Types - Focus on the Gwang-Ju City - (건축공사 공종에 따른 진정민원의 유형과 처리에 관한 연구 - 광주 지역을 중심으로 -)

  • Song, Hyuk;Go, Seong-Seok;Park, Hyeon-Ku
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.97-105
    • /
    • 2005
  • As construction project is becoming larger, construction progress and works are more various and complex according to recent Korean construction tendency. The growth of construction induces much pollution on the progress of construction and the problems due to the construction pollution are raised into social problem strongly, because it is increasing the need on the quality of lift and the desire of clean environment. This study aimed to seek far the effective solving plan of the construction popular complaints by surveying the real condition of construction popular complaints and analyzing the cause and tansaction period of popular complaints. For this study, the laws related and popular complaints were analysed focusing on the documents in low district offices of Gwangju from 2000 to 2004. As a result, the types of construction popular complaints were divided into 17 and the causes were as follows in order: crack and subsidence of ground(14.90%), infringement of private life(11.55%), noise(10.80%), infringement of a right to sunshine(10.07%) and breakdown(6.7%). Consequently, it is considered that these complaints are occurred by physical and environmental causes.