• Title/Summary/Keyword: point grid method

Search Result 379, Processing Time 0.026 seconds

Islanding Detection technique using DWT in the PV system (이산 웨이블렛을 이용한 태양광발전시스템의 단독운전 검출)

  • Koo, Ja Kyeong;Seo, Dong Woo;Kim, Il Song
    • Proceedings of the KIPE Conference
    • /
    • 2012.07a
    • /
    • pp.105-106
    • /
    • 2012
  • In this paper, discrete wavelet transform using a PV system covers how the detection of a islanding. Connection point occur exclusively in Grid when the grid voltage and current operation of the wavelet coefficients by changing features will determine if islanding operation. The proposed method has simple computation and fast decision time has the advantage. DSP-based controller through the experiment proved the validity of the proposed method.

  • PDF

Power Sharing Method for a Grid connected Microgrid with Multiple Distributed Generators

  • Nguyen, Khanh-Loc;Won, Dong-Jun;Ahn, Seon-Ju;Chung, Il-Yop
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.4
    • /
    • pp.459-467
    • /
    • 2012
  • In this paper, a grid connected microgrid with multiple inverter-based distributed generators (DGs) is considered. DG in FFC mode regulates the microgrid as a controllable load from the utility point of view as long as its output is within the capacity limit. The transition mode causes a change in frequency of microgrid due to the loss of power transferred between main grid and microgrid. Frequency deviation from the nominal value can exceed the limit if the loss of power is large enough. This paper presents a coordinated control method for inverter-based DGs so that the microgrid is always regulated as a constant load from the utility viewpoint during grid connected mode, and the frequency deviation in the transition mode is minimized. DGs can share the load by changing their control modes between UPC and FFC and stabilize microgrid during transition.

Analysis and Compensation of PCC Voltage Variations caused by Wind Turbine Power Fluctuations

  • Im, Ji-Hoon;Song, Seung-Ho;Kang, San
    • Journal of Power Electronics
    • /
    • v.13 no.5
    • /
    • pp.854-860
    • /
    • 2013
  • The voltage variation problem at the point of common coupling (PCC) in a grid-connected wind turbine is investigated. The voltage variation problem is one of the most frequent power quality issues for the grid connection of large amounts of input power in a weak grid. Through the simplified modeling of the wind turbine and power network, the magnitude of PCC voltage variation is calculated by using the equivalent circuit parameters and output power of the wind turbine. The required amount of reactive power that can compensate the voltage variation is also presented analytically by using the vector diagram method. The proposed calculation and compensation method of the PCC voltage variation is verified by computer simulations and experiments.

A Simple Prediction Model for PCC Voltage Variation Due to Active Power Fluctuation of a Grid Connected Wind Turbine

  • Kim, Sang-Jin;Seong, Se-Jin
    • Journal of Power Electronics
    • /
    • v.9 no.1
    • /
    • pp.85-92
    • /
    • 2009
  • This paper studies the method to predict voltage variation that can be presented in the case of operating a small-sized wind turbine in grid connection to the isolated small-sized power system. In order to do this, it makes up the simplified simulation model of the existing power plant connected to the isolated system, load, transformer, and wind turbine on the basis of PSCAD/EMTDC and compares them with the operating characteristics of the actual established wind turbine. In particular, it suggests a simplified model formed with equivalent impedance of the power system network including the load to analytically predict voltage variation at the connected point. It also confirms that the voltage variation amount calculated by the suggested method accords well with both simulation and actually measured data. The results can be utilized as a tool to ensure security and reliability in the stage of system design and preliminary investigation of a small-sized grid connected wind turbine.

GIS based Non-Point Source Pollution Assessment

  • Sadeghi-Niaraki, Abolghasem;Kim, Kye-Hyun;Lee, Chol-Young
    • Proceedings of the KSRS Conference
    • /
    • 2008.10a
    • /
    • pp.437-440
    • /
    • 2008
  • In recent years, pollution load calculation has become a topic for research that resulted in the development of numerous GIS modeling methods. The existing pollution method for nonpoint source (NPS) can not be indentified and calculated the amount of the pollution precisely. This research shows that the association of typical pollutant concentrations with land uses in a watershed can provide a reasonably accurate characterization of nonpoint source pollution in the watershed using Expected Mean Concentrations (EMC). The GIS based pollution assessment method is performed for three pollutant constituents: BOD, TN, and TP. First, the runoff grid by means of the precipitation grid and runoff coefficient is estimated. Then, the NPS pollution loads are calculated by grid based method. Finally, the final outputs are evaluated by statistical technique. The results illustrate the merits of the approach. This model verified that GIS based method of estimating spatially distributed NPS pollution loads can lead to more accurate representation of the real world.

  • PDF

Comparison of a Point-Grid-Method and a Buffering-Method to Calculate Skidding Distance for Timber Harvest Planning (목재수확계획을 위한 집재거리 계산방법중 포인트그리드방법과 버퍼링방법의 비교분석)

  • Park, Soo-Kyoo;Kang, Gun-Uh
    • Journal of Korean Society of Forest Science
    • /
    • v.97 no.6
    • /
    • pp.611-616
    • /
    • 2008
  • The investigation was accomplished on the test area in Forest Practice Research Center in order to compare Point Grid method with Bufferring method in process of the calculation of the Actual Mean Skidding Distance with the GIS aided harvesting method. the investigation site amounted to 264.9 ha in area and 32.67 m in the road density, 306.1 m in road spacing. the Net Correction Factor (Kn) was 1.53 in both sides skidding. the theoretical mean skidding distance was 72.52 m. the shortest mean skidding distance amounted to 149.57 m with point grid method and 139.68 m with Buffering methode. skidding distance correction factor (Kr) was 2.15. actual mean skidding distance amounted to 251.51 m and factor of wood assortment skidding (Kg) was 3.29. when the tractor (Dongyang) and tower yader (Koller 303) are used on investigation site, the logging cost is calculated 11,808 Won with Tractor below 25% slope and 12,336 won with Tractor between 25~55% slope, 10,020 won with Tower Yarder more than 55% slope.

LCL Filter Design Method for Grid-Connected PWM-VSC

  • Majic, Goran;Despalatovic, Marin;Terzic, Bozo
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.5
    • /
    • pp.1945-1954
    • /
    • 2017
  • In recent years, several LCL filter design methods for different converter topologies have been published, many of which use analytical expressions to calculate the ideal converter AC voltage harmonic spectrum. This paper presents the LCL filter design methodology but the focus is on presentation and validation of the non-iterative filter design method for a grid-connected three-phase two-level PWM-VSC. The developed method can be adapted for different converter topologies and PWM algorithms. Furthermore, as a starting point for the design procedure, only the range of PWM carrier frequencies is required instead of an exact value. System nonlinearities, usually omitted from analysis have a significant influence on VSC AC voltage harmonic spectrum. In order to achieve better accuracy of the proposed procedure, the system nonlinear model is incorporated into the method. Optimal filter parameters are determined using the novel cost function based on higher frequency losses of the filter. An example of LCL filter design for a 40 kVA grid-connected PWM-VSC has been presented. Obtained results have been used to construct the corresponding laboratory setup and measurements have been performed to verify the proposed method.

Reliability analysis of failure models in circuit-switched networks (회선교환망에서의 고장모델에 대한 신뢰도 분석)

  • 김재현;이종규
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.32A no.8
    • /
    • pp.1-10
    • /
    • 1995
  • We have analyzed the reliability of failure models in circuit-switched networks. These models are grid topology circuit-switched networks, and each node transmits a packet to a destination node using a Flooding routing method. We have assumed that the failure of each link and node is independent. We have considered two method to analyze reliability in these models : The Karnaugh Map method and joint probability method. In this two method, we have analyzed the reliability in a small grid topology circuit switched network by a joint probability method, and comared analytic results with simulated ones. For a large grid enormous. So, we have evaluated the reliability of the network by computer simulation techniques. As results, we have found that the analytic results are very close to simulated ones in a small grid topology circuit switched network. And, we have found that network reliability decreases exponentially, according to increment of link or node failure, and network reliability is almost linearly decreased according to increment of the number of links, by which call has passed. Finally, we have found an interesting result that nodes in a center of the network are superior to the other nodes from the reliability point of view.

  • PDF

A Study About Grid Impose Method On Real-Time Simulator For Wind-Farm Management System (풍력발전단지 관리·분석 시스템의 Real-Time Simulator 도입을 위한 계통모델 연동방안 연구)

  • Jung, Seungmin;Yoo, Yeuntae;Kim, Hyun-Wook;Jang, Gilsoo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.7
    • /
    • pp.28-37
    • /
    • 2015
  • Owing to the variability of large-scaled wind power system, the development of wind farm management technologies and related compensation methods have been receiving attention. To provide an accurate and reliable output power, certain wind farm adopts a specified management system including a wind prediction model and grid expectation solutions for considering grid condition. Those technologies are focused on improving the reliability and stability issues of wind farms, which can affect not only nearby system devices but also a voltage condition of utility grid. Therefore, to adapt the develop management system, an expectation process about voltage condition of Point of Common Coupling should be integrated in operating system for responding system requirements in real-time basis. This paper introduce a grid imposing method for a real-time based wind farm management system. The expected power can be transferred to the power flow section and the required quantity about reactive power can be calculated through the proposed system. For the verification process, the gauss-seidel method is introduced in the Matlab/Simulink for analysing power flow condition. The entire simulation process was designed to interwork with PSCAD for verifying real power system condition.

Improved Calculation of the Advection Term in the Semi-Lagrange Method for Realistic Smoke Simulation (사실적 연기 시뮬레이션을 위한 Semi-Lagrange 방법에서의 이류항 계산방법 개선)

  • Park, Su-Wan;Chang, Mun-Hee;Ki, Eun-Ju;Ryu, Kwan-Woo
    • The KIPS Transactions:PartA
    • /
    • v.14A no.4
    • /
    • pp.191-196
    • /
    • 2007
  • In the field of computer graphics, Navier-Stokes equations would be used for realistic simulations of smokes and currents. However, implementations derived from these equations are hard to achieve for real-time simulations, mainly due to its massive and complex calculations. Thus, there have been various attempts to approximate these equations for real-time simulation of smokes and others. When the advection terms of the equations are approximated by the Semi-Lagrange methods, the fluid density can be rapidly reduced and small-scale vorticity phenomena are easy to be missed, mainly due to the numerical losses over time. In this paper, we propose an improved numerical method to approximately calculate the advection terms, and thus eliminate these problems. To calculate the advection terms, our method starts to set critical regions around the target grid points. Then, among the grid points in a specific critical region, we search for a grid point which will be advected to the target grid point, and use the velocity of this grid point as its advection vector. This method would reduce the numerical losses in the calculation of densities and vorticity phenomena, and finally can implement more realistic smoke simulations. We also improve the overall efficiency of vector calculations and related operations through GPU-based implementation techniques, and thus finally achieve the real-time simulation.