In this study, we have investigated the preparation of mixed bead and fiber type hybrid ion-exchanger for recovering nickel ion from plating rinse water. There was little dependence of adsorption capacity for nickel ion on the mixing ratio of resin type and fiber type of ion exchangers. However, it increased with increasing the resin content in the mixed bed. It was shown that the data Langmuir and Freundlich's adsorption isotherm model were well fitted to the linear. Affinity between the functional groups in the ion exchanger and nickel ion in the process was confirmed. The pressure drop decreased with increasing the number of stage in the multistage bed, but it increased with increasing the resin content in the mixing bed. The initial breakthrough time in the multistage bed was short due to the increase of number of stage in the continuous process. It was found that the final breakthrough time of the multistage bed was little changed. The breakthrough time decreased with increasing the amount of fibrous ion exchanger in the mixed bed. The maximum adsorption capacities of the mixed and multistage beds were 2.51 meq/g and 2.69 meq/g, respectively. The desorption time for the nickel ion with $1N H_2SO_4$ solution was lower than 10 minutes and the yield of desorption was greater than 98 percent.
Seo, Minhye;Cho, Sungsu;Lee, Sooyoung;Kim, Jinho;Kang, Yong-Ho;Uhm, Sunghyun
Applied Chemistry for Engineering
/
v.26
no.3
/
pp.270-274
/
2015
We develop advanced oxidation processes for the treatment of spent electroless nickel plating solution. Apart form recovering nickel by leaching and enrichment, more emphasis is placed on rendering the waste water recyclable via oxidizing phosphite and hypophosphite into phosphate which can then be precipitated easily. $UV/H_2O_2$ process is employed and the conversion efficiency of COD and $PO_4-P$, and $H_2O_2$ consumption are analyzed. Furthermore, the $UV/H_2O_2/O_3$ process in conjunction with $O_3$ generator enables us to not only save the treatment time by 6 hours but also reduce $H_2O_2$ consumption by 30%.
Kim, Jung-Han;Gwak, Heui-Chul;Lee, Chang-Rack;Jung, Yang-Hwan
Journal of Korean Foot and Ankle Society
/
v.19
no.3
/
pp.86-90
/
2015
Purpose: We analyzed and compared the clinical and radiologic results between minimally invasive plate osteosynthesis and internal fixation using intramedullary (IM) nail in the treatment of distal tibia fractures. Materials and Methods: From March 2005 to June 2013, 65 cases of distal tibia fractures treated with either plate fixation or IM nail fixation were analyzed retrospectively by clinical and radiologic evaluations. The clinical results were compared using the American Orthopaedic Foot and Ankle Society (AOFAS) score, Olerud-Molander ankle score (OMAS), and visual analogue scale (VAS) score at the last follow-up. The radiologic results were compared by time to bone union, complications such as nonunion, delayed union, and malunion. Results: The clinical results (according to OMAS, AOFAS score, and VAS score) were 77.47, 84.76, and 1.75, respectively, in the plating group, and 90.21, 91.00, and 1.25, respectively, in the nailing group, and there was no statistically significant difference. Plating group showed earlier union than the nailing group and the nailing group showed higher frequency of non-union and delayed union than plating group. Conclusion: In treatment of distal tibia fractures, two methods showed appropriate results. Therefore, thorough investigation of the types of fracture, state of soft tissues, and advantages and disadvantages of the two methods should be conducted in the treatment of distal tibia fractures.
Kim, Seong-Kon;Yoo, Yeong-Eun;Seo, Young-Ho;Jae, Tae-Jin;Whang, Kyung-Hyun;Choi, Doo-Sun
Journal of the Korean Society for Precision Engineering
/
v.23
no.9
s.186
/
pp.174-178
/
2006
Pyramid shape of micro pattern is applied to the light guide panel (LGP) to enhance the uniformity of the brightness of the LCD. The micro pyramids are molded in intaglio on the surface of the LGP. The size of each pyramid is 5$\mu$m $\times$ 5$\mu$m on bottom and the height is about 3.5$\mu$m. The pyramids are distributed on the LGP surface randomly to be sparser where the light comes in and denser at the opposite side as a result of a simulation using lightools$^{TM}$ Based on this design, a silicon pattern master and a nickel stamper are fabricated by MEMS process and electro plating process. Intaglio micro pyramids are fabricated on the 6' of silicon wafer from the anisotropic etching using KOH and the process time, temperature of the KOH solution, etc are optimized to obtain precise shape of the pattern. A Wi stamper is fabricated from this pattern master by electro plating process and the embossed pyramid patterns turns out to be well defined on the stamper. Adopting this stamper to the mold base with two cavities, 1.8' and 3.6' LGPs are injection molded.
Potentially lethal damage repair (PLDR) in HFL-I was investigated by delayed plating experiments. The surviving fraction data were fitted to the linear Quadratic equation ($LogSn=-n{\gamma}({\alpha}d+{\beta}d^2$) where ${\gamma}=1$ for immediate plating). And a repair factor ${\gamma}$ was developed to compare survival for immediate and delayed plating. When we only took into account the repair factor of PLDR ${\gamma}$ which was derived from the delay assay, the cell survival response th fractionated carbon ion irradiation was not fully matched. This gap suggested that consideration of another repair process is necessary. So this suggests that the various repair process plays an important role in the fractionated irradiations.
The mean pH of wastewater discharged from the plating process is 2, so a less amount of alkali is required to raise pH 2 to 5. In addition, if sodium sulfite is used to raise pH 5 to 9 in the secondary treatment, caustic soda or slaked lime is not necessary or only a small amount is necessary because sodium sulfite is alkali. Thus, it is considered desirable to use only $FeSO_4{\cdot}7H_2O$ in the primary treatment. At that time, the free cyanide removal rate was highest as around 99.3%, and among heavy metals, Ni showed the highest removal rate as around 92%, but zinc and chrome showed a low removal rate. In addition, the optimal amount of $FeSO_4{\cdot}7H_2O$ was 0.3g/L, at which the cyanide removal rate was highest. Besides, the free cyanide removal rate was highest when pH value was 5. Of cyanide removed in the primary treatment, the largest part was removed through the precipitation of ferric ferrocyanide: $[Fe_4(Fe(CN)_6]_3$, and the rest was precipitated and removed through the production of $Cu_2[Fe(CN)_6]$, $Ni_2[Fe(CN)_6]$, CuCN, etc. Furthermore, it appeared more effective in removing residual cyanide in wastewater to mix $Na_2SO_3$ and $Na_2S_2O_5$ at an optimal ratio and put the mixture than to put them separately, and the optimal weight ratio of $Na_2SO_3$ to $Na_2S_2O_5$ was 1:2, at which the oxidative decomposition of residual cyanide was the most active. However, further research is required on the simultaneous removal of heavy metals such as chrome and zinc.
Journal of the Korean Society of Propulsion Engineers
/
v.18
no.4
/
pp.9-17
/
2014
In this study, in order to improve the ignitability of high energy aluminum powder, natural oxide films (alumina) were chemically removed, and instead nickel coat was applied. We used an electroless plating for nickel coating and confirmed quantitatively and qualitatively a time-dependent degree of nickel coating through analysis of surface by SEM/EDS. We also conducted element analysis by XRD and thermal properties by TGA/DSC in air oxidizer environment. There results explained the ignition enhancement mechanism of the nickel-coated aluminum powder in air. The difference between coated and un-coated aluminum powder, the effectiveness of coated powder has better ignitability.
Kim, Hyung Gu;Rho, Ho Kyun;Cha, Anna;Lee, Min Jung;Ha, Jun-Seok
Journal of the Microelectronics and Packaging Society
/
v.27
no.2
/
pp.39-44
/
2020
Recently, numerous researches are being conducted in flexible substrate to apply to wearable devices. Particularly, Conductive substrate researches that can implement the wearable devices on clothing are massive. In this study, we formed fiber substrate spraying CNT and Pd mixed solution on it and plated metal layer with electroless plating. Used SEM equipment and EDS analysis to analysis structure of the plated fiber substrate and discovered Ni layer was created. For check electrical properties, mapping was performed to check surface resistance and distribution of resistance of electroless plated fiber substrate with 4-point probe. It was confirmed that conductivity was improved as the duration of electroless plating was increased, and it was found that distribution of resistance by surface location was uniform. Changes in resistance due to mechanical stress were measured through tensile, bending, and twisting tests. As a result, it was confirmed that resistance change of flexible substrate gradually disappeared as plating time increased. Using UTM (Universal testing machine), it was analyzed mechanical properties of the electroless plated substrate with respect to changes in plating time were improved. In the case of conductive fiber substrate in which electroless plating was performed for 2 hours, tensile strength was increased by 16 MPa than fiber substrate. Based on these results, we found that Ni-CNT-Fabric flexible substrate is adequate for clothing-intergrated conductive substrate and we positively expect that this experiment shows flexible substrate can adapt to and develop not only a wearable device technology but also other fields needing flexibility such as battery, catalyst and solar cell.
Lee, Ho. Y.;Kyung. H. Nam;Joo. S. Yoon;Jeon. G. Han;Young. H. Jun
Proceedings of the Korean Institute of Surface Engineering Conference
/
2001.06a
/
pp.3-3
/
2001
Recently TiN, TiAlN, CrN hardcoatings have adapted many industrial application such as die, mold and cutting tools because of good wear resistant and thermal stability. However, in terms of high speed process, general hard coatings have been limited by oxidation and thermal hardness drop. Especially in the case of PCB drill, high speed cutting and without lubricant process condition have not adapted these coatings until now. Therefore more recently, superhard nanocomposite coating which have superhard and good thermal stability have developed. In previous works, WC-TiAlN new nanocomposite film was investigated by cathodic arc ion plating system. Control of AI concentration, WC-TiAlN multi layer composite coating with controlled microstructure was carried out and provides additional enhancement of mechanical properties as well as oxidation resistance at elevated temperature. It is noted that microhardness ofWC-TiA1N multi layer composite coating increased up to 50 Gpa and got thermal stability about $900^{\circ}C$. In this study WC-TiAlN nanocomposite coating was deposited on PCB drill for enhancement of life time. The parameter was A1 concentration and plasma cleaning time for edge sharpness maintaining. The characteristic of WC-TiAlN film formation and wear behaviors are discussed with data from AlES, XRD, EDS and SEM analysis. Through field test, enhancement of life time for PCB drill was measured.
In this research, heavy metals and T-P removal characteristics of plated wastewater are derived using BPC(Break Point Chlorination) process. AA sedimentation pond outflow(Influence) was evaluated for the removal efficiency of heavy metal(Ni) and T-P at a reaction time of 25 minutes by NaOCl input volume(9, 11, 13 and 15 mL). In the case, the higher the NaOCl input volumes, the higher the ORP values were maintained and the higher the removal efficiency tended to be. On the other hand, T-P was judged to have a low relationship between the ORP value and the removal efficiency. In addition, the efficiency of removal heavy metals and T-P in the plated wastewater by injecting 10 mL, 15 mL, 20 mL and 25 mL NaOCl, increased as the amount of NaOCl injected increased, the amount of NaOH input for pH increased. It was found that suspended solid in effluence also increased. It was also observed that the color of the plating wastewater changed from yellowish green to green to charcoal gray to black as the amount of NaOCl injected increased. Treatment characteristics of the reaction time, the longer the reaction time with the substance to be treated after the input of NaOCl, the more the heavy metal removal efficiency tended to increase. Through XRF analysis of the sludge, the constituents in the sludge such as NaCNO, CNCl, Na3PO4, CrO4, 2Na2CrO4 and 2NaNO3 will be analyzed in detail, and the mechanisms of the reaction between the plated wastewater and the complex compound will be elucidated.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.