• Title/Summary/Keyword: plant performance

Search Result 3,370, Processing Time 0.044 seconds

A Study on the Effects of Risk Perception and Opportunism on the Project Performance (위험인식과 기회주의 행동이 프로젝트 성과에 미치는 영향에 관한 연구)

  • Yoon, Chang Soo;Jo, Dong Hyuk
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.1
    • /
    • pp.63-76
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the effects of risk perception and opportunistic behavior on project performance and the moderating effect of cooperation in this relationship through literature review to identify factors affecting the performance of large-scale nuclear power plant construction projects. Methods: This study conducted a survey on nuclear power plant construction project participants and verified the hypothesis using statistical methods. Results: The results of this study are as follows; First, risk perception appeared to have a positive effect on opportunistic behavior, and it was confirmed that opportunistic behavior among participating companies could occur even in nuclear power plant construction projects. Second, it has been proven that risk perception has a negative effect on project performance as suggested in previous studies. Third, in the relationship between opportunistic behavior and project performance, it was found that opportunistic behavior had a negative effect on project performance. Finally, cooperation was found to have a moderating effect on the relationship between performance risk and project performance. Conclusion: This study is a case of empirical analysis targeting nuclear power plant construction project workers, and provided a basis for reference in future related academic research and project implementation.

On-line Performance Calculation Module of IGCC Power Plant (IGCC 온라인 성능계산 모듈)

  • Joo, Yong-Jin;Kim, Si-Moon;Lee, Min-Chul;Chung, Jae-Hwa
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.364-367
    • /
    • 2008
  • This present paper describes concepts of the real-time operation monitoring system as a tool for enhancing the reliability and raising the availability of the first Korea IGCC (Integrated Gasification Combined Cycle) power plant. This system consists of five (5) modules : (1) Data Validation Module, (2) Performance Calculation Module (3) Performance Diagnostic Module, (4) Trip Information Module, and (5) Statistics Analysis Module. Among these modules, Performance Calculation Module is explained in more detail. The objective of this module is to continuously evaluate the degradation (decrease in performance) of the IGCC plant and its equipment in order to provide plant operators additional information to help them identify problems, improve performance.

  • PDF

Analysis of Battery Performance Test for DC Power System in Nuclear Power Plant (원자력발전소 직류전원계통용 축전지 성능시험 분석)

  • Kim, Daesik;Cha, Hanju
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.2
    • /
    • pp.61-68
    • /
    • 2014
  • Function of battery bank stores energy for DC load in general, and DC power system of the nuclear power plant is used to supply DC loads for safety- featured instrumentation and control such as inverter, class 1E power system control and indication, and station annunciation. Class 1E DC power system must provide a power for the design basis accident conditions, and adequate capacity must be available during loss of AC power and subsequent safe shutdown of the plant. In present, batteries of Class 1E DC power system of the nuclear power plant uses lead-acid batteries. Class 1E batteries of nuclear power plants in Korea are summarized in terms of specification, such as capacity, discharge rate, bank configuration and discharge end voltage, etc. This paper summarizes standards of determining battery size for the nuclear power plant, and analyzes duty cycle for the class 1E DC power system of nuclear power plant. Then, battery cell size is calculated as 2613Ah according to the standard. In addition, this paper analyzes performance test results during past 13 years and shows performance degradation in the battery bank. Performance tests in 2001 and 2005 represent that entire battery cells do not reach the discharge-end voltage. Howeyer, the discharge-end voltage is reached in 14.7% of channel A (17 EA), 13.8% of channel B (16 EA), 5.2% of channel C (6 EA) and 16.4% of channel D (19 EA) at 2011 performance test. Based on the performance test results analysis and size calculation, battery capacity and degradation by age in Korearn nuclear power plant is discussed and would be used for new design.

Performance Anaysis of Small Hydropower Plant Using Treated Effluent in Wastewater Treatment Plant (하수처리장 방류수를 이용한 소수력발전 성능분석)

  • Lee, Chul-Hyung;Park, Wan-Soon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2012.03a
    • /
    • pp.494-497
    • /
    • 2012
  • A methodology to predict the output performance of small hydro power using treated effluent in wastewater treatment plant has been studied. Existing plant located Kyunggi-Do were selected and the output performance characteristics for these plants were analyzed. As a result, it was found that the developed model in this study can be used to analyze the output characteristics for small hydro power in wastewater treatment plant. Additionally, primary design specifications such as design flowrate, capacity, operational rate and annual electricity production were estimated and discussed.

  • PDF

A Study on the Selection of Maxium Plant Efficiency through the Performance Test in Snper-Critical Power Plant (초임계압형 화력발전소의 성능시험을 통한 최고효율점 선정에 관한 연구)

  • Kwon, Y.S.;Suh, J.S.
    • Proceedings of the KSME Conference
    • /
    • 2003.11a
    • /
    • pp.402-407
    • /
    • 2003
  • The main reason to select the maxium plant efficiency through the performance test in fossil power plant is to increase the efficiency of power plant as well as saving energy collated with the policy of government. This study is aimed at unerstanding the variantion trend of efficiency and analyzing the efficiency of boiler and turbine through each of the performance test. Ultimately, the maxium efficiency of power plant will be presented in super-critical pressure type power plant.

  • PDF

Plant Minimum Stable Load (Pmin) Test for Ilijan CCPP

  • Kim, Si Moon;Yun, Wan No;Jang, Cheol Ho;Park, Se Ik
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.1
    • /
    • pp.83-88
    • /
    • 2016
  • This paper describes the test results of plant minimum stable load (Pmin) for Ilijan Power Plant. The test was conducted on May 13 through 14, 2015 to investigate the plant operating and equipment condition in accordance with "Ilijan Plant Performance Test Procedure on Plant Minimum Stable Load" [1]. This paper also contains the assessment of the impact of Pmin to plant operating parameters and possible technical operating issues when operating at lower loads and to recommend the safe minimum load operation of Ilijan per block. In addition, this paper describes the performance calculation results of efficiency and heat rate depending on the load level.

The Effect of Conflict on Collaboration and Performance in Nuclear Power Plant Construction Projects (원자력 발전소 건설 프로젝트에서 갈등이 협력과 성과에 미치는 영향에 관한 연구)

  • Yu, Yeong Seok;Jo, Dong Hyuk;Choi, Hye Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.3
    • /
    • pp.553-569
    • /
    • 2019
  • Purpose: The purpose of this study is to identify the impact of conflicts and cooperation on project performance in the nuclear power plant construction project, thus contributing to the successful performance of project participants and the achievement of project objectives. Methods: This study used a method of conducting a survey of participants in the nuclear power plant construction project and verifying the hypothesis statistically. Results: The results of this study are as follows; First, role conflicts and relationship conflicts have negative effects on collaboration. Second, role conflicts have a negative effects on project performance, but conflict in relation has no significant effects on project performance. Third, collaboration has a positive effects on project performance. Finally, the communication quality in the relationship between conflict and collaboration has been shown to have a Moderated effect. Conclusion: In order to achieve the goal in the nuclear power plant construction project, the level of collaboration should be improved based on conflict management among project participants.

Optimal Design and Development of a Rice Mill Pilot Plant by Computer Simulation (II) -Development and Performance Evaluation of a Rice Mill Pilot Plant- (컴퓨터 시뮬레이션에 의한 미곡 도정공장의 적정설계 및 개발(II) -미곡 도정시스템의 개발 및 성능평가-)

  • 정종훈;김보곤;최영수
    • Journal of Biosystems Engineering
    • /
    • v.20 no.3
    • /
    • pp.262-274
    • /
    • 1995
  • A rice mill pilot plant was designed and developed in the basis of the simulation results on the mill plants. The performance of the developed rice mill plant was evaluated, and the simulation model on the mill system was validated with the experimental data in the mill plant. The results of this study were as followings : 1. A rice mill pilot plant with the capacity of 0.5 t/h was designed and developed. 2. The hulled ratio of the mill plant was 87.3%, and the milled rice recovery and the head rice recovery of the cleaned rice were 74% and 87% , respectively. The degree of milling of the cleaned rice was 10.6% with a high polish. The intensity of the cleaned rice appeared high compared with that of the milled rice in the analysis of whiteness test using an image processing system. 3. The bottleneck, processing time, and production amount of the developed mill system almost coincided with those of the simulation of the rice mill plant. The developed simulation model of the rice mill plant was proven to be applicable to the design of a rice mill plant through experiments.

  • PDF

Boiler Performance Characteristics Change by UC Contents Increase for Coal Fired Power Plant (석탄연소 화력발전소에서 미연탄소분 농도 증가가 보일러 성능에 미치는 영향에 관한 연구)

  • Kim, Taehyung;Park, Byungchul
    • 한국연소학회:학술대회논문집
    • /
    • 2015.12a
    • /
    • pp.99-102
    • /
    • 2015
  • To operate coal fired power plant efficiently is considered unburned carbon as important factor. But, unburned carbon contents change does not have an impact on Boiler performance simultaneously. we evaluated that unburned carbon contents change had an little influence on unburned carbon loss change for performance side at a real power plant.

  • PDF

Comparison of properties at Fossil Power Plant by On-Line Real Time Performance Monitoring System (On-Line 실시간 성능감시 시스템을 이용한 화력발전소 운전 Parameter 값 비교분석)

  • Jung, Hoon;Park, Doo-Yong
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.3501-3505
    • /
    • 2007
  • As the power plant industry has been changed into competition structure, power generation companies do more with less by increasing capacity and lowering operation costs. In order to achieve this goals, an on-line real-time performance monitoring system has been needed to introduced to fossil power plant. The system represents a suite of related software modules which consist of on-line data, and on-line performance modules. This system can help the plant staff get the most out of their facilities by continuously monitoring deviations in equipment performance and the impact on those deviations on plant power, heat rate and operating cost. This paper shows the comparison of design value with acceptance test and current(measured) value.

  • PDF