The establishment of R&D management system for Gas Plant R&D Center (가스플랜트 사업단에서 연구관리스템 구축)

  • Hwang, Seong Ha;Yoo, Sun Il;Nam, Tae Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.1
    • /
    • pp.19-29
    • /
    • 2008
  • Traditionally gas plant R&D has had a world-wide weak position in terms of high technology. Especially System engineering did not exactly apply to gas plant construction. So, Gas Plant R&D Center is determined to make the establishment of the system engineering for the standard of gas plant. Gas Plant R&D Center has two projects. Firstly, the establishment of the R&D management system. Secondly, the system engineering which is included in the VE concept of EPC parts. But Gas Plant R&D Center exists in the particular conditions for successful development of the new process and core equipments. Now we will describe the establishment of R&D management system and particular conditions(Risk Conditions) for gas plant.

  • PDF

Design of Plant Information System for Decreasing Plant Loss (설비 로스 절감을 위한 설비정보시스템 설계)

  • Kim Tae Hwan;Choi Sung Hee;Nam Sung Don
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.91-96
    • /
    • 2005
  • TPM(Total Productive Management) that is enforcing introducing more than $80\%$ in domestic manufacturing industry is using total plant efficiency by the evaluation index, and as a result, can see a lot of examples that plant productivity is increased. This study's purpose centers total productive management activities that is management system for total plant efficiency's maximization, plant information system that total productive management activities factor that is enforcing in manufacturing industry can develop evaluation model that can evaluate qualitative activities by quantitative activities in process that maximize total plant efficiency wishes to do design.

  • PDF

A Study on the Development of Analytic Hierarchy Process Plant Evaluation System for Safety Management (안전관리를 위한 AHP 설비 평가시스템 개발에 관한 연구)

  • Yun, Yeo-Kwon;Cho, Young-Wook;Yang, Kwang-Mo
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.127-134
    • /
    • 2012
  • Plant safety management that is enforcing introducing more than 95% in domestic manufacturing industry is using total plant efficiency by the evaluation index, and as a result, can see a lot of examples that plant productivity, economy and safety is increased. The efficient safety estimation for a business should analyze an accident data by considering every possible and potential factor. This study's purpose centers plant safety management activities that is management system for plant production and safety efficiency's maximization, plant evaluation system that plant safety management activities factor(reliability, maitainability, safety, service quality) that is enforcing in manufacturing industry can develop evaluation model that can evaluate qualitative activities by quantitative activities in process that maximize plant safety management wishes to do design.

A case on the Evaluation of the Effectiveness of Model based Configuration Management System for Small/ Medium-Sized Plant (모델 기반 중소형 플랜트 형상관리 시스템의 효과성 평가 사례)

  • Ha, Ga Yeon;Kim, Jinil;Shin, Junguk;Yeom, Choong Sub
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.17 no.1
    • /
    • pp.107-113
    • /
    • 2021
  • Plant Configuration Management(CM) is an activity to maintain consistency of design requirements, physical configuration, facility configuration information throughout the life cycle of the plant by systematically managing changes that occur during the plant design and operation process. Conformity between information must be ensured not only in the design stage, but also in the case of design changes in the operation and maintenance stages, and thus a computer system capable of efficiently managing them is required. In particular, in consideration of an application to small and medium-sized domestic plants, a computer system that can support configuration management at a low cost is needed. Accordingly, in this study, a configuration management system has been developed to support the management of plant design information and change procedures in the operation stage of small and medium-sized plants. Here, a case for quantitatively evaluating the effectiveness of the developed system is described.

Design of a Plant Life Cycle Data Management System for Plant Operation and Maintenance (플랜트 설계 및 운영 데이터 통합관리 시스템 설계)

  • Lee, Jae Hyun;Suh, Hyo Won
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.42 no.3
    • /
    • pp.241-248
    • /
    • 2016
  • Plant life cycle consists of design, construction, certification, operation, and maintenance phases, and various and enormous plant life cycle data is involved in each phase. Plant life cycle data should be linked with each other based on its proper relationships, so that plant operators can access necessary plant data during their regular operations and maintenance works. Currently, the relationships of plant life cycle data may not be defined explicitly, or they are scattered over several plant information systems. This paper proposes high level design of a plant life cycle data management system based on pre-defined plant life cycle database design. ISO-15926 standard is adapted for the database design. User-interface designs of the plant life cycle data management system are explained based on analysis of plant owners' requirements. A conceptual design of the database is also described with the entity-relationship diagram.

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

Development of Plant Safety Information Management System for Preventive Maintenance (사전예방을 위한 설비안전정보시스템 개발)

  • Kim Tae Hwan;Yang Kwang Mo;Choi Seung Hee;Kang Kyung Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.2
    • /
    • pp.1-12
    • /
    • 2005
  • TPM(Total Productive Management) that is enforcing introducing more than $80\%$ in domestic manufacturing industry is using total plant efficiency by the evaluation index, and as a result, can see a lot of examples that plant productivity is increased. This study's purpose centers total productive management activities that is management system for total plant efficiency's maximization, plant information system that total productive management activities factor that is enforcing in manufacturing industry can develop evaluation model that can evaluate qualitative activities by quantitative activities in process that maximize total plant efficiency wishes to do design.

A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System (성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구)

  • Lee, Sang-Hyun;Kim, Woo-Joong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

The study of EPC System S/W based on the UI (EPC시스템에서 UI기반의 소프트웨어에 대한 고찰)

  • Hwang, Seong Ha;Yoo, Sun Il;Jeong, Jin Su
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.6 no.1
    • /
    • pp.61-68
    • /
    • 2010
  • Generally EPC management system was simply management concept through the normal S/W. Our LNG Plant R&D Center wanted to the excellent management system from the S/W. So We developed the R&D management S/W and EPC management S/W Built in the Microsoft Project Server. Our system made to the customer Requirements. It was just User Interface protocol. But User Interface has more Weak position, because it makes from the MS Project Servers. Ms Projector server make easy to treat the project on the WBS. EPC parts mixed WBS and normally Ms SQL Database. It has very complicated Structures. Now We planed to make the general Database and Ms Project Server, It' means to the S/W Developer and Schedule Manager ability. We will successfully integrate R&D management system and EPC system and other softwares.

  • PDF