• Title/Summary/Keyword: plant construction

Search Result 2,239, Processing Time 0.028 seconds

A study on application method of "Result unit cost" to Nuclear Power Plant (NPP) construction cost estimating (원전 건설공사 실적공사비 단가 제도 도입을 위한 연구)

  • Park, Weon-Seob;Jang, Kyoung-su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.46-47
    • /
    • 2014
  • Recently, BAI(Board of Audit and Inspection of Korea) has recommended that "Result unit cost" of Korean government apply to national power plant construction project when plant owner corporations estimate budget price for tender. but nuclear industry have difficulties with this suggestion. the purpose of this study is to review the "Result unit cost" and problem with application of NPP construction cost estimating. And proposed the direction of application of "Result unit cost" to NPP construction cost estimating.

  • PDF

A basic study 3D model advancement method for nuclear power plant (원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구)

  • Lim, Byung-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

A Management Approach of the Construction Accidents Based on Assessing the Job Stress of Korean and Foreign Construction Laborers (내외국인 건설 근로자의 직무 스트레스 평가를 통한 건설재해 관리 방안)

  • Jeong, Kyeong Hwan;Kim, Gwang-Hee;Shin, Yoonseok
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.5
    • /
    • pp.88-96
    • /
    • 2014
  • Each year, it seems inevitable that major accidents will occur on construction sites. Industrial accidents, sometimes involving foreign laborers, have been constantly increasing. Construction laborers have higher hazard rates and higher work intensity than other industries, which means that they experience more job stress, as a result of the subcontracting structure. Therefore, this study performed an influence factor analysis on job stress and its relevance to industrial accidents involving Korean and foreign construction laborers, and proposed its effectiveness with the job stress and construction accident management measures based on the results of those. A questionnaire to measure job stress was performed targeting Korean and foreign laborers, and the results were analyzed. The results of this study can be utilized as important reference materials in efforts to reduce the job stress of foreign laborers on construction sites, and can be expected to contribute to preventing construction accidents related to job stress in the future.

Framework of Owner-driven Lean Construction for Plant Construction (발주자 주도형 린 건설에 대한 기초 연구;플랜트 건설공사를 중심으로)

  • Ryu, Chung-Kyu;Han, Seung-Heon;Park, Jung-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.647-651
    • /
    • 2007
  • The Lean Construction is adopted from Lean Principle of Manufacturing Industry in the early of 1990, that has been providing theoretical background and good practical implementation for maximizing customers' satisfaction and improving productivity through minimizing the waste factors in the construction operations. The Last Planner System(LPS), one of the elementary techniques of Lean Construction, aims for improving the work reliability and reducing variability by measuring and managing the daily or weekly performance for overcoming the weakness of recent complex schedule management tools such as Critical Path Method. This research is propose a framework for implementation of LPS conducted by owner in plant construction.

  • PDF

Development of Application Technology of High-Strength Reinforcing Bars for Nuclear Power Plant Structure : Performance Evaluation Test of the Wall (원전 구조물의 고강도 철근 적용 기술개발 : 벽체의 성능평가 실험)

  • Kim, Seok-Chul;Lim, Sang-Joon;Lee, Byung-Soo;Bang, Chang-Joon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.201-202
    • /
    • 2012
  • Recently, High-Strength steel reinforcement has been studied throughout the internal and external. One of the advantages using High-Strength steel reinforcement in construction is the economic effect due to the decreasing of its quantity. Also, another good effect is the increases of workability by reason of reducing the congestion. But, realistically it is not used in nuclear power plant construction site because of the restriction of design standard. The purpose of this report secures the reliability and changes the code through the performance evaluation test of the wall using the high-strength steel reinforcement in nuclear power plant.

  • PDF

Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

A Study on Measures for Structuring Overseas Plant Database Through the Analysis of Awarded Overseas Plant Orders (해외 플랜트 공사 수주실적 분석을 통한 효율적인 해외 플랜트 Data Base 구축 방안에 관한 연구)

  • Kim, Sang-Seok;You, Young-Hun;Cho, Chang-Yeon;Son, Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.234-238
    • /
    • 2007
  • Since the plant industry is a total business, it has great impact on the related industries and generates high value. However, in order to have a competitive engineering skills and capabilities, the plant industry requires long-term investment and a continuous strategic planning at the consortium level or national level. Also, a system needs to be established to share the information of the plant industry's overseas orders awarded and success factors. Thus, this study has conducted a survey and case study of the plant construction in foreign countries. Statistical analysis was performed and a basic data structure was built as a means of improving the future technological capabilities of the plant industry.

  • PDF

A Study on the Thermal Characteristics in the GPV with Heat Release by Wet Oxidation (습식산화반응열을 고려한 GPV 내 열적 특성 해석)

  • Seo, Hyeon-Seok;Lee, Hong-Cheol;Yang, Jun-Seung;Ahn, Jae-Hwan;Hwang, In-Ju
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.392-397
    • /
    • 2009
  • Gravity pressure vessels find their use in the wet oxidation of sewage sludge, which can be defined as the oxidation of organic and inorganic substances in an aqueous solution or suspension by means of oxygen or air at elevated pressures and temperatures. Numerical analyses were carried out for investigating the flow characteristics and wet air oxidation in the reaction vessel with various conditions such as supply oxidation and the supply positions of oxidation, etc. Wet air oxidation is promoted in the vicinity of bottom in the reactor with increase of oxygen supply. Also, it is the best condition to the oxidation supply position of 150 m and oxidation flow of 0.06 kg/s in the GPV reactor as the remnant of sludge and creation of organic acids.

  • PDF

Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process (계층 분석 방법을 이용한 원자로 격납 건물 시공의 리스크 요인 분석)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.425-431
    • /
    • 2015
  • Since the construction of Kori 1 was completed in 1978, the construction projects for nuclear power plant are increasingly expanded into domestic and foreign sites. However, some of construction sites of nuclear power plant have the problems of process delay and cost loss due to lack of ability of risk management. The construction of reactor containment building in nuclear power plant is especially dotted with many risk factors because it needs professional skills and large-scale resources due to long duration compared with different construction phase. Therefore, it needs the study that analyzes risk factors expected in construction of reactor containment building and suggests way of stable performance of projects. So, this study assesses risk factors of construction of reactor containment building. For the objectives, this study uses survey for group of minority specialists of 36 experts. The risks of 24 factors is classified by criterions of process, cost, safety, and quality and the results of assessment is analyzed by analytic hierarchy process. As the results, the importance and priority of risk factors classified by each criterion were calculated and the applicability of analytic hierarchy process was identified to analyze risk factors of nuclear power plant construction. These will be baseline data for risk management in construction phase of reactor containment building.