Cost Analysis on Mechanical Splice of High-Strength Reinforcement (550MPa) used in Nuclear Power Plant Structures (원전구조물의 고강도철근(550MPa) 사용에 따른 기계적이음 경제성 분석)

  • Lee, Byung Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.155-156
    • /
    • 2019
  • Because of the congestion problems, the high-strength reinforcements are expected to be used in nuclear power plant structures in the near future. According to ACI 349-13, lap splices of high-strength(550MPa) bars can be used but it is expected that lap splice length of reinforcement will be increased significantly. The increased lap splice length will be lead to increase in construction cost & period and to problems of other bar congestions. Therefore, this study will analyze the economic feasibility on mechanical splice of high-strength reinforcement used nuclear power plant structures instead of lap splice.

  • PDF

A Study on the Feasibility Analysis of Large Scale Research Project (대규모 연구 프로젝트 타당성 분석에 관한 연구)

  • Lee, Hong-Cheol;Hwang, In-Ju;Kim, Tae-Hyung
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.334-339
    • /
    • 2008
  • Nowadays national research and development fund is continuously increased. And the evaluation on the feasibility of R&D budget investment was carried out. Through this study it was possible that a business feasibility evaluation of large scale research project. Also the benefit of research project about large scale plant(A plant) is $2.67{\sim}3.76$ times of research funds, and the R&D fund pay-back period is $6{\sim}8$ years. And also there is employment effect as $1,200{\sim}2,200$ every year, and $22,000{\sim}35,000$ within 20 years after research project.

  • PDF

A Study on the Productivity Increment through Construction of Lean Production System for Automobile Plant in China (중국 자동차 공장의 린 생산 체계 구축을 통한 생산성 향상에 관한 연구)

  • Jang, Jung-Hwan;Zhang, Jing-Lun;Yoo, Sung-Hee;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.1
    • /
    • pp.117-122
    • /
    • 2012
  • This paper deals with the productivity increment through construction of lean production system for automobile factory in China. This lean production system has been progressed according to 5 steps. Step 1 is the work preparation. Step 2 is the process design. Step 3 is the establishment of method to count production quantity. Step 4 is the establishment of measuring method for input and output. Finally, step 5 is the construction of flexible production system able to adapt for environment change. This lean production system is expected to obtain the productivity increment by 50% for plastic plant and reduction by 50% in inventory quantity.

The Technology Development for applying the High Strength Headed Deformed Bar to the Nuclear Power Plant Structures (원전구조물의 확대머리 고강도철근 적용기술 개발)

  • Lee, Byung-Soo;Bang, Chang-Joon;Lee, Han-Woo;Lim, Sang-Joon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.273-275
    • /
    • 2013
  • If the mechanical development is applied to the Nuclear Power Plant Structures instead of the standard hook development, the problem of overcrowding re-bars in the anchorage zone can be solved and the construction quality of the concrete work will be improved. But there are some problems in applying it to the NPP structures because of the restriction on the yield strength and diameter of the re-bar. After the performance evaluation test for the mechanical development, we can develop the new design equation of the mechanical development length in order to solve the limitation and apply it to NPP structures.

  • PDF

A Study on the Integrated Management System for Rebar Information in Building Construction (건설공사 철근정보관리 개선방안에 관한 연구)

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.99-106
    • /
    • 2005
  • With labor shortage and high-wage, the construction cost is rising and the construction-business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. Therefore, in this study, to improve many problems found in calculating rebar quantity for capital expenditure programming which is considered the beginning stage of rebar work. and to improve problems such as no grasping of rebar loss due to lack of systematic management in order/purchase stage and construction management stage, a rebar information-management-system was found and preyed. The relation database was designed for the rebar information management system by analyzing work process of a rebar manufacturing plant, as the rebar information that is necessary in a rebar manufacturing plant if similar to that of a purchasing department of general construction company. The Proposed rebar information management system was implemented in two large rebar production plants. The implementation of the proposed system showed that the system increased work efficiency, reduced the management manpower, and improved the project-integrated management

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

A Study of the Construction Contracts and Delivery System for Nuclear Power Plant (원전건설 발주 및 계약체계에 대한 고찰)

  • Seo, Yong-Tok;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.233-235
    • /
    • 2012
  • Continually having growed up overseas construction market for new Nuclear Power Plant(NPP), the exports of Korean Reactor emerges as the key task of National Nuclear Business. The objective of this study is to strengthen the competitiveness of Korean Reactor through the improvement of Construction Project Contract & Delivery System for NPP. This study suggests the method for increasing Korean Reactor's competitiveness of exports by analyzing the business environment of foreign market and comparing Contract & Delivery System between domestic and foreign.

  • PDF

A study on the evaluation of field application for the waterproofing or corrosion proof construction method, as coating high quality filtration plant with ozone resistance paints of phenol degeneration polyamine (페놀 변성 폴리아민계 내오존도료를 이용한 고도정수처리장의 방수$\cdot$방식 공법에 대한 현장 적용성 평가에 관한 연구)

  • Jung Mun-Jung;Kwon Shi-Won;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.33-38
    • /
    • 2005
  • It is applied in the high quality equipment construction by introduction of this high duality treating technology (ozone treating, activated carbon treating, high quality oxidation treating, UV treating etc.)waterproofing or corrosion proof method caused secondary economy damage of operation discontinuance and high quality treating equipment for applying existent waterproofing method that corrosion proof ability (ozone resistance performance, chemical resistance etc.) and abrasion resistance performance by comprehension insufficiency of user and designer. Therefor, In this study, we will analyze problem of waterproofing and corrosion material of existing construction application by high quality treating, and measure physical performance change by various condition. It is required to waterproofing and corrosion system and application of the field valuation.

  • PDF

A basic Study on Establishment Plan of Design Information Traceability through Design Information Flow Identification for Controlled Equipment during the NPP Lifecycle (원전 생애주기 관리대상 기기의 정보 흐름 규명을 통한 설계정보 추적성 구현방안에 대한 기초 연구)

  • Lim, Byung-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.183-184
    • /
    • 2017
  • Some of the information created during the design phase of an New NPP life cycle is useful only for the execution of the construction phase; however, much of the information greatly impacts the longer-term operational phase. To most make use of design and construction information produced by data based design system during the construction and operation phase, This research is identified controlled data and drawn design information of controlled equipment from documents generated during the life-cycle stages. This study aimed to analyze related documents to assure traceability of controlled equipment from design phase through O&M and then suggested DB(Data Base) based control method on technical information of major equipment throughout nuclear power plant lifecycle.

  • PDF