• Title/Summary/Keyword: plant construction

Search Result 2,247, Processing Time 0.024 seconds

Development of System Dynamics model for Electric Power Plant Construction in a Competitive Market (경쟁체제 하에서의 발전소 건설 시스템 다이내믹스 모델 개발)

  • 안남성
    • Korean System Dynamics Review
    • /
    • v.2 no.2
    • /
    • pp.25-40
    • /
    • 2001
  • This paper describes the forecast of power plant construction in a competitive korean electricity market. In Korea, KEPCO (Korea Electric Power Corporation, fully controlled by government) was responsible for from the production of the electricity to the sale of electricity to customer. However, the generation part is separated from KEPCO and six generation companies were established for whole sale competition from April 1st, 2001. The generation companies consist of five fossil power companies and one nuclear power company in Korea at present time. Fossil power companies are scheduled to be sold to private companies including foreign investors. Nuclear power company is owned and controlled by government. The competition in generation market will start from 2003. ISO (Independence System Operator will purchase the electricity from the power exchange market. The market price is determined by the SMP(System Marginal Price) which is decided by the balance between demand and supply of electricity in power exchange market. Under this uncertain circumstance, the energy policy planners such as government are interested to the construction of the power plant in the future. These interests are accelerated due to the recent shortage of electricity supply in California. In the competitive market, investors are no longer interested in the investment for the capital intensive, long lead time generating technologies such as nuclear and coal plants. Large unclear and coal plants were no longer the top choices. Instead, investors in the competitive market are interested in smaller, more efficient, cheaper, cleaner technologies such as CCGT(Combined Cycle Gas Turbine). Electricity is treated as commodity in the competitive market. The investors behavior in the commodity market shows that the new investment decision is made when the market price exceeds the sum of capital cost and variable cost of the new facility and the existing facility utilization depends on the marginal cost of the facility. This investors behavior can be applied to the new investments for the power plant. Under these postulations, there is the potential for power plant construction to appear in waves causing alternating periods of over and under supply of electricity like commodity production or real estate production. A computer model was developed to sturdy the possibility that construction will appear in waves of boom and bust in Korean electricity market. This model was constructed using System Dynamics method pioneered by Forrester(MIT, 1961) and explained in recent text by Sternman (Business Dynamics, MIT, 2000) and the recent work by Andrew Ford(Energy Policy, 1999). This model was designed based on the Energy Policy results(Ford, 1999) with parameters for loads and resources in Korea. This Korea Market Model was developed and tested in a small scale project to demonstrate the usefulness of the System Dynamics approach. Korea electricity market is isolated and not allowed to import electricity from outsides. In this model, the base load such as unclear and large coal power plant are assumed to be user specified investment and only CCGT is selected for new investment by investors in the market. This model may be used to learn if government investment in new unclear plants could compensate for the unstable actions of private developers. This model can be used to test the policy focused on the role of unclear investments over time. This model also can be used to test whether the future power plant construction can meet the government targets for the mix of generating resources and to test whether to maintain stable price in the spot market.

  • PDF

Construction of an International Standard-Based Plant Data Repository Utilizing Web Services Technology (웹 서비스 기술을 활용한 국제 표준 기반의 플랜트 데이터 저장소의 구현)

  • Mun, Du-Hwan;Kim, Byung-Chul
    • IE interfaces
    • /
    • v.23 no.3
    • /
    • pp.213-220
    • /
    • 2010
  • As the market becomes increasingly globalized and competition among companies increases in severity, various specialized organizations are participating across the process plant lifecycle, including the stages of design, construction, operation and maintenance, and dismantlement, in order to ensure efficiency and elevate competitiveness. In this regard, it is an important technical issue to develop services or information systems for sharing process plant data among participating organizations. ISO 15926 is an international standard for integration of lifecycle data for process plants including oil and gas facilities. ISO 15926 Part 7, a part of the ISO 15926 standard, specifies an implementation method called a facade that uses Web Services and ontology technologies for constructing plant data repositories and related services, with the aim of sharing lifecycle data of process plants. This paper discusses the ISO 15926-based prototype facade implemented for storing equipment data of nuclear power plants and servicing the data to interested organizations.

Fuel Cost Analysis of CANDU-PHWR Wolsung Nuclear Power Plant Unit 1

  • Lee, Ik-Hwan;Lee, Chang-Kun;Yang, Chang-Guk;Yook, Chong-Chul
    • Nuclear Engineering and Technology
    • /
    • v.9 no.3
    • /
    • pp.151-163
    • /
    • 1977
  • Being based on the Segal method, calculation was carried out for the natural uranium nuclear fuel cost with Zircaloy-4 cladding having design Parameters of Wolsung Nuclear Power Plant, CANDU-PHWR (Unit 1) , currently under construction in Korea aiming at its completion in 1982. An attempt was also made for tile sensitivity analysis of each fuel component; j. e., depreciation of fuel manufacturing plant caused by its life time, its load factor, production scale expansion of plant facilities, variations of construction and operating costs of fuel manufacturing plant, fluctuation of interest rates, extent of uranium ore price increases and effect of learning factor.

  • PDF

A Basic Study on Reduction of Autogenous Shrinkage of High Strength Mortar by Plant Edible Oil (식물성 유지류에 의한 고강도 모르터의 자기수축 저감에 관한 기초적 연구)

  • Song, Ri-Fan;Baek, Dae-Hyun;Choi, Young-Wha;Baek, Byung-Hoon;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.69-72
    • /
    • 2009
  • This study reviewed the reduction effect of autogenous shrinkage of high strength mortar by plant edible oils based on existing studies, in an effort to find the method of reducing autogenous shrinkage of high strength concrete. To summarize the results, first as characteristics of fresh mortar, substitution of plant edible oil showed slight reduction in liquidity. Compressive strength was reduce at age of 28 days compared to plain mix regardless of type and substitution ratio. Ratio of change in the length of autogenous shrinkage of high strength mortar by plant oils was found to reduce compared to the plain, and the reduction effect was most satisfactorγ in bean oil.

  • PDF

Performance Evaluation Test for Applying the Mechanical Development of the High-Strength Reinforcing Bars to the Nuclear Power Plant Structures (고강도철근 기계적정착의 원전구조물 적용을 위한 성능평가실험)

  • Lee, Byung-Soo;Bang, Chang-Joon;Lim, Sang-Joon;Kim, Seok-Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.197-198
    • /
    • 2012
  • If the mechanical development be applied to the Nuclear Power Plant Structures instead of the standard hook development, the problem of overcrowding re-bars in the anchorage zone can be solved and the construction quality of the concrete work will be improved. But there are some problems in applying it to the NPP structures because of the restriction on the re-bar yield strength and diameter. After the performance evaluation test for the mechanical development, we can develop the new design equation of the mechanical development length in order to solve the limitation and apply it to NPP structures.

  • PDF

Experimental study to improve drying shrinkage durability performance of Nuclear Power Plant Structure (원전 구조물의 건조수축 저감을 위한 실험적 연구)

  • Lim, Sang-Jun;Lee, Byung-Soo;Bang, Chang-Joon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.205-206
    • /
    • 2012
  • In general, nuclear power plant concrete structure's performance has been very good with the majority of identified problems initiating during construction and corrected at that time. This study is experiments to improve drying shrinkage using glycol ether-based material for the durability of nuclear power plants. Thus, this study evaluated the obtained data from a mock up test for the practical use of concrete containing glycol ether. According to the results of this study, the concrete showed resistance performance of around 40% to drying shrinkage.

  • PDF