Establishment of Plan to lighten CAD Model for Strengthening Usability of Nuclear Power Plant 3D Model (원전 3D 모델 사용성 강화를 위한 CAD 모델 경량화 방안 정립)

  • Kim, Jong-Myeong;Kim, Woo-Joong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.248-249
    • /
    • 2019
  • In the nuclear industry, in order to keep pace with the 4th industrial revolution era, they are trying to improve the construction and maintenance ability by utilizing the technologies such as digital twin and VR/AR from the construction stage. However, the nuclear 3D CAD model, which is used as the base in the latest technology, is heavy due to a large number of facilities per unit space compared to other industrial companies, and it is difficult to directly incorporate the latest technology into the results of CAD programs for design purposes. In this study, in order to improve usability, we tried to lighten the 3D model. First, we analyze the existing nuclear power plant 3D model and draw out the problems and features. Secondly, we derived the factors to consider when we make the 3D CAD models lightweight.

  • PDF

Analysis of the Productivity and Influence Factor for Special-Plant Formwork (특수 플랜트 형틀공종의 생산성 및 영향요인 분석)

  • Huh, Young-Ki;Lim, Jin-HO;Oh, Jae-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.90-91
    • /
    • 2013
  • In the field of nuclear power construction, management and the systematic construction is very necessary. For more efficiently managing, analysis of influence factors and productivity is indispensable now. On this research, we collected the data from the nuclear power plant which is located in Korea. We analyzed the productivity and influence factors. As a result, productivity was 0.75(㎡/man·hour).On one hand, the productivity should be personnel, weather and whether there is a night duty or not. On the other hand, work crew depends upon operators, formwork amount, the presence or absence of night duty.

  • PDF

Study of application method for the Rebar Modulation of High-Strength Reinforcing Bars to the Nuclear Power Plant Structures (원전구조물 고강도철근 모듈화를 위한 적용방법 연구)

  • Lim, Sang-Joon;Lee, Byung-Soo;Bang, Chang-Joon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.17-18
    • /
    • 2013
  • To minimize construction of nuclear facility, it is required to reduce reinforcing bar amount and solve reinforcing bar concentration and for this, it is necessary to develop appication design technology and modular of high strength reinforcing bar. Hence, KHNP reduces excessive reinforcing bar amount which can cause possibility of poor construction of concrete through design standard development and modular of nuclear facility structure using high strength reinforcing bar to raise economics and has its purpose to maintain high-level safety and durability as they are. This study is to introduce application method for the Rebar Modulation of High-Strength Reinforcing Bars to the Nuclear Power Plant Structures.

  • PDF

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF

Development of Expert system for Plant Construction Project Management (플랜트 건설 공사를 위한 사업관리 전문가 시스템의 개발)

  • 김우주;최대우;김정수
    • Journal of Information Technology Application
    • /
    • v.2 no.1
    • /
    • pp.1-24
    • /
    • 2000
  • Project management in the Construction field inherently has more uncertainty and more risks relative to ones from other area. This is the very reason for why project management is recognized as the important task to construction companies. For getting better performance in the project management, we need a system that keeps the consistencies in a automatic or semi-automatic manner through the project management stages like as project definition stage, project planning stage, project design and implementation stage. But since the early stages such as definition and planning stages has many unstructured features and also are dependent to unique expertise or experience of a specific company, we have difficulty providing systematic support for the task of these stages. This kind of problem becomes harder to solve especially in the plant construction domain that is our target domain. Therefore, in this paper, we propose and also implement a systematic approach to resolve the problem mentioned for the early project management stages in the plant construction domain. The results of our approach can be used not only for the purpose of the early project management stages but also can be used automatically as an input to commercial project management tools for the middle project management stages. Because of doing in this way, the construction project can be consistently managed from the definition to implementation stage in a seamless manner. For achieving this purpose, we adopt knowledge based inference, CBR, and neural network as major methodologies and we also applied our approach to two real world cases, power plant and drainage treatment plant cases from a leading construction company in Korea. Since these two application cases showed us very successful results, we can say our approach was validated successfully to the plant construction area. Finally, we believe our approach will contribute to many project management problems from more broader construction area.

  • PDF

A Study of Field Construction Process Analysis and Economic evaluation of Ready-mixed Shotcrete (레디믹스트 숏크리트의 현장 시공프로세스 분석 및 경제성 평가)

  • Kim, Dong-Min;Ma, Sang-Joon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1322-1327
    • /
    • 2010
  • Ready-mixed shotcrete mixed with high quality materials and can be controled shotcrete quality is producted in plants and transported to construction fields, so do not need a field batch plant. In this study, the field construction system that can be applied Ready-mixed Shotcrete to construction fields was proposed, and the all-in-one silo that was the key component of the field construction system was design. It was performed to evaluate the constructability that the field construction process analysis in case of applying a field batch plant and the all-in-one silo, the cost analysis of the material production and transport in a road tunnel was also performed to evaluate the economic feasibility of Ready-mixed shotcret.

  • PDF

Cause Analysis of Cone Roof Tank Collapse during Plant Construction (플랜트 공사 중 발생한 Cone Roof Tank 붕괴 사고 원인 분석)

  • Kim, Seung-Han;Kim, Byung-Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.3
    • /
    • pp.71-80
    • /
    • 2016
  • This study is on safety improvement measures through analysis of accident cases during plant storage tank construction. Storage tank is a general term for artificial ground facility constructed to store oil, water, gas, and other chemicals. Some companies have clustered storage tanks (tank farm). The construction methods vary according to the component and types of fluids. Because most of the construction procedures include lifting heavy weight materials using heavy construction equipment and are carried out at high places, storage tank construction contains more risk factors than normal aerial construction. Recently, major accidents such as storage tank collapse have occurred often, and cost many lives due to the characteristics of the structure. In this study we would like to analyze the cause of these accidents and propose measures to improve safety.

A Study of Cost Management Utilizing Resource Quantity Data in Nuclear Power Plant Construction Project (원전건설 물량데이터를 활용한 사업비관리 방안)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.185-186
    • /
    • 2017
  • Even large construction projects of nuclear power plant construction and production data is increasing dramatically due to the introduction of ICT technologies, such as 3D scanning technology, wireless communication technology, virtual construction management technology. There are various attributes and types of data to be produced and managed because the documents generated by the contract method are different from the cost processing method. According to the requirements of the international nuclear bid, it is required to present the cost that is calculated based on resource quantity. This research considers ways in which the cost management based on the resource quantity.

  • PDF

Case Study of Soil Remediation by Mobile Soil Washing Instillation - Implemetation on Fluoride comtaminated soil in kitakyushu, Japan - (이동식 토양세척설비를 이용한 오염토양 복원 사례 - 일본 키타큐슈시 불소오염토 적용을 중심으로 -)

  • Oh, Seung-Hoon;Cheong, Jun-Gyo;Chang, Chung-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.268-276
    • /
    • 2008
  • The status of contaminated soils vary widely ; therefore, the techniques and equipment applicable to the soil concerned should be selected and used after careful consideration. Hyundai Soil Washing is physical-chemical separation based on mining and mineral processing principles for removing a broad range of organic and inorganic contaminants from soil. Mobile plant(capacity 15 tons./hr) was installed for this project. The goals of this project were 1) to verify the applicability of the washing process, which showed reliable results in the pilot plant with various kind of contaminated soils and 2) to promote recycling of the washed soil as a backfill on site. The results revealed that $F^-$ and $Pb^{2+}$ in the soil were effectively washed out to a certain level which washed soil was acceptable for recyeling.