• 제목/요약/키워드: planning phase

검색결과 746건 처리시간 0.026초

고층 사무소건축의 공사비계획을 위한 웹 기반 개산견적 프로그램 (Web-Based Cost Planning Program for High-Rise Office Building)

  • 김기홍;박찬식;장선호
    • 한국건설관리학회논문집
    • /
    • 제6권2호
    • /
    • pp.69-79
    • /
    • 2005
  • The Purpose of cost Planning at the early Phase of construction Projects is to provide the clients with the appropriate cost information during the design decision-making process. Therefore, the cost planning process is expected not only to predict projects' cost accurately but also closely to coordinate with the design decision-making activities. This paper proposes a new cost planning method for the effective and efficient directions relating a design decision-making process. Strategies for this method are i ) to utilize elemental cost breakdown system, and ii ) to apply probabilistic distribution theories. Based on these strategic direction, this paper proposed a probabilistic cost planning model for high-rise office building projects. The suggested model provides appropriate cost information to meet clients limited budget and various project' requirements during the design decision-making process. This study is based on probabilistic distribution variables theories and the range estimating technique. This study also develops a web-based software program in order to apply the proposed cost planning model effectively in high-rise of office building construction practices.

건축물 리모델링 기획단계에서의 사업수행 프로세스 구축 (Constitution of Work Process for the Remodeling Construction Project in Planning Phase)

  • 권원;전재열
    • 한국건설관리학회논문집
    • /
    • 제7권6호
    • /
    • pp.165-174
    • /
    • 2006
  • 최근 건축 리모델링은 건축물의 수명주기에 대한 관심이 증대하면서 침체된 건설시장을 활성화하기 위한 새로운 대안으로 부상하고 있다. 그러나 현재 리모델링 사업은 사업시행자의 리모델링에 대한 전반적 이해부족과 더불어 리모델링 효과, 성능에 대한 평가, 사용자 요구 반영체계의 미비, 투입된 공사비에 의한 경제적 가치상승의 타당성 분석 등 객관적 평가기준, 리모델링 주기(Remodeling Life Cycle : 기획, 타당성${\rightarrow}$설계${\rightarrow}$시공${\rightarrow}$관리)에 대한 체계적 수행절차 및 평가 등에 종합적 관리기술과 요소기술의 부재로 인하여 사업수행에 여러 가지 어려움을 겪고 있는 실정이다. 이에 본 연구에서는 현재 리모델링 사업수행에 있어서 기획단계, 설계단계, 시공단계 중 초기 기획단계를 중심으로 리모델링 사업의 업무절차 및 의사결정을 위한 분석항목 등을 제시하여 사업수행의 전반적 이해를 통해 효율적인 관리방법을 모색하고자 하였다 이를 위해 먼저 각 단계별 필요한 Input 정보를 분석하고 활용 가능한 도구(Tool)와 기술을 통해 요소 결과물(Output)을 제시하였으며, 이러한 일련의 과정에 있어서 사업 참여주체별 책임과 역할을 규정하여, 리모델링 사업의 체계적 수행 프로세스를 구축하고자 하였다.

기술논문 : 다목적 실용위성 1 호의 임무계획 및 자동 명령계획표 생성기 개발 (Technical Papers : Development of KOMPSAT-1 Scheduling & Automatic Command Plan Generator ( KSCG ))

  • 김해동;최해진;김은규
    • 한국항공우주학회지
    • /
    • 제30권1호
    • /
    • pp.139-146
    • /
    • 2002
  • 다목적 실용위성 1호의 초기운영과 정상임무운영을 위한 임무 및 명령계획 작업은 MAPS(Mission Analysis & Planning Subsystem)의 임무 및 명령계획 S/W를 이용하였다. 시간이 지날수록 요구되는 임무양이 증가하면서 수동작업이 많아 요구되는 기존 S/W를 이용하여 임무운영을 수행할 경우 안정성이 크게 저하되었으며, 자동 처리과정이 부족하여 결과검증에 소모되는 시간도 증가하였다. 다목적 실용위성 관제국은 이를 개선하고자 보다 신속하고 안전하게 임무 및 명령계획 작업을 수행할 수 있으며, 중요 과정들을 자동화하여 임무운영의 안정성을 높일 수 있는 새로운 임무 및 명령계획 S/W를 개발하였다. 본 논문은 다목적 실용위성 1호의 임무계획 및 자동 명령계획표 생성기(KSCG, KOMPSAT-1 Scheduling & Automatic Command Plan Generator)의 개발내용과 실제 운영결과를 기술하였다. KSCG를 사용한 결과, 작업능률 향상과 임무운영 안정성을 획기적으로 높였다.

국내개발사업 사전기획단계에서의 효율적 리스크 관리를 위한 리스크 인자 중요도에 관한 연구 (A Study on the Importance of Risk Factors for Effective Risk Management in the Pre-Project Planning Phase of the Development Projects)

  • 신규호;김재준
    • 한국건설관리학회논문집
    • /
    • 제3권2호
    • /
    • pp.75-86
    • /
    • 2002
  • 국내 건설시장 개방과 건설경기 침체에 따른 과당경쟁, 급속한 정보기술의 발달과 시시각각 변화하는 동태적인 사회 환경 등이 건설 환경을 급속하게 변화시키고 있으며, 이에 따라 건설사업에서의 리스크 또한 현저하게 증가하고 있다. 또한, 이러한 리스크를 다루는 리스크 관리가 사업의 성패와 부가가치 결정에 커다란 영향을 주고 있어 건설사업에서의 리스크 관리가 철실히 필요한 시점이다. 본 연구에서는 국내개발사업 사전기획단계에서의 제한된 정보를 이용하여 효과적으로 리스크를 관리 할 수 있도록 주요 리스크 인자 식별 및 분류를 통해 통계적 기법으로 중요도를 분석하고, 기획단계별 주요 리스크 인자를 분류하여 기존의 경험에 의존한 직관적이고 주관적인 리스크 관리를 보다 객관적으로 수행할 수 있도록 하는 기초를 마련하였다.

Comparative study of calcium carbonate deposition induced by microorganisms and plant ureases in fortified peat soils

  • Chao Wang;Jianbin Xie;Yinlei Sun;Jianjun Li;Jie Li;Ronggu Jia
    • Structural Monitoring and Maintenance
    • /
    • 제11권3호
    • /
    • pp.187-202
    • /
    • 2024
  • For the problems of high compressibility and low strength of peat soil formed by lake-phase deposition in Dianchi Lake, microbial-induced calcium carbonate deposition (MICP), phyto-urease-induced calcium carbonate deposition (EICP) and phyto-urease-induced calcium carbonate deposition combined with lignin (EICP combined with lignin) were used to reinforce the peat soil, the changes in mechanical properties of the soil before and after the reinforcement of the peat soil were experimentally investigated, and the effect and mechanism of peat soil reinforcing by the three reinforcing techniques were tested and analyzed using X-ray diffraction (XRD) and scanning electron microscope (SEM). The results show that: compared to the unreinforced remolded peat soil specimens, the unconfined compressive strength (UCS), cohesion and internal friction angle of the specimens reinforced by MICP, EICP and EICP combined with lignin techniques have been greatly improved, and the permeability resistance has been improved by two, two and three orders of magnitude, respectively; the different methods of reinforcing generate different calcium carbonate crystalline phases, with the EICP combined with lignin technique generating the most stable calcite, and the MICP and EICP techniques generating a mixed phase of calcite and spherulitic chalcocite. Analyses showed that for peat soil reinforcement, the acidic environment of peat soil inhibited the growth and reproduction of bacteria, EICP technology was superior to MICP technology, and the addition of lignin solved the defect of the EICP technology that did not have a "nucleation site", so EICP combined with lignin reinforcement was preferred for the improvement of peat soil.

패션브랜드의 온라인 상품기획 -자사몰 운영의 여성복 브랜드를 중심으로- (Online Product Planning in a Fashion Brand -Focused on the Brand of Women's Clothing Run by the Company's Mall-)

  • 이수진;이금희
    • 패션비즈니스
    • /
    • 제24권3호
    • /
    • pp.69-84
    • /
    • 2020
  • The purpose of this study is to analyze examples of online fashion product planning of domestic fashion brands, to grasp the characteristics and step-by-step problems in product planning, and to suggest product planning methods. This study consists of a literature study and a case study. The results of th study are as follows. First, in the information analysis and product planning, product planning according to analysis and targeting of online consumers should be conducted separately from offline, and the proportion of online-only products should be expanded. Second, in the design planning and product development stages, it should be possible to secure the quantity through the pre-planning of fabrics, a to acquire the novelty of the material through the preemption of good fabrics and the pre-planning of colors to secure competitive design. Third, in the convention, a systematic review process involving company members and customer review teams should be conducted to ensure product quality and sales-ability Fourth, in the production stage, the production period must be to reduce cost. Fifth, differentiated services according to the characteristics of their products for each brand in the promotion and sales stages. Based on this analysis, a desirable approach online product planning should first run promotion phase, increasing pre-planning for the product, and organizing specialize work and manpower issues.

ISP(정보 전략 계획) 개념을 이용한 디지털 생산 적용 프레임워크 연구 (Research on the Framework for the Adoption of Digital Manufacturing Methodology with Information Strategy Planning Concept)

  • 우종훈;송영주;이태경;신종계
    • 한국CDE학회논문집
    • /
    • 제15권2호
    • /
    • pp.94-105
    • /
    • 2010
  • Todays, there is fast transition about the new manufacturing IT methodologies from the conceptual phase into the practical application phase for the strengthening of enterprise competitiveness in manufacturing industry. One of those new methodologies is PLM (Product Life-cycle Management). PLM methodology consists of 3D CAD for the product design, PDM (Product Data Management) for the data management based on the collaboration platform and lastly DM (Digital Manufacturing). DM has evoluted from the stand-alone computer simulation of early 1980s, and now it covers the overall production development and production. Unfortunately, there exist serious critical problems about the actual application of DM for the real work. This is owing to the transition of the point of view from stand-alone type application (such as flow simulation or robot simulation) to that of business process about product development and production management. In this paper, we propose an application framework for the successful project with the digital manufacturing methodology with the concept of Information Strategy Planning, which enables the systematic diagnosis and the quantitative evaluation. Also, we introduce the actual practice of the proposing framework with the ISP project for 'Analysis & Simulation Technique of manufacturing process project' that is being conducted by Chungnam Techno Park.

토목공사 기획 및 설계단계의 BIM 적용방안 연구 (BIM Application for Civil Engineering Project in Planning and Design Phases)

  • 강인석;김슬기;김현승;문현석
    • 한국BIM학회 논문집
    • /
    • 제1권1호
    • /
    • pp.26-31
    • /
    • 2011
  • 국내에서 BIM의 실무 활용은 건축공사 중심으로 적용되고 있다. 건축공사의 부위별 객체 특성이 정형적, 수직적, 반복적인 형태를 갖는 반면에 토목공사의 객체 특성은 비정형적, 수평적, 비반복적인 형태를 갖으므로 3D객체 구성이 어렵기 때문이다. 본 연구에서는 토목공사의 기획단계부터 설계단계까지의 업무 및 정보관리의 문제점을 파악한 후 BIM기반에서의 적용 프로세스를 제안하며, 제시한 프로세스를 기반으로 BIM시스템을 구축하여 교량공사를 대상으로 실무 적용성을 검토한다.

양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향 (A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement)

  • 박종순;신창준;유병기;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.5-12
    • /
    • 2008
  • 양산 부산대학교병원 건립공사는 종합병원 의료타운 신축 프로젝트이다. 계획단계부터 건설사업관리자(CMr)가 참가하여 설계 시공일괄사업자를 선정한 후, 실시설계 진행과정을 거쳐 시공단계, 시공이후단계에 이르기까지 프로젝트의 모든 단계에 건설사업관리(CM) 업무를 일관적으로 적용한 사례이다. 또한 설계와 시공의 추진에 Fast Track을 도입하여 공기단축에 성공한 것에 그 의미를 찾을 수 있다. 본 사례는 설계 이전단계에 설계시공일관업체를 선정하였으며, Fast Track수법의 적용을 염두에 둔 설계 및 공사일정계획, 설계단계의 설계관리, Fast Track에 입각한 단계별 공사발주 및 계약관리, 기본설계 실시설계단계의 VE 수행, 시공단계에서의 설계변경 관리, 시공 후 유지관리 단계의 운용관리 등 건설사업관리 업무가 모든 단계에서 다각적으로 제공되었다. 본 보고에서는 상기와 같은 건설사업관리 적용상의 과제와 개선방향, 특히 설계 시공일괄사업에서 효율적으로 CM 업무를 수행할 수 있는 방안을 제시하여, 초대형 턴키(Turnkey) 프로젝트의 CM적용에 기여하고자 한다.

  • PDF

발주단계에서 BIM의 적용수준 설정을 위한 SLA 기반의 BIM 서비스에 관한 기초연구 (A Basic Study on the BIM Service Based SLA for Setting the Application Level of BIM in the Procurement Phase)

  • 김지윤;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.251-252
    • /
    • 2016
  • Recently policy and clouding system to mandate the introduction of BIM in construction industry, various sensors technology, BIM in ICT technology and fusion, such as 3D scanning and printing technology has been further activated. However, the expression level of diversification associated with it, plan within one of the BIM project, design, engineering, it is difficult to have a different application has been consistent for each field, such as construction. Thus fell the efficiency of BIM apply, it is difficult to determine the appropriate level of BIM in the business early stage in order destination of position. In this study, in order to solve this problem, by utilizing SLA used in the IT field, it attempts to explore scheme which can be evaluated targeted level of BIM suitable for business in the planning phase.

  • PDF