• Title/Summary/Keyword: planning model

Search Result 4,283, Processing Time 0.03 seconds

Requirements for Berth-Allocation Planning When Taking Pier-Available Resources and Submarine Support Service Request Schedules into Account (잠수함 지원업무 요구일정과 부두 가용자원을 고려한 선석할당계획)

  • Choi, Ji-Won;Choi, In-Chan
    • Journal of Navigation and Port Research
    • /
    • v.44 no.6
    • /
    • pp.501-508
    • /
    • 2020
  • His paper looks more closely at the Republic of Korea's (ROK) Navy submarine berth-allocation strategies, with the study's results ultimately resulting in the proposition of an integer programming model. Current submarine berth-allocation planning problems include the need for more minimal berth-shifting and general support service failures, as a lack of efficient submarine berth-allocation often leads to submarines unable to receive the support service they need due to the inadequacy of their assigned berths. Currently, the ROK Navy allocates berths by only taking available reserve resources and the full-capacity limits of support services into account. This paper expands upon this strategy, and proposes a model which would allow for submarine berth allocation planning to also take submarine support service scheduling into account, allowing for more efficient and timely submarine servicing. This proposed model in turn minimizes berth shifting, support service failures, and allows for full coordination with the submarine support service request schedule. The construction of this model was carried out through data gathered on the ROK Navy's fleets and forces, allowing for a more nuanced analysis of existing issues with submarine berth-allocation planning.

Selection of Spatial Regression Model Using Point Pattern Analysis

  • Shin, Hyun Su;Lee, Sang-Kyeong;Lee, Byoungkil
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.32 no.3
    • /
    • pp.225-231
    • /
    • 2014
  • When a spatial regression model that uses kernel density values as a dependent variable is applied to retail business data, a unique model cannot be selected because kernel density values change following kernel bandwidths. To overcome this problem, this paper suggests how to use the point pattern analysis, especially the L-index to select a unique spatial regression model. In this study, kernel density values of retail business are computed by the bandwidth, the distance of the maximum L-index and used as the dependent variable of spatial regression model. To test this procedure, we apply it to meeting room business data in Seoul, Korea. As a result, a spatial error model (SEM) is selected between two popular spatial regression models, a spatial lag model and a spatial error model. Also, a unique SEM based on the real distribution of retail business is selected. We confirm that there is a trade-off between the goodness of fit of the SEM and the real distribution of meeting room business over the bandwidth of maximum L-index.

A Study on Improving Ubiquitous Strategy Planning for Local Governments (지자체 U-도시계획 수립방법 개선에 관한 연구)

  • Kim, Myong-Dong;Park, Kwang-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.4
    • /
    • pp.45-58
    • /
    • 2013
  • Korean local governments have been planning for u-City construction with great efforts. Such efforts are needed in order to reflect the urban characteristics of each city, to promote local economic growth, and to have a sustainable operation model. Thus it is critical at an earlier stage to set a strategic direction based on urban environment analysis, which will lead to a feasible implementation of u-City. This paper derives issues and suggests improvement methods based on a case study on the USPs (u-City Strategy Planning's) of ten local governments. It is expected that the improvement methods will greatly reduce risks involved in u-City construction and contribute to better provided local-specific u-services.

A Joint Motion Planning Based on a Bio-Mimetic Approach for Human-like Finger Motion

  • Kim Byoung-Ho
    • International Journal of Control, Automation, and Systems
    • /
    • v.4 no.2
    • /
    • pp.217-226
    • /
    • 2006
  • Grasping and manipulation by hands can be considered as one of inevitable functions to achieve the performances desired in humanoid operations. When a humanoid robot manipulates an object by his hands, each finger should be well-controlled to accomplish a precise manipulation of the object grasped. So, the trajectory of each joint required for a precise finger motion is fundamentally necessary to be planned stably. In this sense, this paper proposes an effective joint motion planning method for humanoid fingers. The proposed method newly employs a bio-mimetic concept for joint motion planning. A suitable model that describes an interphalangeal coordination in a human finger is suggested and incorporated into the proposed joint motion planning method. The feature of the proposed method is illustrated by simulation results. As a result, the proposed method is useful for a facilitative finger motion. It can be applied to improve the control performance of humanoid fingers or prosthetic fingers.

A Study on the Relationship between Outsourcing Risks and Performance for Contractors (수주자 관점에서의 정보기술 아웃소싱 위험요소와 성과와의 관계에 관한 연구)

  • Yang, Kyung-Sik;Kim, Hyun-Soo
    • Asia pacific journal of information systems
    • /
    • v.13 no.4
    • /
    • pp.119-145
    • /
    • 2003
  • Recently, IT outsourcing has been one of the major concerns of many companies. This study proposes a model which composed the outsourcing planning and operational risks affecting the outsourcing performance. Especially, this study focused on the contractors perspective, because the outsourcing risk relative researches are recently performed on the service receivers perspective, contractors perspective researches were relatively lacked. The result of this study, outsourcing planning risks had not affected the outsourcing performance but it had positively affected the operational risks. And also, the outsourcing operational risks had negatively affected the outsourcing performance. For this reason, It is necessary to reduced planning risk induction for the outsourcing performance improvement. Because the planning risks positively affect the operational risks, it is necessary to reduced planning risk induction for the outsourcing performance improvement.

Efficient resource allocation mechanisms for large organizations

  • Kim, Hyung-Kee
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.1 no.1
    • /
    • pp.127-138
    • /
    • 1976
  • Economists have become interested in the centralization and decentralization of planning, in the linking up of models into a homogenous model system, and in multi-level planning. In this study, Input/Output techniques used for explaining the resource allocation mechanisms to be more rational through detailed specifications of a large organization's objectives and explicit linking of centralization and decentralization to such objectives. Also the application of mathematical methods to the higher levels of planning in the optimal allocation resources can't fully describe the actual practice of planning. On the other hand, 1-0 techniques are standard in economic analysis and planning. However, the application procedures to the armed forces hold only when their assumptions are met and when their solutions are convergent. So, it is of limited applicability.

  • PDF

A Study on a Real Time Freight Delivery Planning for Supply Center based on GIS (GIS기반의 실시간 통합화물운송시스템 계획에 관한 연구)

  • 황흥석;김호균;조규성
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.75-89
    • /
    • 2002
  • According to the fast-paced environment of information technology and improving customer services, the design activities of logistics systems improve customer centric services and delivery performance implementing e-logistics system. The fundamental design issues that arise in the delivery system planning are optimizing the system with minimum cost and maximum throughput and service level. This study is concerned with the integrated model development of delivery system with customer responsive service level for DCM, Demand Chain Management. We used a two-step approach for this study. First, we formulated the supply. center facility planning using stochastic set-covering problem and assigned the customers to the supply center using clustering algorithm. Second, we developed vehicle delivery planning for a supply center based on GIS, GIS-VRP. Also we developed a GUI-type computer program for proposed method for supply center problem using GIS and Geo-DataBase of Busan area. The computational results showed that the proposed method was very effective on a set of test problems.

A Study on Project Management Scheduling Module Development using the Rule and CBR (규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구)

  • Sin, Ho-Gyun;Kim, Yeong-Jun;Jeon, Seung-Ho
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

A Process Planning System for Machining of Dies for Auto-Body Production (자동차 차체금형 가공용 공정계획 시스템)

  • 신동목;이창호;이기우
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.17 no.5
    • /
    • pp.108-115
    • /
    • 2000
  • This paper presents a variant type process planning system for machining of dies for auto-body production. Through the analysis of dies and their manufacturing processes, the authors categorized the press dies into 15 groups according to the similarity of machining features. After critically reviewing current manufacturing procedures, a standard process plan was defined for each group. The authors present MP3D the process planning system built on the standard process plan database, and show how they apply it at the die manufacturing plant of an automobile company. MP3D is expected to reduce major losses in machining such as reworking caused by mistakenly uncut features and eventually to help to accumulate the knowledge of operators. The operation sheet MP3D produces is also used in monitoring the progress of manufacturing of dies. This paper explains the whole development cycle of a process planning system from process analysis to application so that it can help readers to develop and apply a process planning system to their machine shops.

  • PDF

Developments of a Path Planning Algorithm and Simulator for Unmanned Ground Vehicle (무인자율차량을 위한 경로계획 알고리즘 및 시뮬레이터 개발)

  • Kim, Sang-Gyum;Kim, Sung-Gyun;Lee, Yong-Woo
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.15 no.3
    • /
    • pp.1-9
    • /
    • 2007
  • A major concern for Autonomous Military Robot in the rough terrain is the problem of moving robot from an initial configuration to goal configuration. In this paper, We generate a local path to looking for the best route to move an goal configuration while avoiding known obstacle from world model, not violating the mobility constraints of robot. Trough a Simulator for Unmanned Autonomous Vehicle, We can simulate a traversability of unmanned autonomous vehicle based on steering, acceleration, braking command obtained from local path planning.