• Title/Summary/Keyword: planning & implementation

Search Result 1,184, Processing Time 0.025 seconds

A Study on the Electron Beam Distribution based on Age-diffusion Model (Age diffusion model을 이용한 전자선량 분포에 대한 연구)

  • Kim, S.H.;Suh, T.S.;Na, Y.J.
    • Proceedings of the KOSOMBE Conference
    • /
    • v.1997 no.11
    • /
    • pp.161-163
    • /
    • 1997
  • In this paper, a two-dimensional electron beam dose calculational algorithm implented for use in a two-dimensional radiation therapy planning system is described. The 2-D electron beam calculations have been in use clinically for a few decades. Our algorithm uses Age-diffusion model based int the Boltzman Transport Equation. Our implementation provides convenient user interface associated with electron beam therapy planning and displays radiation dose distribution according to different electron energy on patient images.

  • PDF

A Study on the Cafe' Fantasy Ice Cream Shop Planning (카페 환타지 아이스크림 샾 계획안 연구)

  • Chang, Kyung-Soo
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2005.05a
    • /
    • pp.283-286
    • /
    • 2005
  • A design of Ice Cream Shop is an intended creation activity to increase the sales and profits by planning the space creativity and effectively. Accordingly, it should give the aesthetic and psychological satisfaction by making the space formative as a visual space expressed by a unique identity with a functional convenience. The design of Ice Cream Shop should reflect the changing demands and patterns of a consumption life as a result. Therefore a design plan is required to predict the living and culture. The design process can be divided into a basic planning, basic design and implementation design in large. The details are as follows. When a designer is assigned to the design from a client, he should start his work from surveying the site and arrangement, After arrangement, he sets up basic guidlines, which are called as a basic planning.

  • PDF

A Study on Propulsion system of Rural Development Program in Chungnam Province (지방정부의 농촌개발사업 추진체계의 문제점과 개선과제 - 충청남도를 중심으로 -)

  • Cho, Young-Jae
    • Journal of Korean Society of Rural Planning
    • /
    • v.16 no.1
    • /
    • pp.35-47
    • /
    • 2010
  • With the cognition of the problems on propulsion system of rural development program, the requirement for accurate diagnosis of the problems and for reform scheme is increasing. This study was performed to solve the above requirement especially on the level of a local government, Chungnam province as an instance. For accurate diagnosis of the problems, the present situation of propulsion system, i.e. organization and governance, planning and policy making, implementation and supervision of rural development program was investigated, and the cognition of public officials and specialists was surveyed. From the study, it showed that the problems of propulsion system for rural development program in Chungnam province are duplication of work sphere among departments, formal administration of governance, an absence of long-term plan with vision and strategy, and absence of department in charge of comprehensive supervision and so on. As a result of the study 9 reform schemes to solve the problems were suggested.

Principles and Methodologies for STI Strategy Development: Experience and Best Practices from the Republic of Korea

  • Lee, Jeong Hyop
    • Asian Journal of Innovation and Policy
    • /
    • v.7 no.3
    • /
    • pp.411-437
    • /
    • 2018
  • This paper articulates the STI strategy development principles and methodologies that have been elaborated through iterative processes of STI strategy development cases for the past ten years. The consultation cases include poverty traps in Nepal and Laos, African health challenges in Nigeria and Tanzania, and ASEAN global challenges in Indonesian Water, Vietnamese Green Energy, and Filipino Food, in partnership with some multilateral agencies.The iterative elaboration process has continued with consultation activities on Thailand and on Cambodia, Laos and Myanmar in planning partnership with Thailand. The principles were originally conceptualized from the benchmarking process of the Korean STI development experience. They were further incorporated as methodologies with which relevant planning bodies are guided to address individual and regional challenges through science, technology and innovation strategies. The methodologies are strong in providing plausible holistic perspective scenarios by which various stakeholders can be engaged in the planning and implementation process. But it is heuristic in nature and can be learned only through on-the-job training process. This is the structural limitation for scaling up.

Design and Implementation of Marketing and Sales Information System for Automotive Part Company Using Object-Oriented Methodology (객체지향 방법론을 이용한 자동차부품기업의 영업관리시스템 설계 및 구현)

  • Kang Sung-bae;Moon Tae-Soo
    • The Journal of Information Systems
    • /
    • v.13 no.1
    • /
    • pp.77-95
    • /
    • 2004
  • According to the increase of organizational complexity and the change of rapid information technology environment, many firms have shifted their information technology(IT) strategy from developing information systems in-house to purchasing application software such as Enterprise Resource Planning(ERP) Systems. Marketing and Sales functions within a Korean automotive part company include developing new assembly products, determining pricing, taking customer's orders, and shipping assembly products to customers. Marketing and Sales Information System(MSIS) in ERP system plays an important role in next Production Planning process. MSIS also makes management reporting and decision making faster and more uniform throughout an organization. MSIS promotes thinking about corporate goals, as opposed to thinking only about the goals of a single department or functional area. This paper intends to design and implement a MSIS in ERP systems for Korean automotive part company using object-oriented methodology In order to accomplish the implementation of MSIS in ERP system, we employed UML as its standard modeling language. In this study, four diagramming techniques such as use case diagram, sequence diagram, class diagram, component diagram among eight modeling techniques are used for analyzing hierarchical business process. In traditional marketing and sales function, a company with an unintegrated information system can have marketing and sales data that is data redundant or inaccurate. MSIS integrated in ERP system can solve the sales forecast problem, which minimizes the total costs of production, inventory, and transportation under constraints of production capacity. Also, the use of UML methodology makes S/W programmers shorten the phase of analysis and design in the implementation of MSIS system, and increase the reuse of software and the interoperability with corporate internal Information system.

  • PDF

The Methods and Its Application of Long Distance Trail Planning in a Mountainous Region (산악지역에서의 장거리 트레일 조성 계획방법 및 적용)

  • Hwang, Guk-Woong;Jang, Byoung-Kwan
    • Journal of Korean Society of Rural Planning
    • /
    • v.17 no.3
    • /
    • pp.55-65
    • /
    • 2011
  • Long distance trail or trail system planning is the first important step in transforming your vision into reality. Planning presents a vision for a trail or trail system and brings a comprehensive, long-range perspective. The master plan provides solid, credible recommendations for developing a trail or trail system that is safe, convenient, well used, supported by local residents, practicality to implement, and customized to meet the needs of the community, you will need to follow a logical planning. The key elements of master planning includes site assessment, vision, goals and objectives, routing and design, implementation strategies. Trails or trail systems should provide linkages to popular destinations, safely accommodate a variety of users, and be sensitive to any negative impacts on the natural environment and wildlife. Trails planners also need to think about how the trail, or trail system will function in the future as areas are developed or trail population increases. All of these factors during the planning process will ensure the existence of high-quality facilities for years to come. Project for Nakdong-jungmaek trail planning combine long distance trail with circuit way. That project is a planning brought out the best in each of Tokai natural way and Cotswold way. That is planning which is combined a wooded trail in Tokai natural way with access and facilities improving economy in Cotswold way. Also That planning embraces a core cultural center which is concerned forest or wood to come more people.

The Landscape Ecological Management System (LEMS) for Assessing the Landscape Ecological Performance of Urban Developments (도시개발의 경관생태적 성능 평가를 위한 경관생태관리시스템(LEMS) 구축에 관한 연구)

  • Oh, Kyushik;Lee, Dongwoo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.15 no.5
    • /
    • pp.49-67
    • /
    • 2012
  • Studies on landscape ecology have focused on conceptual aspects, while empirical focus for spatial planning has been rarely conducted. This study conducted an empirical analysis to enhance landscape ecological performance of urban developments using landscape ecology. To do so, concrete criteria and standards to analyze structural, functional and variational mechanisms of urban landscape ecology were developed. An integrated landscape ecology assessment model that can be applied to urban development planning was established by combining the criteria. Next, Landscape Ecological Management System (LEMS) was developed to implement an integrated assessment using GIS. To verify the effectiveness of the system, a case study was conducted using LEMS on Byulnae City in the Seoul Metropolitan Area. The LEMS can be useful for urban planners and policy makers in their selection of desirable planning alternatives. Moreover, the LEMS developed in this study can be a useful tool for academia in terms of the implementation of further related studies, and for planning professionals in their environmental impact assessment tasks.

The Case Study on the Tourism Resources Development of Rural Landscape - Focusing on action plan village project at Susanri in Jeju - (농촌경관의 관광자원화 구현 사례연구 - 제주지역 수산리 마을사업 실행계획 중심으로 -)

  • Ra, Jeung-Im;Yang, Sung-Soo
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.3
    • /
    • pp.143-151
    • /
    • 2016
  • The purpose of this study is to introduce the village project for conservation and improvement of rural tourism village. So, in this study, the current rural tourism village and storytelling planning are examined and the village project presented in village planning is also examined. And this study propose the storytelling implementation of the village project through the case study related with the Susanri in Jeju. The results are summarized as follows. Firstly, it is important that each village projects are storytelling for tourism resource and improve rural tourism village. Secondly, it is necessary to define story range, action planning, and management agency of village projects. Thirdly, it is desirable that the village projects should be carried out as reviving the local community. Comparing to the storytelling tourism plan, there are few rural tourism plans so far, so, it is difficult to applicate the system of the village project, but, continuous studies in this line can help the rural tourism plan to ensure practicality.

Delay Factor Analysis of Public Project Based on System Dynamics (SD를 이용한 공공 프로젝트의 지체요인 분석)

  • 이만형;이정민
    • Korean System Dynamics Review
    • /
    • v.4 no.2
    • /
    • pp.95-130
    • /
    • 2003
  • The purpose of this study is to find what causes make public projects hold off, going beyond the planned deadline and budget. Using System Dynamics(SD) and their derivative Urban Dynamics(UD) models, it intends to analyze major feedback loops based on VENSIM and to simulate them with STELLA software, all of which are interrelated with various causes of project delay. To prevent or ameliorate project delay, first of all it advises to focus on endogenous delaying factors not exogenous ones. These factors either reinforce or balance certain loops in complex causal structure, In the case example on the Cremation Building Project in Cheongju, Residents’ participation demand make negotiation put off and delayed negotiation reinforces administrative-expediency planning in order to observe a time limit, on the other hand, once building consensus, it increase both the level of planning performance and public trust. In the meantime, the real planning process used to neglect residents opinions and manage public grievance only through compensation, he a result of simulation, visible fruit of negotiation in the initial phase seems to be not satisfactory owing to funds and time consumed, but after reaching an mutual agreement among stakeholders, planning performance is effective and strategic than administrative-expediency planning viewed in both financial and time angle. It proposes to devise specific tools schematizing project implementation. In order to upgrade the quality of project management, it recommends for planners to adopt key concepts based on SD/UD diagrams and causal loops, which would contribute to enriching Planning abbots.

  • PDF