• Title/Summary/Keyword: plan comparing

Search Result 635, Processing Time 0.025 seconds

Comparing floor height reduction effect of slim floor system with square steel pipe (각형강관을 이용한 슬림플로어 시스템의 층고절감효과 비교)

  • Cho, Youn-Jin;Rhim, Hong-Chul;Kim, Dae-You;Lyu, Seung-Il;Kim, Do-Kyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.56-57
    • /
    • 2017
  • In recent years, new construction methods have been required to reduce the construction cost and increase the available area in an environment where construction work is frequently performed in a narrow urban area like Korea. As a result of these studies, slim floor composite beam has been suggested. Slim floor composite beam can reduce required depth because web of steel beam is embedded in the slab, so it is effective to reduce floor height and increase the available area. The purpose of this study is the floor height reduction evaluation by comparing system consisting of reinforced concrete, steel, and slim floor using square-shape steel pipe. After doing structural design for a typical plan, checked effectiveness by comparing each design plan. It is proven that slim floor composite beam can reduce required depth effectively comparing required materials of other system.

  • PDF

A Study on the Strategy of Sustainable Hospital Architecture Masterplan (지속가능한 병원건축 마스터플랜 전략에 관한 연구)

  • Park, Cheolkyun;Yang, Naewon
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.26 no.4
    • /
    • pp.15-26
    • /
    • 2020
  • Purpose: The purpose of this study is to derive a plan to establish a more sophisticated master plan so that the direction of master plan study can be sustained in the mid to long term. Methods:: Compare and analyze the differences between the master plan and the design to identify causes and problems. First, after establishing the master plan, compare the expansion area, net area per bed, and service area with the design drawing of the first project to determine the degree of recovery to the level required by the recent medical environment. Second, the possibility of responding to future internal changes is reviewed by comparing and analyzing the arrangement and connection method of extension buildings. Third, comparing the difference between the project following the first project and the phased of masterplan. Results: The first one is that continuous participation of person or group with high understanding of the master plan. Second, establishing a master plan and proceeding with the project through the determination of the correct business budget. Third, a specific area of the mechanical and electrical room suitable for the size and purpose of the hospital should be presented, and research on the arrangement method should be conducted. Finally, the feasibility of the hospital's own plan for securing parking facilities should be accurately investigated. Implications: It is important for the hospital to recover from the past to the present and respond to the future that the direction of the master plan continues after the establishment.

A Study on Rational Alternative Comparison of Prior Review on Environmental Conditions for Basic Plan of Public Waters Reclamation (공유수면매립 기본계획 사전환경성검토의 합리적인 대안비교에 관한 연구)

  • Maeng, Jun-Ho;Cho, Kwang-Woo;Byon, Seong-Soo
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.6
    • /
    • pp.563-571
    • /
    • 2010
  • In carrying out the prior review on environmental conditions for basic plan of public waters reclamation, the important item is review on conditions of location on prearranged reclaimed land. In this study, environmental assessment which needs careful consideration in the first stage of selecting location is presented by analyzing environmental impact assessment on public waters reclamation projects for about 10 years. The assessment index for alternative comparison is divided into two parts according to importance level. What is most important in alternative comparison is the comparison on direct influence due to reclamation. In other words, it figures out damaged extent of natural shoreline as well as intertidal and infralittoral zones. Comparing influence extent due to reclamation through the 1st comparison on this is regarded as to be important. In case there is no significant difference by alternatives through the 1st assessment, the 2nd assessment should be carried out. In the 2nd assessment indexes are damaged quantity of benthic organism, change in seawater current, erosion, accumulation and exchangeable rate of seawater. The plan for selecting optimal location which minimizes environmental influence in establishing public waters reclamation plan is demonstrated through model cases. For this, 3 districts which have similar environment and scale are selected, and then comparison on location alternative is made through environmental assessment index. In addition, the comparison on 3 arrangement alternatives are conducted, targeting certain areas. It is thought that carrying out comparison review on respective areas in the same cities and counties, not merely comparing arrangement plan by selecting 1 targeting area in advance, is the most appropriate. Besides, selection of arrangement plan considering environment, which minimizes damage of natural shoreline and influence due to change of seawater current is required in alternative comparison on arrangement plan as well. In case of the prior review on environmental conditions though alternative comparison method presented in this study is carried out, it is safely said that the influence on ocean environment due to public waters reclamation can be minimized.

A Study on the Layout Planning of Multiple Plants (작업장(作業場) 전산배치기법(電算配置技法)에 관한 연구)

  • Park, Seung-Hun
    • IE interfaces
    • /
    • v.6 no.1
    • /
    • pp.87-97
    • /
    • 1993
  • In this paper, the plant layout planning is optimized at the K-area of the K-airline. The K-area includes 15 activies. The initial solution is found qualitatively by designing a space relationship diagram for the relationship. The cost of material handling is minimized by finding the final layout plan using CRAFT. In comparing to the master plan of K-airline, the final layout plan in this research can reduce the cost of material handling by 52%.

  • PDF

Efficiency Estimation of Process Plan Using Tolerance Chart

  • Kim I.H.;Dong Zuomin
    • Korean Journal of Computational Design and Engineering
    • /
    • v.11 no.2
    • /
    • pp.148-155
    • /
    • 2006
  • This paper presents a new method for assessing the efficiency of production process plans using tolerance chart to lower production cost. The tolerance chart is used to predict the accuracy of a part that is to be produced following the process plan, and to carry out the quantitative measurement on the efficiency of the process plan. By comparing the values of design tolerances and their corresponding resultant tolerances calculated using the tolerance chart, the process plan that is incapable of satisfying the design requirements and the faulty production operations can be identified. Similarly, the process plan that imposes unnecessarily high accuracy and wasteful production operations can also be identified. For the latter, a quantitative measure on the efficiency of the process plan is introduced. The higher the unnecessary cost of the production, the poor is the efficiency of the process plan. A coefficient is introduced for measuring the process plan efficiency. The coefficient also incorporates two weighting factors to reflect the difficulty of manufacturing operations and number of dimensional tolerances involved. To facilitate the identification of the machining operations and the machined surfaces, which are related to the unnecessarily tight resultant tolerances caused by the process plan, a rooted tree representation of the tolerance chart is introduced, and its use is demonstrated. An example is presented to illustrate the new method. This research introduces a new quantitative process plan evaluation method that may lead to the optimization of process plans.

Improved Methods of Cost Sharing in Apartment Remodeling Projects (공동주택 리모델링 사업 분담금 산정의 문제점 및 개선방안)

  • Kim, Jeong-Won;Lee, Dong-Jin;Lee, Min-Joo;Lee, Ji-Hyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.184-185
    • /
    • 2019
  • The purpose of this study is to suggest the improved methods for cost sharing in apartment remodeling projects. Case studies on apartment remodeling projects with different plan type were analyzed and compared. Cost sharing estimated by 'proportional rate method' shows similar results estimated by 'return on investment method' in case of similar area ratio of existing plan to remodeling plan. Otherwise cost sharing estimated by 'proportional rate method' shows great differences comparing the results estimated by 'return on investment method'. Although return on 'proportional rate method' is widely used, it is not proper to estimate cost sharing when each householder's contribution for the project varies, such as considerable differences area ratio of existing plan to remodeling plan. Improved cost sharing method is needed taking into account project contribution and characteristics.

  • PDF

Dosimetric Evaluation of an Automatically Converted Radiation Therapy Plan between Radixact Machines

  • Lee, Mi Young;Kang, Dae Gyu;Kim, Jin Sung
    • Progress in Medical Physics
    • /
    • v.31 no.4
    • /
    • pp.153-162
    • /
    • 2020
  • Purpose: We aim to evaluate the accuracy and effectiveness of an automatically converted radiation therapy plan between Radixact machines by comparing the original plan with the transferred plan. Methods: The study involved a total of 20 patients for each randomly selected treatment site who received radiation treatment with Radixact. We set up the cheese phantom (Gammex RMI, Middleton, WI, USA) with an Exradin A1SL ion chamber (Standard Imaging, Madison, WI, USA) and GAFCHROMIC EBT3 film (International Specialty Products, Wayne, NJ, USA) inserted. We used three methods to evaluate an automatically converted radiation therapy plan using the features of the Plan transfer. First, we evaluated and compared Planning target volume (PTV) coverage (homogeneity index, HI; conformity index, CI) and organs at risk (OAR) dose statistics. Second, we compared the absolute dose using an ion chamber. Lastly, we analyzed gamma passing rates using film. Results: Our results showed that the difference in PTV coverage was 1.72% in HI and 0.17% in CI, and majority of the difference in OAR was within 1% across all sites. The difference (%) in absolute dose values was averaging 0.74%. In addition, the gamma passing rate was 99.64% for 3%/3 mm and 97.08% for 2%/2 mm. Conclusions: The Plan transfer function can be reliably used in appropriate situations.

Design of an Economic Double Sampling System (검사비용절감(檢査費用節減)을 위한 2회(回) 샘플링검사(檢査)의 설계(設計))

  • Bae, Do-Seon;Kim, Seong-In;Jeon, Gyeong-Pyo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.5 no.1
    • /
    • pp.7-17
    • /
    • 1979
  • A procedure for constructing a double sampling plan with zero acceptance number for the first sample whose combined sample size does nat exceed that of the given single or double sampling plan is studied. Using this procedure a double sampling system is proposed that can be used in place of MIL-STD-105D system when the quality history is good, and its composite quality characteristics are tabulated and compared with those of MIL-STD-105D system. The study reveals that composite ASN's of the proposed double sampling system are considerably smaller than those of corresponding MIL-STD-105D system with no appreciable changes in other composite quality characteristics. The procedure is also applied to K SA 3102 plans with similar results. A cost model that can be used in comparing a given single sampling plan with the proposed double sampling plan is also developed.

  • PDF

An Improved Group Sampling Plan Based on Time-Truncated Life Tests

  • Aslam, Muhammad;Pervaiz, Muhammad Khalid;Jun, Chi-Hyuck
    • Communications for Statistical Applications and Methods
    • /
    • v.17 no.3
    • /
    • pp.319-326
    • /
    • 2010
  • In this paper, a new group sampling plan for the lot acceptance is proposed for the time truncated life test, which can be utilized when multi-item testers are implemented. The design parameters are found using the two-point approach such that the producer's and consumer's risks are satisfied simultaneously at the acceptable reliability level and the lot tolerance reliability level, respectively. The case of Weibull distribution is described to illustrate the procedure that can be used when the quality level is expressed by a multiple of the specified life. The advantage of the proposed plan is demonstrated by comparing with the existing plan in terms of the sample size required. The tables are constructed and some examples are given to illustrate the procedure developed here.