• Title/Summary/Keyword: pier bridge

Search Result 489, Processing Time 0.024 seconds

An Experimental Study to Evaluate Hydraulic Characteristics and Stability of Scour Protection for Historic Site Restoration of Woljeong-gyo (월정교 사적지 복원을 위한 수리특성 및 세굴보호공 안정성 검토에 관한 수리모형실험 연구)

  • Kang, Joon-Gu;Yeo, Hong-Koo;Son, Byung-Ju;Ji, Un
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.8
    • /
    • pp.845-854
    • /
    • 2008
  • The old bridge of Woljeong-gyo, which has the fluvial history and culture, represents the ancient construction and civil engineering techniques. It is the oldest stone bridge in Korea and currently restored with its vicinities. In this study, the experimental model was used to analyze the hydraulic characteristics, the local pier-scour depth without scour protection, and the stability of riprap protection using the old grid type panels and stones for Woljeong-gyo of the study area. The water levels were increased around 30cm due to the restored bridge piers and foundations and the effects went up to 200m upstream. The maximum scour depth of 5.4m was measured and the scour protection tests were performed with the riprap size calculated using empirical equations and the existing scour protection range. The riprap of the existing scour protection in the upstream side was broken away, while the riprap of extended scour protection was very stable for the design flood condition of Woljeong-gyo area.

Verification of Real-time Hybrid Test System using RC Pier Model (RC교각을 이용한 실시간 하이브리드 실험 시스템의 적용성 연구)

  • Lee, Jinhaeng;Park, Minseok;Chae, Yunbyeong;Kim, Chul-Young
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.22 no.4
    • /
    • pp.253-259
    • /
    • 2018
  • Structure behaviors resulting from an earthquake are experimentally simulated mainly through a shaking table test. As for large-scale structures, however, size effects over a miniature may make it difficult to assess actual behaviors properly. To address this problem, research on the hybrid simulation is being conducted actively. This method is to implement numerical analysis on framework members that affect the general behavior of the structure dominantly through an actual scale experiment and on the rest parts by applying the substructuring technique. However, existing studies on hybrid simulation focus mainly on Slow experimental methods, which are disadvantageous in that it is unable to assess behaviors close to the actual level if material properties change depending on the speed or the influence of inertial force is significant. The present study aims to establish a Real-time hybrid simulation system capable of excitation based on the actual time history and to verify its performance and applicability. The hybrid simulation system built up in this study utilizes the ATS Compensator system, CR integrator, etc. in order to make the target displacement the same with the measured displacement on the basis of MATLAB/Simulink. The target structure was a 2-span bridge and an RC pier to support it was produced as an experimental model in order for the shaking table test and Slow and Real-time hybrid simulations. Behaviors that result from the earthquake of El Centro were examined, and the results were analyzed comparatively. In comparison with the results of the shaking table test, the Real-time hybrid simulation produced more similar maximum displacement and vibration behaviors than the Slow hybrid simulation. Hence, it is thought that the Real-time hybrid simulation proposed in this study can be utilized usefully in seismic capacity assessment of structural systems such as RC pier that are highly non-linear and time-dependent.

Scour around Piers in the Stage Hydrograph (수위변화에 따른 교각주위에서의 세굴현상연구)

  • An, Sang-Jin;Yeon, Gi-Seok
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.4
    • /
    • pp.335-346
    • /
    • 1997
  • This study aims at examining closely the scour around a pier due to irregular water stage changes during flood. At the Sangye bridge is located lowermost downstream of the Bocheong stream in the Kum River, the IHP experimental watershed. For this purpose, we have analyzed the change of scour depths due to stage hydrographs of experimental basin by a simulation. To examine the scour phenomenon around a pier due to irregular stage change in flood, we have analyzed the change of scour depth corresponding to stage hydrograph of field watershed after verification of model channel. From this study, the following conclusions are made: First, in case of predicting the maximum scour depth around a pier with stage hydrograph in the state of steady flow, we should choose the highest stage. Second, after increasing the stage, the equilibrium scour depth became smaller than the maximum scour depth. Therefore, in case of estimating the maximum scour depth in rivers, it is recommended that we should consider additional scour depth with is reduced by infilling the sediments.

  • PDF

Load-carrying capacity degradation of reinforced concrete piers due to corrosion of wrapped steel plates

  • Gao, Shengbin;Ikai, Toyoki;Ni, Jie;Ge, Hanbin
    • Steel and Composite Structures
    • /
    • v.20 no.1
    • /
    • pp.91-106
    • /
    • 2016
  • Two-dimensional elastoplastic finite element formulation is employed to investigate the load- carrying capacity degradation of reinforced concrete piers wrapped with steel plates due to occurrence of corrosion at the pier base. By comparing with experimental results, the employed finite element analysis method is verified to be accurate. After that, a series of parametric studies are conducted to investigate the effect of corrosion ratio and corrosion mode of steel plates located near the base of in-service pier P2 on load-carrying capacity of the piers. It is observed that the load-carrying capacity of the piers decreases with the increase in corrosion ratio of steel plates. There exists an obvious linear relationship between the load-carrying capacity and the corrosion ratio in the case of even corrosion mode. The degradation of load-carrying capacity resulted from the web's uneven corrosion mode is more serious than that under even corrosion mode, and the former case is more liable to occur than the latter case in actual engineering application. Finally, the failure modes of the piers under different corrosion state are discussed. It is found that the principal tensile strain of concrete and yield range of steel plates are distributed within a wide range in the case of slight corrosion, and they are concentrated on the column base when complete corrosion occurs. The findings obtained from the present study can provide a useful reference for the maintenance and strengthening of the in-service piers.

Inspection of A Deteriorated Bridge Pier Cap Using Common Nondestructive and Destructive Test (파괴 및 비파괴 검사를 이용한 노후 교량의 교각 두부 조사)

  • Kim, Tae Wan;Hong, Sung Nam;Han, Kyoung Bong;Park, Sun Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.2
    • /
    • pp.91-102
    • /
    • 2008
  • Nondestructive testing techniques have been historically and commonly used to evaluate the quality of existing concrete structures. The techniques utilized included visual inspection, hammer sounding, Schmidt hammer rebounding, and ultrasonic pulse velocity testing including tomographic imaging. Results of the nondestructive tests were used to determine areas to be tested with local destructive tests. These tests included concrete compressive strengths, chloride testing, and petrographic testing. The overall results indicate that inside core of each of the pier caps are healthy. On all of the pier caps, extensive exterior concrete layer rehabilitation needs to be completed. This paper shows the application and interpretation of common nondestructive testing techniques and the consequent repair, rehabilitation, maintenance decisions and safety assesment.

Inelastic Design of Continuous-Span Composite Plate Girder Bridges by LRFD Method (비탄성 설계법에 의한 플레이트 거더 연속교의 LRFD 설계)

  • Cho, Eun Young;Shin, Dong Ku
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.4
    • /
    • pp.469-481
    • /
    • 2008
  • The inelastic design of the three-span continuous composite plate girder with consideration of moment redistribution over the interior pier is performed using the LRFD method. The design of the girder section, based on the inelastic method, is compared with that by the conventional elastic design. The length of the center span for the three-span continuous bridge ranges from 40m to 70m and the relative ratio of the span length is assumed to be 4:5:4. Although the AASHTO- LRFD specifications are applied in the design of the composite girder, the recently proposed new design live load is used. After determining the maximum positive and negative sections by the elastic design for various limit states, the amount of moment redistributed to the maximum positive moment section is calculated. With the increased design moment due to moment redistribution from the interior pier, the maximum positive section designed by the elastic method is checked for the strength limit state and the service limit state. The maximum negative moment section is redesigned by reducing the size of the steel girder relative to the section designed by the elastic method and the new section is checked for the service limit state. Based on the design results for the five bridges considered in this study, it is estimated that about 23% of steel can be saved in the interior pier section if it is designed by the inelastic method compared with that designed by the elastic method.

Quasi-static test of the precast-concrete pile foundation for railway bridge construction

  • Zhang, Xiyin;Chen, Xingchong;Wang, Yi;Ding, Mingbo;Lu, Jinhua;Ma, Huajun
    • Advances in concrete construction
    • /
    • v.10 no.1
    • /
    • pp.49-59
    • /
    • 2020
  • Precast concrete elements in accelerated bridge construction (ABC) extends from superstructure to substructure, precast pile foundation has proven a benefit for regions with fragile ecological environment and adverse geological condition. There is still a lack of knowledge of the seismic behavior and performance of the precast pile foundation. In this study, a 1/8 scaled model of precast pile foundation with elevated cap is fabricated for quasi-static test. The failure mechanism and responses of the precast pile-soil interaction system are analyzed. It is shown that damage occurs primarily in precast pile-soil interaction system and the bridge pier keeps elastic state because of its relatively large cross-section designed for railways. The vulnerable part of the precast pile with elevated cap is located at the embedded section, but no plastic hinge forms along the pile depth under cyclic loading. Hysteretic curves show no significant strength degradation but obvious stiffness degradation throughout the loading process. The energy dissipation capacity of the precast pile-soil interaction system is discussed by using index of the equivalent viscous damping ratio. It can be found that the energy dissipation capacity decreases with the increase of loading displacement due to the unyielding pile reinforcements and potential pile uplift. It is expected to promote the use of precast pile foundation in accelerated bridge construction (ABC) of railways designed in seismic regions.

Strain Analysis of Longitudinal Reinforcing Steels of RC Bridge Piers Under Shaking Test (진동대 실험에 의한 RC교각의 주철근 변형률 분석)

  • Hong, Hyun-Ki;Yang, Dong-Wook;Chung, Young-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.93-96
    • /
    • 2008
  • The near fault ground motion(NFGM) is characterized by a single long period velocity pulse of large magnitude. NFGM's have been observed in recent strong earthquakes, Turkey Izmit (1999), Japan Kobe(1995), Northridge(1994), etc. These strong earthquakes have caused considerable damage to infrastructures because the epicenter was close to the urban area, called as NFGM. Extensive research for the far fault ground motion(FFGM) have been carried out in strong seismic region, but limited research have been done for NFGM in low or moderate seismic regions because of very few records. The purpose of this study is to investigate and analyze the effect of near-fault ground motions on RC bridge piers without lap-spliced longitudinal reinforcing steels. The seismic performance of two RC bridge piers under near-fault ground motions was investigated on the shake table. In addition, Two of four identical RC bridge piers were tested under a quasi-static load, and the others were under a pseudo-dynamic load. The respectively two RC bridge pier is comparatively subjected to Pseudo-dynamic loadings and Quasi-Static loadings. This paper indicated that more gives bigger ultimate strain of longitudinal steels to be fractured at bigger PGA motion.

  • PDF

A distributed piezo-polymer scour net for bridge scour hole topography monitoring

  • Loh, Kenneth J.;Tom, Caroline;Benassini, Joseph L.;Bombardelli, Fabian A.
    • Structural Monitoring and Maintenance
    • /
    • v.1 no.2
    • /
    • pp.183-195
    • /
    • 2014
  • Scour is one of the leading causes of overwater bridge failures worldwide. While monitoring systems have already been implemented or are still being developed, they suffer from limitations such as high costs, inaccuracies, and low reliability, among others. Also, most sensors only measure scour depth at one location and near the pier. Thus, the objective is to design a simple, low cost, scour hole topography monitoring system that could better characterize the entire depth, shape, and size of bridge scour holes. The design is based on burying a robust, waterproofed, piezoelectric sensor strip in the streambed. When scour erodes sediments to expose the sensor, flowing water excites it to cause the generation of time-varying voltage signals. An algorithm then takes the time-domain data and maps it to the frequency-domain for identifying the sensor's resonant frequency, which is used for calculating the exposed sensor length or scour depth. Here, three different sets of tests were conducted to validate this new technique. First, a single sensor was tested in ambient air, and its exposed length was varied. Upon verifying the sensing concept, a waterproofed prototype was buried in soil and tested in a tank filled with water. Sensor performance was characterized as soil was manually eroded away, which simulated various scour depths. The results confirmed that sensor resonant frequencies decreased with increasing scour depths. Finally, a network of 11 sensors was configured to form a distributed monitoring system in the lab. Their exposed lengths were adjusted to simulate scour hole formation and evolution. Results showed promise that the proposed sensing system could be scaled up and used for bridge scour topography monitoring.

Numerical Analysis of Flow and Bed Changes for Selecting Optimized Section of Buried Water Pipeline Crossing the River (하천을 횡단하는 도수관로의 최적 매설구간 선정을 위한 흐름 및 하상변동 수치모의)

  • Jang, Eun-Kyung;Ji, Un
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.3
    • /
    • pp.1756-1763
    • /
    • 2014
  • A water pipeline buried under the riverbed could be exposed by bed erosion, therefore safe crossing sections should be analyzed for preventing damages due to the exposure of pipelines. In this study, flow and bed changes have been simulated using a two-dimensional numerical model for selecting the optimized section of pipeline crossing in the Geum River. As a result of simulation with the 20-year recurrence flood, sediment deposition has been distributed overall in the channel and bed erosion over 2 m has occurred near bridge piers. For the extreme flood simulation, the channel bed near the bridge piers has been eroded down to the buried depth. Therefore, within 140 m upstream of the bridge piers, bed erosion affects a buried pipeline in safety due to bridge pier effects and the crossing section over 150 m upstream of bridge piers is selected as a safe zone of a water pipeline.