• 제목/요약/키워드: peak time

검색결과 4,652건 처리시간 0.034초

가교폴리에틸렌(XLPE)의 부분방전에 의한 초음파 검출 (Detection of Ultrasonic Wave Signals Associated with Partial Discharge in XLPE)

  • 김성규;이상우;구경철;김충년;김인식;이광식;이동인
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 1999년도 학술대회논문집-국제 전기방전 및 플라즈마 심포지엄 Proceedings of 1999 KIIEE Annual Conference-International Symposium of Electrical Discharge and Plasma
    • /
    • pp.136-140
    • /
    • 1999
  • Measurements of AE signals caused by partial discharges were performed by using an ultrasonic measurement technique to diagonise the electrical treeing deterioration in XLPE cable. We also examined the partial discharge magnitude and AE signals(peak-to-peak) with the increase of the deterioration time. From these results, it was found that AE signal due to partial discharge can be greatly detected at the peak value of positive polarities prior to the breakdown voltages, and the magnitude of AE signals was closely related to the current pulses by the increase of deterioration, and it appeared that AE signals(peak-to-peak) was proportional to partial discharge magnitude. Attenuation and time-delaying characteristics of ultrasonic signals propagated in various polymers sample by using ultrasonic oscillation and receiving systems are also reported as a basic data of ultrasonic measurements in XLPE cable.

  • PDF

A Fast Response Integrated Current-Sensing Circuit for Peak-Current-Mode Buck Regulator

  • Ha, Jung-Woo;Park, Byeong-Ha;Kong, Bai-Sun;Chun, Jung-Hoon
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • 제14권6호
    • /
    • pp.810-817
    • /
    • 2014
  • An on-chip current sensor with fast response time for the peak-current-mode buck regulator is proposed. The initial operating points of the peak current sensor are determined in advance by the valley current level, which is sensed by a valley current sensor. As a result, the proposed current sensor achieves a fast response time of less than 20 ns, and a sensing accuracy of over 90%. Applying the proposed current sensor, the peak-current-mode buck regulator for the mobile application is realized with an operating frequency of 2 MHz, an output voltage of 0.8 V, a maximum load current of 500 mA, and a peak efficiency of over 83%.

관악산에 식재된 리기다소나무림에서의 낙엽의 생산과 분해 (Litter Production and Decomposition in the Pinus rigida Plantation in Mt. Kwan-ak)

  • Kim, Jae-Geun;Chang, Nam-Kee
    • The Korean Journal of Ecology
    • /
    • 제12권1호
    • /
    • pp.9-20
    • /
    • 1989
  • Annual production and decomposition of litter were studied in piuns rigida platation in Mt. Kwan-ak. The peak time of litter production was October-November. The litterfalll at that time was 54% of annual litter production. But the peak time of litterfall of reproductive parts was Junejuly. The peak times of litter production in Alnus hirsuta plantation were June-July, and November. It is thought that difference of seasonal distribution of letterfall between two forest types were assigned to litter falling factors such as temperature and insects. Total amount of letter loss increased according to time. Particulary, the peak time of loss rate was July-August. It was shown that the protein and phosphorus were accumulated in the letter for an experimental period. The amount of crude protein increased to 150% of initial amount. The amount of potassium was increased by August and then decreased rapidly. The contents of crude fat, holocellulose, lignin, and Na were decreased slowly. The loss of holocellulose was the largiest among them. Calcium was in steady state. It was thought that this variation pattern was assigned to leaching of soluble parts by high temperature, rainfall and growth rate of microorganisms.

  • PDF

전기자동차의 충전부하 모델링 및 충전 시나리오에 따른 전력계통 평가 (Evaluation of the Charging effects of Plug-in Electrical Vehicles on Power Systems, taking Into account Optimal Charging Scenarios)

  • 문상근;곽형근;김진오
    • 전기학회논문지
    • /
    • 제61권6호
    • /
    • pp.783-790
    • /
    • 2012
  • Electric Vehicles(EVs) and Plug-in Hybrid Electric Vehicles(PHEVs) which have the grid connection capability, represent an important power system issue of charging demands. Analyzing impacts EVs charging demands of the power system such as increased peak demands, developed by means of modeling a stochastic distribution of charging and a demand dispatch calculation. Optimization processes proposed to determine optimal demand distribution portions so that charging costs and demand can possibly be managed. In order to solve the problems due to increasing charging demand at the peak time, alternative electricity rate such as Time-of-Use(TOU) rate has been in effect since last year. The TOU rate would in practice change the tendencies of charging time at the peak time. Nevertheless, since it focus only minimizing costs of charging from owners of the EVs, loads would be concentrated at times which have a lowest charging rate and would form a new peak load. The purpose of this paper is that to suggest a scenario of load leveling for a power system operator side. In case study results, the vehicles as regular load with time constraints, battery charging patterns and changed daily demand in the charging areas are investigated and optimization results are analyzed regarding cost and operation aspects by determining optimal demand distribution portions.

2004년 하계 첨두부하 시 계통운영 실적 분석 (The Analysis of 2004 Summer Peak Load in Korea Power system)

  • 송태용;황봉환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.113-115
    • /
    • 2004
  • This year korea power system had recorded highest peak load for 6 times and finally it made new peak load 51,264MW at July 29th 3:00 PM. The new peak load is increased 8.2% from the last year peak load 47,385MW and korea power system entered 50,000MW load era. The Korea Power Exchange (KPX) snapped power system data at the peak load time using state estimation function in the EMS. And authors converted the power system data at peak load to PSS/E power flow format. Using this PSS/E peak load power flow data, this paper explains demand analysis result shun capacitor operation, voltage distribution at the peak load. And the paper shows the simulation result of 2 contingency analysis using the snapped PSS/E peak load data.

  • PDF

면적감소계수에 따른 첨두유량의 비교연구 (Comparison and analysis of peak flow by Areal Reduction Factor)

  • 백효선;이대영;강영복;최한규
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2007년도 학술발표회 논문집
    • /
    • pp.1798-1802
    • /
    • 2007
  • The practice of business estimate flood discharge by rainfall-flow relation that is easy collection of observation data. The important factor is rainfall, coefficient of runoff, and drainage area for analysis of runoff-flow relation.The practice of business usually use probability rainfall that use a weighted average value after each observation post estimate probability of non-same time. It has more error than same time probability rainfall, and it can excess of estimation because it can't consider space distribution of rainfall.The study of result showed similar aspect with existing ARF but width of coefficient become smaller. And the comparison of peak flow did not different what used by ARF and same time probability rainfall(A group). But non-same time probability rainfall is bigger 25% more than another(B group). Between A group and B group of the difference increased with the lapse of time.

  • PDF

면적감소계수에 따른 첨두유량의 비교 분석 (Comparison and analysis of peak flow by Areal Reduction Factor)

  • 이대영;최한규
    • 산업기술연구
    • /
    • 제27권A호
    • /
    • pp.95-102
    • /
    • 2007
  • The practice of business estimate flood discharge by rainfall-flow relation that is easy collection of observation data. The important factor is rainfall, coefficient of runoff, and drainage area for analysis of runoff-flow relation. The practice of business usually use probability rainfall that use a weighted average value after each observation post estimate probability of non-same time. It has more error than same time probability rainfall, and it can excess of estimation because it can't consider space distribution of rainfall. The study of result showed similar aspect with existing ARF but width of coefficient become smaller. And the comparison of peak flow did not different what used by ARF and same time probability rainfall(A group). But non-same time probability rainfall is bigger 25% more than another(B group). Between A group and B group of the difference increased with the lapse of time.

  • PDF

Level Crossing과 DPCM을 사용한 유성음/무성음/묵음의 분류 (Voiced/Unvoiced/Silence Classification of Speech Signal by Level Crossing and DPCM)

  • 김진영;성굉모
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1987년도 전기.전자공학 학술대회 논문집(II)
    • /
    • pp.1615-1618
    • /
    • 1987
  • 시간 영역에서 만들어진 음성신호의 파라미터을 이용하여 주어진 음성신호의 구간이 유성음, 무성음, 혹은 묵음인지를 분류하는 새로운 알고리듬을 제시하였다. 이에 사용한 파라미터은 구간내에서 샘플링된 값의 절대치 합과 일정한 level 이상의 peak의 합(T-peak), T-peak와 절대치 합의 비 그리고, DPCM의 절대치 합들이다. 이를 파라미터를 이용하여 간단히 유성음/무성음/묵음 구간을 분류 할였다. This paper proposes new algorithm for classifying speech signal frame into voiced, unvoiced, silence frame, using the parameters extracted from time domain behavior of speech signal The parameters used in this paper are absolute magnitude, the sum of peaks lager than reference level (T-peak), the ratio of T-peak to absolute magnitude and the magnitude of signal outputs of DPCM. Using this parameters, speech signal is more easily classified into voiced/unvoiced/silence frame.

  • PDF

솔레노이드 타입 디젤 커먼레일 인젝터 구동을 위한 전류 파형 변화에 따른 분사 연료 압력파 특성 (A Study on Characteristics of Injected Fuel Pressure Waves of a Solenoid Type Diesel Common Rail Injector with Controlling Current Wave for Driving the Injector)

  • 김길태;이충훈
    • 한국분무공학회지
    • /
    • 제21권3호
    • /
    • pp.155-161
    • /
    • 2016
  • Injected fuel pressure waves of a common rail injector with various current profiles supplied to the injecor were measured using Bosch method. In order to drive the common rail injector, the current in the solenoid should be controlled using what is known as a peak and hold pattern, which consists of a high current level with a short time duration (peak) in the first step and a low current level with a long time duration (hold) in the subsequent step. The current profile can be shaped by swithcing an injector driving power source with the peak and hold waves. The capture, compare and PWM (CCP) pin in the microprocessor was used to generate the combined peak and hold waves. The PWM square wave generated from the CCP pin has a duty ratio of 100% for the peak current and 10% or 30% for the hold pattern. Five patterns of the current profile were generated by combining the peak and hold wave. The common rail pressure is controlled at 75, 100, and 130 MPa. As the fuel rail pressure increases, the variations of the measured fuel injection pressure wave according to the current profiles decrease.

한국주요빙계의 소유역에 대한 순간단위권 유도에 관한 연구 (I) (Studies on the Derivation of the Instantaneous Unit Hydrograph for Small Watersheds of Main River Systems in Korea)

  • 이순혁
    • 한국농공학회지
    • /
    • 제19권1호
    • /
    • pp.4296-4311
    • /
    • 1977
  • This study was conducted to derive an Instantaneous Unit Hydrograph for the accurate and reliable unitgraph which can be used to the estimation and control of flood for the development of agricultural water resources and rational design of hydraulic structures. Eight small watersheds were selected as studying basins from Han, Geum, Nakdong, Yeongsan and Inchon River systems which may be considered as a main river systems in Korea. The area of small watersheds are within the range of 85 to 470$\textrm{km}^2$. It is to derive an accurate Instantaneous Unit Hydrograph under the condition of having a short duration of heavy rain and uniform rainfall intensity with the basic and reliable data of rainfall records, pluviographs, records of river stages and of the main river systems mentioned above. Investigation was carried out for the relations between measurable unitgraph and watershed characteristics such as watershed area, A, river length L, and centroid distance of the watershed area, Lca. Especially, this study laid emphasis on the derivation and application of Instantaneous Unit Hydrograph (IUH) by applying Nash's conceptual model and by using an electronic computer. I U H by Nash's conceptual model and I U H by flood routing which can be applied to the ungaged small watersheds were derived and compared with each other to the observed unitgraph. 1 U H for each small watersheds can be solved by using an electronic computer. The results summarized for these studies are as follows; 1. Distribution of uniform rainfall intensity appears in the analysis for the temporal rainfall pattern of selected heavy rainfall event. 2. Mean value of recession constants, Kl, is 0.931 in all watersheds observed. 3. Time to peak discharge, Tp, occurs at the position of 0.02 Tb, base length of hlrdrograph with an indication of lower value than that in larger watersheds. 4. Peak discharge, Qp, in relation to the watershed area, A, and effective rainfall, R, is found to be {{{{ { Q}_{ p} = { 0.895} over { { A}^{0.145 } } }}}} AR having high significance of correlation coefficient, 0.927, between peak discharge, Qp, and effective rainfall, R. Design chart for the peak discharge (refer to Fig. 15) with watershed area and effective rainfall was established by the author. 5. The mean slopes of main streams within the range of 1.46 meters per kilometer to 13.6 meter per kilometer. These indicate higher slopes in the small watersheds than those in larger watersheds. Lengths of main streams are within the range of 9.4 kilometer to 41.75 kilometer, which can be regarded as a short distance. It is remarkable thing that the time of flood concentration was more rapid in the small watersheds than that in the other larger watersheds. 6. Length of main stream, L, in relation to the watershed area, A, is found to be L=2.044A0.48 having a high significance of correlation coefficient, 0.968. 7. Watershed lag, Lg, in hrs in relation to the watershed area, A, and length of main stream, L, was derived as Lg=3.228 A0.904 L-1.293 with a high significance. On the other hand, It was found that watershed lag, Lg, could also be expressed as {{{{Lg=0.247 { ( { LLca} over { SQRT { S} } )}^{ 0.604} }}}} in connection with the product of main stream length and the centroid length of the basin of the watershed area, LLca which could be expressed as a measure of the shape and the size of the watershed with the slopes except watershed area, A. But the latter showed a lower correlation than that of the former in the significance test. Therefore, it can be concluded that watershed lag, Lg, is more closely related with the such watersheds characteristics as watershed area and length of main stream in the small watersheds. Empirical formula for the peak discharge per unit area, qp, ㎥/sec/$\textrm{km}^2$, was derived as qp=10-0.389-0.0424Lg with a high significance, r=0.91. This indicates that the peak discharge per unit area of the unitgraph is in inverse proportion to the watershed lag time. 8. The base length of the unitgraph, Tb, in connection with the watershed lag, Lg, was extra.essed as {{{{ { T}_{ b} =1.14+0.564( { Lg} over {24 } )}}}} which has defined with a high significance. 9. For the derivation of IUH by applying linear conceptual model, the storage constant, K, with the length of main stream, L, and slopes, S, was adopted as {{{{K=0.1197( {L } over { SQRT {S } } )}}}} with a highly significant correlation coefficient, 0.90. Gamma function argument, N, derived with such watershed characteristics as watershed area, A, river length, L, centroid distance of the basin of the watershed area, Lca, and slopes, S, was found to be N=49.2 A1.481L-2.202 Lca-1.297 S-0.112 with a high significance having the F value, 4.83, through analysis of variance. 10. According to the linear conceptual model, Formular established in relation to the time distribution, Peak discharge and time to peak discharge for instantaneous Unit Hydrograph when unit effective rainfall of unitgraph and dimension of watershed area are applied as 10mm, and $\textrm{km}^2$ respectively are as follows; Time distribution of IUH {{{{u(0, t)= { 2.78A} over {K GAMMA (N) } { e}^{-t/k } { (t.K)}^{N-1 } }}}} (㎥/sec) Peak discharge of IUH {{{{ {u(0, t) }_{max } = { 2.78A} over {K GAMMA (N) } { e}^{-(N-1) } { (N-1)}^{N-1 } }}}} (㎥/sec) Time to peak discharge of IUH tp=(N-1)K (hrs) 11. Through mathematical analysis in the recession curve of Hydrograph, It was confirmed that empirical formula of Gamma function argument, N, had connection with recession constant, Kl, peak discharge, QP, and time to peak discharge, tp, as {{{{{ K'} over { { t}_{ p} } = { 1} over {N-1 } - { ln { t} over { { t}_{p } } } over {ln { Q} over { { Q}_{p } } } }}}} where {{{{K'= { 1} over { { lnK}_{1 } } }}}} 12. Linking the two, empirical formulars for storage constant, K, and Gamma function argument, N, into closer relations with each other, derivation of unit hydrograph for the ungaged small watersheds can be established by having formulars for the time distribution and peak discharge of IUH as follows. Time distribution of IUH u(0, t)=23.2 A L-1S1/2 F(N, K, t) (㎥/sec) where {{{{F(N, K, t)= { { e}^{-t/k } { (t/K)}^{N-1 } } over { GAMMA (N) } }}}} Peak discharge of IUH) u(0, t)max=23.2 A L-1S1/2 F(N) (㎥/sec) where {{{{F(N)= { { e}^{-(N-1) } { (N-1)}^{N-1 } } over { GAMMA (N) } }}}} 13. The base length of the Time-Area Diagram for the IUH was given by {{{{C=0.778 { ( { LLca} over { SQRT { S} } )}^{0.423 } }}}} with correlation coefficient, 0.85, which has an indication of the relations to the length of main stream, L, centroid distance of the basin of the watershed area, Lca, and slopes, S. 14. Relative errors in the peak discharge of the IUH by using linear conceptual model and IUH by routing showed to be 2.5 and 16.9 percent respectively to the peak of observed unitgraph. Therefore, it confirmed that the accuracy of IUH using linear conceptual model was approaching more closely to the observed unitgraph than that of the flood routing in the small watersheds.

  • PDF