• Title/Summary/Keyword: pavement preparation

Search Result 10, Processing Time 0.029 seconds

Analytic Hierarchical Procedure and Economic Analysis of Pneumatic Pavement Crack Preparation Devices

  • Park, JeeWoong;Cho, Yong K.;Wang, Chao
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.44-52
    • /
    • 2015
  • Various approaches have been used in crack preparations and each of the approaches has advantages and disadvantages. Although the routing method has been widely used and seems to be the best approach among the approaches, it is not a complete solution for crack preparation. This paper compares and evaluates a pneumatic crack cleaning device (CCD) developed by Robotics and Intelligent Construction Automation group at Georgia Tech, over existing devices. Surveys were conducted to discover factors that affect the performance of crack/joint preparation work. Then, data for such information were collected via field tests for devices such as router, heat lancer, air blower and CCD. Performed field test results and follow-up interviews demonstrated that the utilization of CCD has potential to offer improvements in productivity, safety, and maintenance cost. An analytic hierarchical procedure (AHP) and economic analyses were conducted. The AHP analysis considered three factors including safety, quality and productivity while the economic analyses examined the alternatives in various ways. The results indicated that the CCD was ranked first and second for the AHP analysis and economic analysis, respectively. In conclusion, the field tests and results revealed that the utilization of CCD achieved satisfactorily in performance, quality, safety and control, and showed that it has high potential in crack cleaning practice.

Preparation and Water Quality Purification of Permeable Concrete Pavement Filled with Microbial-Soil Sheet (미생물토양시트를 충진한 도로포장용 다공성 콘크리트의 제조 및 수질정화특성)

  • Kang, Young-Heoun;Hwang, Pil-Gi;Kang, Seon-Hong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.6
    • /
    • pp.727-733
    • /
    • 2009
  • This study was performed to investigate the physical characteristics like compressive strength, permeability, porosity and the water quality removal characteristics of permeable concrete pavement filled with microbial-soil sheet to remove SS, organic matter and nutrients in artificial rainfall. As a result, it can show the removal efficiency is SS 90~95%, COD 85~93%, BOD 80~83%, T-N 61~75%, T-P 71~78% on WAPS I(W1) and WAPS II(W2). Therefore, permeable concrete pavement filled with microbial-soil sheet shows higher removal efficiency(SS 10%, organic matter and nutrients 30%) than a conventional porous concrete(W3). By filling microbial-soil sheet to permeable concrete pavement, we confirm that the function and efficiency are improved significantly and that a naturally-friendly facility can be developed and applied to treat non-point sources.

Performance of Geogrids for Retarding Reflection Crack of Asphalt Overlay Pavement (아스팔트 덧씌우기의 반사균열 지연을 위한 지오그리드의 적용성 연구)

  • Kim, Kwang-Woo;Doh, Young-Soo;Kim, Bun-Chang;Lee, Moon-Sup
    • International Journal of Highway Engineering
    • /
    • v.7 no.2 s.24
    • /
    • pp.1-12
    • /
    • 2005
  • This study was conducted to evaluate effect of geogrid and fabric, which are used underneath the overlaid asphalt pavement for retarding reflection cracking by simulated laboratory test. In this study, an interlayer at the interface between old concrete pavement surface and overlaid asphalt mixture, and polymer-modifier were used as an effort of retarding reflection crack initiation and for strengthening mixture. Five products were used in preparation of asphalt concrete beam specimen which was tack coated on top of jointed concrete block. Simulated Mode I and II fracture test were conducted under wheel loading and results were compared among those products. From the test results, several material and reinforcement combinations were observed to have a significant retardation effect against reflection cracking. The most effectively strengthened pavement against reflection cracking was found to be the LDPE-modifier asphalt mixture with a grid reinforcement at the bottom.

  • PDF

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

Field Application of an Eco-Friendly Solidification Material for Forest Road Pavement (친환경 고화재를 이용한 임도포장의 현장 적용성 연구)

  • Lee, Kwan-Hee;Ko, Chi-Ung;Kim, Dong-Hyun;Oh, Se-Wook;Kim, Dong-Geun
    • Journal of Korean Society of Forest Science
    • /
    • v.106 no.1
    • /
    • pp.70-76
    • /
    • 2017
  • Among the forest road pavement methods, the majority of current constructions utilize concrete pavements but it has disadvantages as follows: many cracked concrete pavements generated by the erosion of underlying soil layers, could not be used as forest roads in steep slope during winter, and cement contains hazardous chemicals (hexavalent chromium, etc.). In order to supplement the limitations of the use of concrete pavement, this study was conducted to investigate the operation process and cost, the strength and compaction of the experimental forest road pavement(85 m) utilizing eco-friendly solidification material at Goryeong-gun, Gyeongsangbuk-do. The work elements of experimental forest road paving were classified into: preparation, Roadbed excavation, Roadbed grading, subgrade compaction, form work, collection and selection of site soil, mixing site soil and eco-friendly solidification material, paving by eco-friendly solidification material, compaction by vibrating roller and curing. The result of economic analysis using construction cost shows that for concrete costs total to $38,681won/m^3$ while for the eco-friendly paving material it is $38,245won/m^3$. Thus the construction costs for concrete and the eco-friendly paving material are similar. And the results of the Schmidt Hammer test for strength analysis by curing period are 10.5-13.5 MPa for 7 days, 18.1-22.7 MPa for 14 days, and 20.8-23.0 MPa for 28 days.

Development of Moisture Loss Index Based on Field Moisture Measurement using Portable Time Domain Reflectometer (TDR) for Cold In-place Recycled Pavements (휴대용 TDR 함수량계로 측정한 현장 함수비를 이용한 현장 상온 재활용 아스팔트 포장의 수분 감소계수 개발)

  • Kim, Yong-Joo;Lee, Ho-Sin David;Im, Soo-Hyok
    • International Journal of Highway Engineering
    • /
    • v.13 no.2
    • /
    • pp.139-145
    • /
    • 2011
  • The practice of asphalt pavement recycling has grown rapidly over the decade, one of which is the cold in-place recycling with the foamed asphalt (CIR-foam) or the emulsified asphalt (CIR-emulsion). Particularly, in Iowa, the CIR has been widely used in rehabilitating the rural highways because it significantly increases the service life of the existing pavement. The CIR layer is typically overlaid by the hot mix asphalt (HMA) to protect it from water ingress and traffic load and obtain the required pavement structure and texture. Most public agencies have different curing requirements based on the number of curing days or the maximum moisture contents for the CIR before placing the overlay. The main objective of this study is to develop a moisture loss index that the public agency can use to monitor the moisture content of CIR layers in preparation for a timely placement of the wearing surface. First, the moisture contents were measured in the field using a portable time domain reflectometry (TDR) device. Second, the weather information in terms of rain fall, air temperature, humidity and wind speed was collected from the same location. Finally, a moisture loss index was developed as a function of initial moisture content, air temperature, humidity and wind speed. The developed moisture loss index based on the field measurements would help the public agency to determine an optimum timing of an overlay placement without continually measuring moisture conditions in the field.

Unconfined Compressive Strength of Soil-Cement Pavement with Recycled Red Mud (레드머드가 첨가된 흙-시멘트 포장의 일축압축강도)

  • Lee, Yunkyu;Baek, Seungcheol;Holtz, R.D.;Jeong, Dongyoung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.7
    • /
    • pp.37-43
    • /
    • 2008
  • The unconfined compressive strength of soil-cement mixed with red mud, an industrial by-product of alumina production, was investigated in the laboratory. The investigation involved laboratory tests under the various conditions such as red mud content, cement content, fly ash content and ratio of soil replacement with sands. The unconfined compressive strength tests were performed at 7, 14 and 21 days after specimen preparation. Results of the study show that the unconfined compressive strength increased as red mud and fly ash content decreased and cement content increased. Increasing the soil replacement ratio with sands had an insignificant effect on compressive strength because the soil had a similar particle size as the replacement sands.

  • PDF

Current Status of Management on Pharmacopuncture in Korea through Introduction of an Accreditation System

  • Sung, Soo-Hyun;Shin, Byung-Cheul;Park, Min-Jung;Kim, Kyeong Han;Kim, Ji-Won;Ryu, Ji-Yeon;Park, Jang-Kyung
    • Journal of Pharmacopuncture
    • /
    • v.22 no.2
    • /
    • pp.75-82
    • /
    • 2019
  • Objectives: Pharmacopuncture is a new form of acupuncture treatment that injects herbal medicine into acupuncture points. This paper introduces the management status of pharmacopuncture through accreditation, and examines the effect of accreditation on pharmacopuncture management. Methods: The Accreditation System of External Herbal Dispensaries (EHDs) of traditional Korean medicine clinics announced by the Ministry of Health and Welfare in September 2018 were investigated. Results: The Accreditation System of EHDs assesses and certifies herbal medicine and pharmacopuncture preparations. Regular components for the 'pharmacopuncture' certification consist of nine standards, 30 categories, and 165 items. The nine standards include: herbal dispensary facilities, clean room management, management and organization operation, employee management, document management, continuous quality control, herbal medicine management, management of preparation, and pavement management. Conclusion: Through EHD accreditation and certification system, traditional Korean medicine clinics and EHDs can now manage pharmacopuncture medicine quality and promise safe pharmacopuncture treatment for the people.

Estimating Concrete Compressive Strength Using Shear Wave Velocity (전단파 속도를 이용한 콘크리트의 압축강도 추정연구)

  • An, Ji-Hwan;Nam, Jeong-Hee;Kwon, Soo-Ahn;Joh, Sung-Ho
    • International Journal of Highway Engineering
    • /
    • v.10 no.3
    • /
    • pp.171-178
    • /
    • 2008
  • Compressive strength of concrete has been regarded as a very important parameter of the quality control both in new and existing concrete pavement. It has been used a lot as the concrete strength evaluation both in the various-mixture-using laboratory and construction field using the same mixture. An error usually occurs in the test experiments of the strength, even in the test experiments with evenly mixed and compacted specimens of the compressive strength. It is caused by the 'manually operated' compressing testing, or by the specimens preparation with eccentricity. When compressive strength of evenly mixed concrete is investigated by the curing ages at the construction field, there have to be lots of specimens. And it needs much labor and cost. To substitute the endlessly repeated test experiments of compressive strength, presumption of compressive strength, by nondestructive tests, is needed. In this study, elastic waves were used among various nondestructive tests. Compressive strength of concrete was presumed according to the curing ages, by using the shear wave velocity which is not affected by restricted conditions. In the result, shear wave velocity is very closely related to the compressive strength at the evenly mixed concrete.

  • PDF

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.