• Title/Summary/Keyword: parking lots

Search Result 284, Processing Time 0.027 seconds

A Plan for the Application of CPTED to the Developed Apartment Complex (기 개발 아파트단지의 범죄예방 환경설계(CPTED) 적용 방안)

  • Kim, Nam-Jung;Moon, Hyo-Gon;Kang, Myung-Soo
    • Land and Housing Review
    • /
    • v.5 no.4
    • /
    • pp.271-279
    • /
    • 2014
  • Most CPTED have currently applied to newly developing apartment complexes. but developed apartment complexes are relatively vulnerable to crime due to lack of CPTED considerations. This study has examined both crime prevention preferences space and facilities considering the cost of CPTED. This study suggests plans of the CPTED application to the developed apartment complex without changing existing physical environment. The entrance of apartment complexes, underground parking lots, parks and rest areas, elevators, stairs and aisle in side of the buildings should be given top priority. The next are pedestrians roads, fences, main entrance on the first floor. Lastly, shopping store facilities and the ground parking lots are among the last ones.

Deep-Learning-Based Water Shield Automation System by Predicting River Overflow and Vehicle Flooding Possibility (하천 범람 및 차량 침수 가능성 예측을 통한 딥러닝 기반 차수막 자동화 시스템)

  • Seung-Jae Ham;Min-Su Kang;Seong-Woo Jeong;Joonhyuk Yoo
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.18 no.3
    • /
    • pp.133-139
    • /
    • 2023
  • This paper proposes a two-stage Water Shield Automation System (WSAS) to predict the possibility of river overflow and vehicle flooding due to sudden rainfall. The WSAS uses a two-stage Deep Neural Network (DNN) model. First, a river overflow prediction module is designed with LSTM to decide whether the river is flooded by predicting the river's water level rise. Second, a vehicle flooding prediction module predicts flooding of underground parking lots by detecting flooded tires with YOLOv5 from CCTV images. Finally, the WSAS automatically installs the water barrier whenever the river overflow and vehicle flooding events happen in the underground parking lots. The only constraint to implementing is that collecting training data for flooded vehicle tires is challenging. This paper exploits the Image C&S data augmentation technique to synthesize flooded tire images. Experimental results validate the superiority of WSAS by showing that the river overflow prediction module can reduce RMSE by three times compared with the previous method, and the vehicle flooding detection module can increase mAP by 20% compared with the naive detection method, respectively.

Establishment of a Estimation Model of On-Road and Off-Road Parking Demand Based on the Total Floor Area of Buildings (건축물 연면적에 따른 노상·노외 주차수요 산정 모형 구축)

  • Je mo Nam;Young woo Lee
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.22 no.2
    • /
    • pp.44-53
    • /
    • 2023
  • Recently, serious parking problems are occurring due to the difficulty of securing sufficient parking space, and it may lead to other traffic or social problems. In order to solve the parking problem in areas and districts beyond a certain range, a study on-roads and off-street parking lots reflecting regional characteristics is necessary. Therefore, this study establishing a parking demand calculation model for use as a basic study in establishing on-road and off-road characteristics. In order to conduct the study, Dong-fu, Daegu Metropolitan City was divided into dongs, and parking facilities and parking demand were investigated. The survey time was divided into daytime and nighttime on weekdays, and the types of vehicles were divided into three types: passenger car, small trucks and buses, large trucks and buses. As explanatory variables for calculating parking demand, the total floor area of buildings for each of six purposes was used, including detached houses, apartment houses, neighborhood living facilities, cultural and assembly facilities, business facilities, and sales facilities. As a result of the correlation analysis, among the six explanatory variables, the total area of neighborhood living facilities showed a significant correlation with on- and off-street parking demand. A regression analysis model was constructed using the total area of neighborhood living facilities as an explanatory variable, and statistically significant results were obtained.

A Study of Electronic Vehicle Charging Station Structure System Using PV(Photovoltaic) System (PV 시스템을 이용한 전기자동차 충전소의 구조시스템 연구)

  • Lim, Jae-Hwi;Yoon, Sung-Won
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.1
    • /
    • pp.105-112
    • /
    • 2011
  • Fundamental Electric vehicle charge system is urgently needed for commercialization of electric vehicles. Car parking building is equipped with PV system for providing electricity to charge electric vehicles, because it must be charged at least for 30 minutes. In parking lots abroad, electric car charging stations are installed to charge electric cars by the electricity gained from PV systems which are also installed. Also, charge infrastructure construction plans and electric car charging facility support standards are being set and proposed, but there are no cases like abroad of electric car charging stations using PV systems and only electric car charging stations using ordinary electricity are being proposed. Therefore, this paper prepares establishment of domestic electric car charging networks. By researching inside outside solar parking lots and cases of abroad PV system electric car charging stations, and by analysis and comparative analysis of structural systems, structural material, and etc., many cantilever structure and small-size types were installed in PV system electric car charging stations.

A Study on the Change of Architecture Density and Residential Environment according to Reconstruction (재건축에 따른 건축밀도 및 주거환경의 변화 연구)

  • Kim, Hong-Bae
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.19 no.1
    • /
    • pp.35-42
    • /
    • 2017
  • This study aims to investigate the change in building density and residential environment after the reconstruction of decrepit public rental housing complexes formed in accordance with the Land Readjustment Project during the 1970s-80s. The results of this study can be summarized as follows: First, in terms of change in residential environment after the reconstruction, floor plans that were limited to two to four types and to small apartments measuring $42.9m^2$(13py)-$56.1m^2$ (17py) became varied, presenting 5-6 types of floor plans and various sizes of apartments. In particular, the reconstructed apartments were mainly built in a size smaller than 85($m^2$) and in the 3LDK floor plan and staircase-style unit architectural structure in order to reflect the lifestyle of residents. Second, in terms of change in building density after the reconstruction, the building coverage ratio did not change a lot, but the floor area ratio showed great change depending on the complex, ranging from a minimum of 2.9 times (Singdong Complex) to a maximum of 5.4 times (Eoyangdong Complex). Such change is attributable to the reconstruction policy that aims to improve the residential environment for original residents, secure economic feasibility and efficiency, and reflect the lifestyle of residents while incorporating dividends assigned to the existing housing project members as well as the maximum floor area ratio allowed by the regulation. Additionally, in terms of change in the number of floors and building density after the reconstruction, the former 5-story apartments were changed to apartments with 16-28 stories. Accordingly, the number of households in each complex has also increased by 20%. Third, according to the characteristics of parking facilities in terms of the size and density of parking spaces, former apartment complexes had only aboveground parking lots, not underground parking area. The newly constructed apartment complexes have underground parking space, and the parking-housing ratio is 1.1-1.3 cars.

Analysis of runoff reduction and storage capacity in permeable pavement parking lot (투수성 주차장에서의 강우 유출저감 및 저류용량 분석)

  • Jung, Yongjun;Min, Kyungsok
    • Journal of Wetlands Research
    • /
    • v.19 no.3
    • /
    • pp.296-302
    • /
    • 2017
  • Generally, a parking lot is constructed using asphalt or concrete. Such materials are impermeable, which means that a parking lot will directly release pollutants to any nearby water system during a rainfall event. An increased quantity of nonpoint source pollutants harms the ecohydrological system and causes further environmental damage leading to dysfunctional water circulation systems. Therefore, there is an urgent need for the design and application of Low Impact Development (LID) systems that allow more effective prevention of water circulation problems and management of nonpoint source pollution. This study aims to support such efforts by analyzing a permeable paver parking lot constructed using one of the LID techniques and comparing it to a conventional one in terms of the concentration of pollutants, nonpoint source pollution load and runoff rainfall lag effects during a rainfall event; it could serve as a reference for the construction of permeable paver parking lots in the future.

The Development of a Model for Selecting Method of Entry for Apartment in Remodeling an Underground Parking Lot (지하주차장 리모델링 공사시 주동진입방법 선정 모델 개발)

  • Song, Nak-Hyun;Jung, In-Su;Lee, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.65-74
    • /
    • 2009
  • It is expected that the number of apartment complexes in Korea that are over 20 years old will rapidly increase to more than 3,500,000. Consequently, the remodeling of these buildings is being revitalized throughout the country. Among the requirements for such remodeling, the expansion of parking lots has considerable weight. When enlarging a parking lot, the access route from an underground floor to the main building (i.e., the means of entry into the main building) determines the possibility of vertical enlargement for elevators, the size of the parking lot, the construction period, and construction expenses, etc. When enlarging an underground parking lot of an apartment complex, the access between the main building and the parking lot, as well as the inhabitants' requirements for entering the main building, are generally determined based on the designer's experience, rather than on the exact estimation of the peculiarity of the complex. In order to resolve such a problem, when enlarging an underground parking lot, a systematic and rational method is needed for selecting the means of entry into the main building. In this study, a selection model is derived for the method of selecting an access route into the main building when constructing an underground parking lot, in order to provide a reasonable decision-making process. A research method was investigated for determining the access route into the main building when enlarging a parking lot. On the basis of research carried out through in-depth interviews with experts, the characteristics for each means of entry into the main building were analyzed and the factors affecting the selection of the access route were deduced. The affecting factors selected were construction efficiency, convenience efficiency and economic efficiency. Weight values were then estimated for the selected affecting factors by applying the AHP method. Results showed that convenience efficiency, which gained the highest value, is the most important factor in selecting the means of entry into the main building. The most suitable means of entry into the main building was also suggested after estimating the applicability of the site by selecting complexes with remodeling possibility. This study will be applied as a reference for selecting the means of entry into the main building when constructing an underground parking lot particularly for older apartment complexes.

A Study on the Comparative Analysis and Utilization of Evacuation Time according to Variation of Modelling of Behavior Modes: Focusing on the Case of Underground Parking Lot (행동모드 변화 모델링에 따른 피난시간 비교분석과 활용방안 연구: 지하 주차장 사례를 중심으로)

  • Gi-gyeong Koo
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.2
    • /
    • pp.284-292
    • /
    • 2024
  • Purpose: Compared to general fires of the same size, underground parking lot fires are more likely to cause human and property damage and are not easy for firefighters to extinguish fire and save lives. This study attempted to find out how to secure the evacuation safety of parking lot users based on changes in the evacuation simulation behavior mode applied to evaluate the evacuation safety of the object. Method: Simulation for each CASE was performed using the Pathfinder program. Result: it was found that the higher the reference value, the higher the evacuation time, and Behavior showed an increase in time in SFPE mode rather than Steering mode. Priority was able to confirm an increase in time in priority designation rather than non-priority designation. Conclusion: The Required Safe Egress Time (RSET) for evaluating the evacuation safety of underground parking lots and the building evacuation design to ensure evacuation safety should be evaluated and reflected separately from Simulation's Behaviour Mode and Priority.

Indoor and Outdoor Formaldehyde Concentrations in Underground Environments (실내외 포름안데히드 농도에 관한 조사연구)

  • 김윤신;김미경
    • Journal of Environmental Health Sciences
    • /
    • v.15 no.2
    • /
    • pp.1-9
    • /
    • 1989
  • A pilot study was conducted in order to measure indoor and outdoor formaldehyde levels during August 3 - 22, 1988 in several underground spaces in Seoul. Formaldehyde concentrations were monitored during 1 week in selected sampling areas (subway station, underground shopping center, underpass, tunnel, underground parking lot) using passive formaldehyde monitors. In order to investigate a relationship between respiratory prevalence and levels of formaldehyde, each subject was asked to answer respiratory questions. The mean formaldehyde concentrations were 60.1 ppb in subway station, 122.2 ppb in underground shopping stores, 72.1 ppb in underpasses, 39.7 ppb in tunnel, and 75.9 ppb in underground parking lots, respectively. The mean indoor formaldehyde concentrations in underground environments varied from 28.6 ppb to 118.7 ppb. Generally, the mean formaldehyde concentrations in ticketing office in subway stations appeared higher than those level measured in platform. The mean formaldehyde concentrations of underground shopping center in Gangnam Terminal were higher than any other areas and it exceeded 100 ppb of the American Ambient Air Quality Standards of formaldehyde. Prevalence rates of respiratory symptoms of dwellers seemed to be related to higher indoor formaldehyde levels.

  • PDF

The Analysis of the Situation of Residential Area and Difficulties in Developing (도심 주거지의 실태와 개발 장애요인 분석)

  • 임준홍;김한수
    • Journal of the Korean housing association
    • /
    • v.14 no.1
    • /
    • pp.51-59
    • /
    • 2003
  • This study is to analyze the situation of residential area in Down Town and to research any factor of difficulty in developing residential area. First, we can summarize briefly in consequence of analyzing the residential environment classified with apartment and independent house in Down Town. 1) The apartment houses located in Down Town were constructed long ago on a small scale. The field investigation shows that parking lots are not enough and there are many spaces used inappropriately. 2) Each detached house was too old and built in narrow spaces. The irregular narrow lanes between houses also cause problems in walking and parking. And empty houses are found in that area. Second, the brief results of analyzing difficulties in developing the residential area in Down Town are as follows. 1) The land and buildings have difficulty in reconstruction because of the deterioration. 2) The economical efficiency is low though it is developed as a residential area. 3) There are some factors that they don't like to live in Down Town. 4) The law system is not enough to support the development of the residential area in Down Town